Loading...
HomeMy WebLinkAbout20060684 Ver 1_Year 4 Monitoring Report_20150518�- aos�-A RECEIVED N.C. Dept. of ENR z' MAY 18 2015 WI NSTON -SALE M REGIONAL OFFICE CITY OF GREENSBORO ENGINEERING DIVISION NEW GARDEN ROAD WIDENING, PHASE II PROJECT # P -3741 CULVERT REPLACEMENT AND STREAM RELOCATION /RESTORATION HORSEPEN CREEK MAIN TRIBUTARY #2 AND TRIBUTARY A LEVEL 1 STREAM RESTORATION MONITORING FOURTH YEAR MONITORING REPORT CHANNEL STABILITY MAY 14, 2015 Prepared By: iwa� ry10, c Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C -1950 .I Cws Carolina Wetland Services, Inc. 550 East Westinghouse Blvd. Charlotte, NC 28273 TO: NCDENR, DIV. OF WATER RESOURCES DATE: MAY 15, 2015 WINSTON -SALEM REGIONAL OFFICE PROJECT: DWQ #06 -0684 450 W. HANES MILL ROAD, SUITE 300 RE: NEW GARDEN ROAD WINSTON- SALEM, NC 27105 STREAM RESTORATION ATTENTION: SUE HOMEWOOD MONITORING RECORD WE ARE SENDING YOU: ® ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ SPECIFICATIONS ❑ PLANS ❑ CHANGE ORDER ❑ LETTER ® OTHER COPIES DATE REVISION DESCRIPTION 1 05/14/2015 FOR YOUR USE LEVEL 1 STREAM RESTORATION MONITORING AS REQUESTED ❑ FOR REVIEW FOURTH YEAR MONITORING REPORT, RESUBMITTED ❑ FOR DISTRIBUTION CHANNEL STABILITY OTHER THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ® FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN COPY TO USACE, FILE SIGNED GUY B. INGLE PO Box 3136 Greensboro, VC 27402 -3136 www greensboro -nc gov 336-373-CITY (2489) TTY # 333 -6930 69City of Greensboro 6-,j North Carolina ammQ ors E2LL2�2= TO: U.S. ARMY CORPS OF ENGINEERS DATE: RALEIGH REGULATORY FIELD OFFICE PROJECT: 3331 HERITAGE TRADE DRIVE, SUITE 105 RE: WAKE FOREST, NC 27587 ATTENTION: MR. THOMAS BROWN MR. ANDREW WILLIAMS WE ARE SENDING YOU: N ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ SPECIFICATIONS ❑ CHANGE ORDER ❑ LETTER N OTHER RECEIVED N C Dept of ENR �a MAY 18 2015 �' tc jF k #'- ctions MAY 15, 2015 SAW- 2007 -03980 NEW GARDEN ROAD STREAM RESTORATION MONITORING RECORD ❑ PLANS COPIES DATE REVISION DESCRIPTION 1 5/15/2015 LEVEL I STREAM RESTORATION MONITORING FOURTH YEAR MONITORING REPORT, CHANNEL STABILITY THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED N FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: COPY To FILE. NCDENR -DWQ ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN SIGNED GUY B. INGLE PO Box 3136- Greensboro, NC 27402-3136 = www greensboro -nc gov , 336 -373 -CITY (2489) = TTY # 333 -6930 Level 1 Stream Restoration Monitoring Horsepen Creek Main Tributary #2 and Tributary A FOURTH YEAR MONITORING REPORT Channel Stability New Garden Road Widening Phase II City of Greensboro, North Carolina Engineering Division Project No. P -3741 May 14, 2015 Prepared by US Infrastructure of Carolina, Inc 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N C License #C -1950 0 Carolina Wetland Services, Inc 550 East Westinghouse Blvd Charlotte, NC 28273 d1� cws Table of Contents Page Introduction. 1 Methods 1 Photo Reference Sites 1 Channel Stability . . , . 3 Results 3 Photo Reference Sites 3 Channel Stability ..4 Main Tributary #2 4 Tributary A 7 Summary „g Comments 8 Figures Figure 1 Site Location Map 2 Figure 2 As -Built Cross Sections and Photo Location Map ... 5 Appendix A 9 Photopage 1 - Fourth Year Monitoring Photographs Appendix B 27 Main Tributary #2 Cross Sections Main Tributary 42 Longitudinal Profile Main Tributary #2 Pebble Count Main Tributary #2 Raw Data Appendix C ........ 