Loading...
HomeMy WebLinkAbout20150392 Ver 1_More Info Received_20150526 (2)NOTE: ALL STREAMBANK RESTORATION AND STABILIZATION SHALL RESULT IN A FINISH GRADE TO ORIGINAL CONTOURS, UNLESS SPECIFIED OR DIRECTED OTHERWISE BY THE ENGINEER IN WRITING i PLACE CLASS I RIP —RAP TO VERTICAL DISTANCE ABOVE STREAMBED AS SPECIFIED ON THE DRAWINGS —\ BACKFILL STREAMBED WITH NATIVE MATERIALS a H MIN. INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS PLACE EXCELSIOR ABOVE RIP —RAP EXTEND TWO FEET BEYOND TOP OF BANK TOE IN 12 INCHES 12" 12 FILTER FABRIC i CONCRETE ENCASEMENT AS SPECIFIED OVERLAP 6" MINIMUM EXIST. GRADE STREAM BANK RESTORATION DETAIL NOT TO SCALE