HomeMy WebLinkAboutNCC231261_ESC Approval Submitted_20230505 iiibb
•
h_k Id, rIw.. -.
ROY COOPER ` 1[.
Governor �4"
ELIZABETH S.BISER ;-
Secretary 4
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
December 2, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
JRE Asheville, LLC
ATTN: Mr. Mark Romer
11047 Leadbetter Rd.
Ashland,VA 23005
RE: Project Name: JAMES RIVER- MILLS RIVER SITE
Acres Approved: 14.00
Project ID: HENDE-2023-013
County: Henderson
City: Mills River
Address: Fanning Fields Rd.
River Basin: French Broad 1
Stream Classification: McDowell Creek- Class C I
Submitted By: Brooks Engineering Associates - Mr. Mark Brooks, PE
Date Received by LQS: November 3, 2022
Plan Type: Commercial
Dear Mr. Romer,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval,if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(eN01) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
DE Q Asheville Regionsl Office 2090 U.S Highway 70 I Swannanoa,North Carolina 28778
NON HG4AOUNA
Depaiment of Envlognnedalu..11 828.296.4500
Letter of Approval with Modifications
Mr. Mark Romer
December 2, 2022
Page 2 of 4
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition,local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form,which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee.You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
,°—e)A..)etti----
Fred Walker, PE
Express Engineer
Division of Energy, Mineral, and Land Resources
Letter of Approval with Modifications
Mr. Mark Romer
December 2, 2022
Page 3 of 4
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications
ec: Mr. Mark Brooks, PE (mbrooks@brooksea.com)
Ms. Shawna Riddle - NCDEQ-LQS (shawna.riddle@ncdenr.gov)
Mr. Landon Davidson, PG - NCDEQ DWR (landon.davidson@ncdenr.gov)
Mr. Andrew Moore, PG- NCDEQ DWR (andrew.w.moore@ncdenr.gov)
cc: Regional Office file
Ie
fkk
Letter of Approval with Modifications
Mr. Mark Romer
December 2, 2022
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: JAMES RIVER- MILLS RIVER SITE
Project ID: HENDE-2023-013
County: Henderson
For final plan approval please provide to this office the requested documents listed below.
1. Submit a revised executed Financial Responsibility/Ownership form with Part B.2.a
completed with Mr. Richard Robertson's contact information. {G.S. 113A-54.1.(a))
2. Provide construction detail for wire back double row silt fence. {G.S. 113A-57.3}
3. Note on plan that all borrow and or waste must come from or go to a permitted site
and or facility. Contractor is to provide LQS inspector with permit number of
borrow/waste site before transporting materials. {15A NCAC 04B .0110}
4. Hatch or color areas that are required to meet NPDES NCG010000 7-day
stabilization requirements or provide call out on plan sheets. {NPDES NCG010000}
5. Differentiate which areas will receive coir matting and which areas will receive NAG
SC150.
6. Revise fertilizer detail to read that soil test recommendations must be used,generic
rates are only allowed if a soil test cannot be performed. Due to proximity to
receiving waters remove asphalt tackifier from mulching alternatives.
7. Revise construction sequence note 1 in Phase 2 to only clear and grade what is
necessary for basin construction. Sediment basins must be installed before
construction activities that will denude the site take place. Basin slopes must be
stabilized immediately. Note 5 Phase 2 should occur before Note 4. Request
inspection from inspector before converting sediment basins to post-construction
measures. Add note that no major grading activities or basin construction is to take
place during wet weather. Site must be "storm ready" before any extended breaks
in construction activities including weekends.
8. Provide verification that post-construction stormwater permitting is not required or
provide copy of approval or copy of application.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
o A� - Cd r'P r11' rp
(j V O7 -• ►-!
5• Er'
-0 I
0.1
o CD �' u,'
CA
tril
= '-- C.:::) 4 hi eD eD r) erl? F.-.•,1
• /I
N �� (i' O O cm ,r# F�
r *-1111
v
/ems
K ►t• CrirD ti
CD *1 CD Vl l'i r"y e-*
�' �"
, ,,.., c4 n p+- _ ..._ •
,,,,s'it..,:,_. „.*--..e ., c
,..4 n ,,,, eD ,..• , 1
IT
JOirri w
�+ l 1 4 A' \ it::. �j�l
�N;),1 r' bd a r?oNd�t�y�'' r�i
n o c 1 at z
a
0 WIVia.M .A - = �d
tnil !?-t- P;1J
C 'i MVI ,i F- i = CD w ~� •
.
o
o• I ,-c = l O p n = - 11% , M = (1) e-t- ,---, 01
ors. C ► . : �. �,
I AD
1-1 ) tha et) <-, n eD = s4: sl,
rD, \ t.4 C2.• ' 1. v ,,,,'"' u: c :mit )Fir P oar*
O CAr* �. `7