43 Tributary A Cross Sections Tributary A Longitudinal Profile Tributary A Pebble Count Tributary A Raw Data Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Introduction The New Garden Road Widening Phase II Project is located in Greensboro, North Carolina as shown on the Site Location Map (Figure 1) on the next page. Construction of this project necessitated the relocation of portions of two tributaries to Horsepen Creek, Main Tributary #2 (South) and Tributary A (North). The relocation of these stream reaches was completed in March 2011. The stream relocations were permitted through the U.S. Army Corps of Engineers (Action I.D. SAW 2007 - 03980) and the North Carolina Department of Environment and Natural Resources (DWQ Project #06 -0684) and required a Level 1 Stream Restoration Mitigation and Monitoring Plan for this project. This level of monitoring includes the establishment of photo reference sites, plant survival monitoring, and channel stability monitoring. The relocated stream reaches were assessed using Rosgen Level II Classification methods. The following end of fourth year survey was conducted to evaluate and document the conditions of the relocated stream channels following four years after the completion of construction. This data will be compared to the as -built survey which provided a baseline for these future monitoring events as well as the first, second, and third year surveys. Methods Photo Reference Sites Photographs were taken during: 1) Fourth Year Survey for Channel Stability on March 31, 2015 In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual comparison of stability. Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Legend 2,000 1,000 0 2,000 Feet Protect Outer Boundary REFERENCE USGS 7 6 TOPOGRAPHIC MAP SERIES, GREENSBORO NC QUADRANGLE, DATED 1994 Carolina Wetland Services, Inc. C�) ��� 550E Westinghouse Blvd Charlotte, NC 28273 Figure 1. Site Location Map New Garden Road Widening As -Built Report Greensboro, North Carolina IApplicant No: IDate: ISheet of Fourth Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Legend 2,000 1,000 0 2,000 Feet Project Outer Boundary REFERENCE: USGS 7.6 TOPOGRAPHIC MAP SERIES, GREENSBORO NC QUADRANGLE, DATED 1994 I� Carolina Wetland Services, Inc. IJ C 550 E. Westinghouse Blvd. �J WS Charlotte, NC 28273 Figure 1. Site Location Map New Garden Road Widening As -Built Report Greensboro, North Carolina IApplicant No: IDate: (Sheet of Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Channel Stability A geomorphic survey was performed by engineers from USI with the assistance of a scientist from CWS on March 31, 2015 following four years after the construction of the new stream channels. The survey included a longitudinal profile, a cross sectional survey, substrate sampling (Wolman reach -wide pebble count), and photo documentation of each of the stream reaches. This data was used to classify each reach using the Rosgen Level II system Bank pins were also checked on both reaches to monitor bank stability. Surveying methods (using a rod, level, and tape) followed the guidelines given in Stream Channel Reference Sates An Illustrated Guide to Field Technique, General Technical Report RM -245, United States Department of Agriculture, Forest Service. A relative benchmark for the Fourth Year survey was established on the top of an existing sanitary sewer manhole immediately adjacent to New Garden Road. The surveys of both streams were tied together to the top of the sanitary sewer manhole with a given elevation of 100.00. The actual elevation of the existing sanitary sewer manhole as a permanent benchmark is 775.70. This is shown in the Raw Data portions of the Appendices The Raw Data also shows the correction of the elevations taken during the survey to actual elevations Results Photo Reference Sites As part of the Fourth Year survey for the project, all areas of the project were photo documented In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual comparison of stability. Representative photographs are included in Photopage 1 (Appendix A) The locations and directions of each of these photographs are shown in Figure 2 (Page 5). As an aside, the same locations and directions were used for these photographs as those taken during the As- Built, First Year, Second Year, and Third Year surveys. 