Loading...
HomeMy WebLinkAboutNCC200360_NOT Signed Certification_20230502 NCGO1 Notice of Termination T) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N.Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO N•T MARL THIS FORM UNTOL YOUR NOT REQUEST HAS BEEN REVOEWE D AHD APPROVED, THE FORM YOU MARL MUST BE COMPLETED%MT1 H AN ORIGINAL SOGNATURE i OOU l LU E . 22.2.2y General Permit Certificate of Coverage (COC) No.: AiC(�.20034A Name of Project: 1 hutile*AcAOS QVA,staSPR. Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record,report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief,such information is true,complete, and accurate. Legally Responsible Organizational Entity: CAP' R2\ to1;1 1115046S L C *Legally Responsible Person: J/DSO yk) Y" eRk bW Title of Legally Responsible Perso IVVrIVA5efi. *Signature: Date: 6'.1.-41-3 Print Name and Title of Signed my if authorized individual signing differs from Legally Responsible Person): *IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCG010000 permit.