Loading...
HomeMy WebLinkAboutNC0024112_2022 PAR Review_20230502Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ❑ No ® **rec'd an extention to 4/1/2023 Does it have two copies? Yes 10 No ❑ Did they send any other submissions with it? Yes ❑ No Included? Adequate? Narrative ® Yes ❑ No ❑ NA Yes ❑ No PPS Form ® Yes ❑ No ® Yes ❑ No SNCR 0 Yes ❑ No 0 Yes ❑ No E Regional Office: Winston Salem NA POTW: Hamby Creek WWTP - Thomasville NPDES Permit # NC 0024112 Report Period: 1/1/22 to 12/31/22 IDSF I W Yes Ll No W Yes Ll No J] Full Allocation Table 19 Yes ❑ No ® Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No NA ❑ Yes ❑ No ® NA Public Notice ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA POTW noted Corrections? Program Information ® Yes ❑ No ® Yes ❑ No I ❑ Yes ® No Historical SNC ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ® No ❑ NA If Wo ; check recommendation below: ❑ Modified* 1. Have at least 90% of SIU permits been issued with 180 days ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) a ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: -Allocation Table stated McIntyre Manufacturing permit expired 6/30/22. -Corrections are needed to Historical SNC though none were noted. Reviewed by: %4zcl.�GVQi�y Date: 5/2/2023