3 Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Channel Stability Main Tributary #2 Main Tributary #2 flows north through the project area and through the new culvert installed beneath the widened New Garden Road. The Fourth Year survey of Main Tributary #2 was conducted on March 31, 2015 by representatives from USI and CWS. The relocated stream channel exhibited substrate consisting of medium gravel (1350 = 11.3 mm) The channel slope is 0.004 ft/ft with a sinuosity of 1.18. The average bankfull width and depth for this reach are 27 feet and 1.60 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 43.04 ft2. The average flood -prone area width for Main Tributary #2 is approximately 58.10 feet The new stream channel has a Rosgen Level II classification of C5. Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Main Tributary #2 (Cross Sections A and B) are summarized below in the following tables. Channel cross sections, the longitudinal profile, and pebble count data for Main Tributary #2 are included in Appendix B Provide the following data for each crncs- cectinn C'rncs Cerfinn A Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured A A A A A Cross - sectional area as- built/present 60 01 sf 52 43 sf 50 09 sf 43 25 sf 43 04 sf Bankfull width as- built/present 27 00 ft 27 00 ft 27 00 ft 27 00 ft 27 00 ft Floodprone Width as -built /present 60 00 ft 60 00 ft 60 00 ft 55 00 ft 58 10 ft Width /depth as -built /present 12 15 1390 1455 1686 1694 Entrenchment ratio as-bui It/pre sent 222 222 222 204 2 15 Stream Type as -built /present* C5 C5 C5 C5 C5 nnty i equii ea /or ri //te c°r os s -sic ?torts 4 Fourth Year Monitoring Report: Channel Stability New Garden Road Widening Phase I1 Project No. P -3741 J zz Qz N O 4 �d v m UQ CQ �� a E crow y ° �U U �� y° N CA w .� W G7 Q 3 o �doaW Q Ix< / w a z �O w a °v �' 201H / O V � {oyyJ y Q 0 Q I U > \ O Ni m Q V) W 0 z ) U > T T / T a m / M 3W o V Q 1 I 00 i Z 0(- U 1 O Ir 3U1 I 0¢a ca v a°c m � °z o I > U 1 � 1 tlf U O N n y O W Ix C � O W W a ya M 1 >yy W W G ? W \\ O 04 cr 2 is o a \ \ > Z O O C \\ W ° cc Zp y W 2 Z \ W rc C Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Provide the follnwmQ data fnr ench crnc,z- cectmn C rncc CPefinn R Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured B B B B B Cross - sectional area as -built /present 73 91 sf 68 42 sf 64 21 sf 65 28 sf 62 10 sf Bankfull width as- built/present 27 00 ft 27 00 ft 27 00 ft 27 00 ft 27 00 ft Floodprone Width as- built/present 70 00 ft 70 00 ft 70 00 ft 70 00 ft 63 50 ft Width/depth as- built/present 986 1065 1135 11 17 11 74 Entrenchment ratio as- built/present 259 259 259 259 235 Stream Type as- built/present* C5 C5 C5 C5 C5 T onij• i eyun ea for riffle cross- sections The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Main Tributary 42 (Longitudinal Profile) are summarized below in the following table. The longitudinal profile for Main Tributary #2 is included in Appendix B. Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Avg slope riffles as -built /present 0 005 ft/ft 0 023 ft/ft 0 020 ft/ft 0 015 ft/ft 0 015 ft/ft Avg slope pools as-bui It/pre sent 0 ft/ft 0 ft/ft 0 ft/ft 0 ft/ft 0 ft/ft Number of riffles as -built /present 1 1 1 1 1 Number of pools as- built/present 4 4 4 3 4 The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Main Tributary #2 (Pebble Counts) are summarized below in the following table. The pebble count data for Main Tributary #2 is included in Appendix B Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured A and B A and B A and B A and B A and B D16 as- built/present 0 125 0 125 025 025 025 D50 as -built /present 05 80 5 7 80 11.3 D84 as- built/present 11 3 160 160 226 320 The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Main Tributary #2 (Visual Inspection) are summarized below in the following table. Date Inspected 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Structure Type Cross Vane Cross Vane Cross Vane Cross Vane Cross Vane Is water piping through or around structure9 No No No No No Head cut or down cut present? No No No No No Bank or scour erosion present9 No I No No No No