Loading...
HomeMy WebLinkAbout20150392 Ver 1_More Info Received_20150526 (3)LO I- NOTE: MATTING SHALL BE COIR FIBER, 750 GRAM PER SQ. METER WITH NOMINAL 0.50 IN. OPENING SIZE. Lp 0 LO LO 0 N O N LO ANCHOR MATTING a, IN 8" TRENCH 1' MIN. coo I�-�i E U E M fD L SMOOTH SURFACE, REMOVE ALL — 4= DEBRIS AND SEED /MULCH BEFORE t PLACING MATTING 'o To be used for minor stream crossing locations MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWNSTREAM /DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN 6119OW_1L■00111 ° 1 EXTEND MATTING A MIN. OF CL MATTING ANCHORED 6" BELOW STREAM BED. v 1' BELOW STREAM BED DEPTH VARIES a� � c J Q E PROPOSED UTILITY o PIPE LINE U c 0 1 Preliminary Not for Construction