HomeMy WebLinkAbout20150392 Ver 1_More Info Received_20150526 (2)NOTE: ALL STREAMBANK RESTORATION AND
STABILIZATION SHALL RESULT IN A FINISH
GRADE TO ORIGINAL CONTOURS, UNLESS
SPECIFIED OR DIRECTED OTHERWISE
BY THE ENGINEER IN WRITING i
PLACE CLASS I RIP —RAP TO
VERTICAL DISTANCE ABOVE
STREAMBED AS SPECIFIED ON
THE DRAWINGS —\
BACKFILL
STREAMBED
WITH NATIVE
MATERIALS
a
H
MIN.
INSTALL ANCHORS IN
ACCORDANCE WITH
MANUFACTURERS
RECOMMENDATIONS
PLACE EXCELSIOR
ABOVE RIP —RAP
EXTEND TWO FEET
BEYOND TOP OF BANK
TOE IN 12 INCHES
12"
12
FILTER FABRIC
i
CONCRETE ENCASEMENT
AS SPECIFIED
OVERLAP 6"
MINIMUM
EXIST. GRADE
STREAM BANK RESTORATION DETAIL
NOT TO SCALE