Other problems noted9 No I No No No No 0 Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 Tributary A Tributary A is a minor tributary which flows west along the toe of the widened New Garden Road embankment to its confluence with Main Tributary 42. The Fourth Year survey of Tributary A was conducted on March 31, 2015 by representatives from USI and CWS The relocated stream channel exhibited substrate consisting of medium gravel (1350 = 11 ) 3 mm) The channel slope is 0 014 ft/ft with a sinuosity of 137 The average bankfull width and depth for this reach are 17 feet and 1.98 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 33 65 ft2. The average flood -prone area width for Tributary A is approximately 45 feet. The new stream channel has a Rosgen Level II classification of E4. Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Tributary A (Cross Sections C and D) are summarized below in the following tables. Channel cross sections, the longitudinal profile, and pebble count data for Tributary A are included in Appendix C. Provide the fallowing data fnr ench crnc z_QPrtlnn Crnee CPpfinn f Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured C C C C C Cross - sectional area as- built/present 32 45 sf 34 43 sf 26 85 sf 31 76 sf 33 65 sf Bankfull width as- built/present 17 00 ft 17 00 ft 17 00 ft 17 00 ft 17 00 ft Floodprone Width as- built/present 45 00 ft 45 00 ft 45 00 ft 45 00 ft 45 00 ft Width /depth as- built/present 891 839 10.76 9.10 8.59 Entrenchment ratio as- built/present 265 265 265 265 265 Stream Type as- built/present* E4 E4 E4 E4 E4 nncvrequirealrn frniec/oss- secnons Provide the following data for enrh rrncc_QPrfinn Crnee CPpfinn it Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured D D D D D Cross - sectional area as-built/present 39 59 sf 44 76 sf 22 68 sf 39 25 sf 40 71 sf Bankfull width as- built/present 19 00 ft 20 50 ft 20 50 ft 19 00 ft 19 00 ft Floodprone Width as- built/present 55 00 ft 55 00 ft 55 00 ft 55 00 ft 55 00 ft Width /depth as- built/present 9 12 939 18 53 920 887 Entrenchment ratio as -built /present 289 268 268 289 268 Stream Type as- built/present* I E4 E4 E4 E4 E4 urecy requireu /or/ y/ie cross- secnom 7 Fourth Year Monitoring Report Channel Stability New Garden Road Widening Phase II Project No P -3741 The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Tributary A (Longitudinal Profile) are summarized below in the following table The longitudinal profile for Tributary A is included in Appendix C. Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Avg slope riffles as- built/present 0 023 ft/ft 0 023 ft/ft 0 034 ft/ft 0 030 ft/ft 0 027 ft/ft Avg slope pools as- built/present 0 ft/ft 0 ft/ft 0 ft/ft 0 ft/ft 0 ft/ft Number of riffles as -built /present 3 3 3 3 3 Number of pools as- built/present 4 4 4 4 4 The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Tributary A (Pebble Counts) are summarized below in the following table. The pebble count data for Tributary A is included in Appendix C. Date Measured 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Cross - section being measured C and D C and D C and D C and D C and D D16 as- bui It/pre sent 0 125 <0 062 0 062 0 062 <0 062 D50 as- built/present 80 5 7 113 113 113 D84 as- built/present 226 320 320 640 450 The As- Built, First Year, Second Year, Third Year, and Fourth Year conditions of Tributary A (Visual Inspection) are summarized below in the following table. Date Inspected 6/28/2010 1/10/2012 3/19/2013 4/1/2014 3/31/2015 Structure Type Cross Vane Cross Vane Cross Vane Cross Vane Cross Vane Is water piping through or around structure No No No No No Head cut or down cut present? No No No No No Bank or scour erosion present? No No No No No Other problems noted? No No No No No Summary Comments The channels (Main Tributary #2 and Tributary A) relocated as part of the New Garden Road Widening Phase II Project appear to be geomorphically and hydraulically stable with regard to pattern, profile, and