B-4407 site 3
channel.pdf
Here is the correct attachment.
From: Wescott, William G <wgwescott@ncdot.gov>
Sent: Thursday, May 4, 2023 11:51 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Smith, Thomas A <tasmith2@ncdot.gov>; Howard, Joel M <jmhoward@ncdot.gov>; Wescott, William G
<wgwescott@ ncdot.gov>
Subject: RE: Site inspection yesterday_B-4407 Rocky River
Mr. Wanucha,
Joel and I checked the area this morning to sort out the discrepancy.
It appears that the permit plans used the old topography/terrain map showing the channel.
The Rocky River shoreline has shifted north over the past 30+ years since the topography map was made. That channel
now connects to the Rocky River approximately 60 feet east of the new riprap for the new bridge. Pages 2 and 3 of the
attached maps show the change in the river and the channel connection.
If you need additional information please let me know.
William Wescott << File: Page 4 from NCDOT B-4407 Permit Plans.pdf >>
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Wednesday, April 26, 2023 3:50 PM
To: Smith, Thomas A <tasmith2@ncdot.gov>; Wescott, William G <wgwescott@ncdot.gov>
Subject: Site inspection yesterday_B-4407 Rocky River
To follow-up regarding my inspection, I attached two screenshots of Permit Site 3 (44'
temporary impacts to perennial stream) for a temporary pipe. The permit plansheets (also
attached) show a stream (as does the topo map). It appears to be Little Cedar Creek that splits
and then discharges to the River. A real head scratcher because I did not see any sort of
channel. Not a big deal, the drainage must all go the right instead of to the bridge. Maybe the
next time you are out there you could confirm the point where Little Cedar Creek discharges to
the river. Everything else looked ok with the turbidity curtain and NPDES records. Remind
1
them about providing more detail on the records regarding the weekly inspections—SDOs,
turbidity curtain etc. Even a little detail is better than none. Thanks. Dave W.
<< File: 20201506 Ver 2_13-4407 Anson Stanly Reverification Attachment Package_20230124.pdf >>
<< OLE Object: Picture (Device Independent Bitmap) >>
<< OLE Object: Picture (Device Independent Bitmap) >>
Dave Wanucha
Environmental Specialist 11
Transportation Permitting Branch for NCDOT Divisions 9 and 11
Division of Water Resources, Department of Environmental Quality
Office/Cell: (336) 403-5655