HomeMy WebLinkAbout41659.054-PERM-WTIM_Phase1 (2)DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
OL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGUD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
180-WetlandPermanent:79sq ft
175-WetlandConversion:11sq ft
175-WetlandConversion:2,108sq ft
181-DitchTemporary: 83sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
1
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
OL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
180-WetlandPermanent:79sq ft
175-WetlandConversion:11sq ft
175-WetlandConversion:2,108sq ft
181-DitchTemporary: 83sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
2
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
OL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
180-WetlandPermanent:79sq ft
175-WetlandConversion:11sq ft
175-WetlandConversion:2,108sq ft
181-DitchTemporary: 83sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
3
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
OL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
P
G
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PG
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
P
G
U
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
DD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
180-WetlandPermanent:79sq ft
175-WetlandConversion:11sq ft
175-WetlandConversion:2,108sq ft
181-DitchTemporary: 83sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
4
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DO LDOLDOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DO
L
DO
L
DO
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
281-WetlandPermanent:79sq ft
260-WetlandConversion:1,523sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
5
1 " = 30 '
DOL
DOL
DOL
DOL
D O L
D O L
D O L
D
O
L
D
O
L
D
O
L
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D O L
D O L
D
OL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
D
O
L
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL DOL DOL DOL DOL
DOL
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
D
O
L
D
O
L
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D D D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D
D
D
276-WetlandPermanent:6,598sq ft
275-DitchPermanent:219sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
6
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D O L
DOL
DOL
DOL
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
D
O
L
DOL
DOL
DOL
DOL
D O L
D O L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
DOL
DOL
DOL
D O L
DOL
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D
D
D
D
D
D D D
D
D
D
D
D
D
D
D
D
D D D
276-WetlandPermanent: 6,598sq ft
275-DitchPermanent:219sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
7
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DO LDOLDOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DO
L
DO
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
P
G
U
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
PGU
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
281-WetlandPermanent:79sq ft
260-WetlandConversion:1,523sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
8
1 " = 30 '
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
419-WetlandPermanent:79sq ft
418-WetlandPermanent:79sq ft
417-WetlandPermanent:79sq ft
412-WetlandConversion:25,510sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 120 24060
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
9
1 " = 120 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
O
L
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
417-WetlandPermanent:79sq ft 412-WetlandConversion:25,510sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
10
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
418-WetlandPermanent:79sq ft
412-WetlandConversion:25,510sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
11
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
419-WetlandPermanent:79sq ft
412-WetlandConversion:25,510sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
12
1 " = 30 '
DOLDOLDOLDOLDOLDOLDOLDOLDOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D D D D D D D D D
425-WetlandTemporary: 0sq ft
427-WetlandPermanent:118,176sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
13
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
426-DitchPermanent:123sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
14
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
OL
D
D
D
D
D
D
DD
DD
D
D
D
D
D
425-WetlandTemporary:0sq ft
427-WetlandPermanent:118,176sq ft
429-WetlandTemporary:17,785sq ft
429-WetlandTemporary:958sq ft
427-WetlandTemporary:2sq ft
429-WetlandConversion: 335sq ft
428-DitchPermanent:101sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 390 780195
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
15
1 " = 390 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D O L
D O L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D O L
D O L
D O LDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
427-WetlandPermanent:118,176sq ft
429-WetlandTemporary:17,785sq ft
427-WetlandTemporary: 2sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
16
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
427-WetlandPermanent:118,176sq ft
428-DitchPermanent:101sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
17
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D 427-WetlandPermanent:118,176sq ft
429-WetlandTemporary:17,785sq ft
429-WetlandTemporary:958sq ft
429-WetlandConversion:335sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
18
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D OL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D O LDOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D
D
D
427-WetlandPermanent:118,176sq ft
429-WetlandTemporary:17,785sq ft
429-WetlandTemporary:958sq ft
427-WetlandTemporary: 2sq ft
429-WetlandConversion:335sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 90 18045
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
19
1 " = 90 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
427-WetlandPermanent:118,176sq ft
429-WetlandTemporary:17,785sq ft
429-WetlandTemporary:958sq ft
429-WetlandConversion:335sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
20
1 " = 30 '