dimension Other than ongoing monitoring and observation there are no recommendations to perform any remediation at this time. 8 Fourth Year Monitoring Report Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No P -3741 Appendix A Photopage 1 — Fourth Year Monitoring Photographs Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 Photo 1: Tributary A — permanent cross section, left bank looking upstream Photo 2: Tributary A — permanent cross section, left bank looking upstream C Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 l Photo 3: Tributary A — permanent cross section, left bank looking upstream Photo 4: Tributary A — Root Wad Area A, centerline looking, upstream Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase 11 Proiect No. P -3741 Photo 5: Tributary A — Grade Control Sill A, centerline looking upstream Photo 6: Tributary A — Cross Vane A, left bank looking downstream 12 Fourth Year Monitoring Report: Photo Documentation— Photopage 1 New Garden Road Widening Phase II Project No. P -3741 .MIA, 7-1' Photo 7: Tributary A — Root Wad Area A, centerline looking upstream Photo 8: Tributary A — Root Wad Area B, left bank looking downstream 13 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Photo 9: Tributary A — Cross Vane A, left bank looking upstream ect No. P -3741 Photo 10: Tributary A — Cross Vane A, left bank looking upstream 14 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 ial k if licnin; r114-50 11 f roject . • fit IN NN_ : / aqr'. I ?� �` ►, � � cry • w .',�. �* 15 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 K Photo 13: Tributary A — Confluence with Main Tributary #2, looking downstream Photo 14: Tributary A — Cross Vane B, left bank looking upstream UR Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 1 J } Photo 15: Main Tributary #2 — permanent cross section, right bank looking upstream Photo 16: Main Tributary #2 — Root Wad Area D, right bank looking downstream 17 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase H Project No. P -3741 Photo 17: Main Tributary #2 — Root Wad Area D, centerline looking downstream Photo 18: Main Tributary #2 — permanent cross section, centerline looking upstream 18 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 i.�W vMi .Ij vau ry Cell q; ruabc 11 Photo 19: Main Tributary 42 — Cross Vane D, centerline looking downstream NO. Y -J /41 Photo 20: Main Tributary #2 — Cross Vane D, centerline looking downstream K Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 Photo 21: Main Tributary 92 — Cross Vane D, centerline looking downstream Photo 22: Main Tributary #2 — Root Wad Area D, centerline looking upstream 20 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 Photo 23: Main Tributary #2 — Cross Vane D, left bank looking upstream Photo 24: Main Tributary #2 — Cross Vane C, left bank looking downstream 21 Fourth Year Monitoring Report: Photo Documentation— Photopage 1 New Garden Road Widenin; Phase 11 Project No. P -3741 } Photo 25: Main Tributary 42 — Riffle Pool B, centerline looking upstream Photo 26: Main Tributary #2 — Cross Vane C, centerline looking downstream 22 Fourth Year Monitoring Report: Photo Documentation— Photopage 1 ivcw varucn moau wruenrng rnase it Project NO. Y -j /41 r 1� ,,' ♦ ' , r Photo 27: Main Tributary 42 r Cross Vane C, right bank looking downstream Photo 28: Main Tributary #2 — Confluence with Tributary A, looking downstream 23 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 29: Main Tributary #2 — Cross Vane C, right bank looking upstream Photo 30: Main Tributary #2 — Miscellaneous, left bank looking downstream 24 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 31: Main Tributary #2 — Root Wad D, left bank looking upstream showing both permanent cross sections Photo 32: Main Tributary #2 — Root Wad D, left bank looking downstream 25 Fourth Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 It / S to s Y Photo 33: Main Tributary #2 — New Garden Road culvert, looking