Loading...
HomeMy WebLinkAbout41659.054-PERM-WTIM_Phase2 (2)DOL DOL DOL DOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL 425-WetlandTemporary:55,166sq ft 427-WetlandPermanent:142,961sq ft 429-WetlandTemporary:39,566sq ft 430-DitchTemporary:4,825sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd Legend StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 180 36090 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 1 1 " = 180 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL 426-DitchTemporary:26sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd Legend StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 2 1 " = 30 ' DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOLDOLDOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL 425-WetlandTemporary:55,166sq ft 427-WetlandPermanent:142,961sq ft 429-WetlandTemporary:39,566sq ft 429-WetlandTemporary:6,033sq ft427-WetlandTemporary:5,221sq ft 427-WetlandTemporary:5,369sq ft 427-WetlandTemporary: 8,774sq ft 430-DitchTemporary:4,825sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd Legend StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 240 480120 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 3 1 " = 240 '