upstream Photo 34: Main Tributary #2 — Downstream of New Garden Road, looking downstream 26 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 Appendix B Main Tributary #2 Cross Sections Fourth Year Monitoring Comparison — As- Built, First Year, Second Year, Third Year, and Fourth Year Main Tributary #2 Longitudinal Profile Fourth Year Monitoring Comparison — First Year, Second Year, Third Year, and Fourth Year Main Tributary #2 Pebble Count Main Tributary #2 Raw Data Fourth Year Monitoring 27 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 28 a O L_ ('0 I � 0 I I 3 LO fl In U') Y N 8 m >N N Li LL m ? v Q I I I C) I U C O I I I LO v/ N N I I I O L ♦ 1 V I � I I ++ M O M N �L I C •� I i In N I � (V I i O CV O C (D 7 i U') L I I I_ V I I O 3 I r z I ' I I I a O M I-- t` I` U') I- M I` T— 1-- O 0 I` (0 LO 0 I,,- ti ti ti ti ti P-- P%- (1001) UOIIBA813 28 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 Q LO ti O O E ~ LO o m i CL c CD m Li I LO U) i LO LO O LO U I I 1 N O ai *0 • - L I ' 0 LO ++ M •— I Cb O I M 1 i Ln N O O N = i LO I 3 I ' I O � z ' I I I �n m o CO CD C0 Cfl 0 ti ti ti ti ti ti ti ti (1081) uOijenal3 Q Fourth Year Monitoring Report: Main Tributary 42 New Garden Road Widening Phase II Project No. P -3741 30 /P1 CC N N m Q c) M LD y Ul) Q N N O Q U') U-) Cl) O L V cm L ^ M m m 3 O O H Lf) N = O N 0 LO O ea � C7 Z Q O O ti U-) M O P�-- U*) (1801) uOIJBA013 30 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 31 LO W O N N m /\ U') G C4 O CL `r m O Q N N O i+ ci �i 1 -) � y O _ LO 0 U LC) Nil O d c� m Mc H O M LO N m G O � N c as LO m U O d Z m O Cfl N O 00 CD Nil N CD Cfl C� ti�� ti ti ti ti ti (1001) UOIJena13 31 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 a� a� �a C � O r� N � � O �C C F e� Z 0 0 0 0 0 0 P- a c°Dr�o (1aa3) uoi ;Vnaia 32 0 N c�D • O'9LZ i rn O'09Z O'9ZZ O'OOZ 0'00 6 0'9L I N �0 L ! U) L 0'09 19 W4 O U. ca 0'9L 6 0'09 6 a 0 Y 0'9Z L U- 0'00 6 0'9L I N �0 L ! U) L 0'09 19 W4 O Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 O r� N � O Cep L � y O �r 0 0 0 0 0 0 (133j) uoi;Un3121 33 N ti O'SLZ O*OSZ O'SZZ 0 OOZ O'SL L 0,091 O'SZL w 0 r:+ CQ 0,00L Z O'SL 0 05 0'SZ Efflyll O rl- LO 0 N 3 v 0 N lQ L H M N Ht y- T N 0 N 0) N 3 m L H I M 0 N L6 Ix M 0 N LL CD J LO O N N U (0 3 00 �P p Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 Main Tributary #2 - Pebble Count 34 Metric mm Particle S A N D Count Tot # % Tot % Cum <0.062 Silt /Clay 12 95 12.6 12.63 0.062 - 0.125 Very Fine Sand 0 95 0.0 12.63 0.125 - 0.250 Fine Sand 2 95 2.1 14.74 0.25-0.5 Med. Sand 4 95 4.2 18.95 0.5-1.0 Coarse Sand 4 95 4.2 23.16 1.0-2.0 Very Coarse Sand 14 95 14.7 37.89 2-4 Very Fine Gravel G R A V E L 0 95 0.0 37.89 4-5.7 Fine Gavel 0 95 0.0 37.89 5.7-8 Fine Gavel 3 95 3.2 41.05 8-11.3 Medium 5 95 5.3 46.32 11.3-16 Medium 16 95 16.8 63.16 16-22.6 Coarse 13 95 13.7 76.84 22.6-32 Coarse 6 95 6.3 83.16 32-45 Very Coarse 5 95 5.3 88.42 45-64 Very Coarse 3 95 3.2 91.58 64-90 Small c 0 b b e 3 95 3.2 94.74 90-128 Small 0 95 0.0 94.74 128- 180 Large 2 95 2.1 96.84 180-256 Large 0 95 0.0 96.84 256-362 Small B U 1 a e 0 95 0.0 96.84 362-512 Small 1 95 1.1 97.89 512-1024 Medium 0 95 0.0 97.89 11024-2048 Large - Very Large 0 95 0.0 97.89 Bedrock I Bedrock 2 1 95 2.1 100.00 34 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 N D H O eC e� L C O U V C� O ee O ( %);uawad aeueintunj 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -• o. oo r �e �n � M N . o 0 0 c 0 0 0 kc, o v o v o fn 35 0 R �r, o 3aolpag BhOZ-bZOi KOT-ZiS ZTS-Z9£ Z9£ -9SZ 9SZ-08T 0ST-8ZI 8ZT-06 06 -ti9 b9-Sb Sb- Z£ Z£ -9'ZZ 9'ZZ-9T 91-£'iT L'S - b b -Z 0'Z -011 0'I -9'0 S'0-SZ'0 O5Z'0 -SZI10 SZi'0 - Z9010 Z90'0> E v Z a Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 N L O L it ..r G� ii O ..r L ..r A N V r.+ L a O U a� a� a C C� O �z h V M (%) caul q ;uaaiad 36 N C O 00001 II 001 Oi I'0 I0'0 as to u y i. a Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 u C � a 'O 3 0 S °t�z K o V 3 $ oz5� a �z yO .�pL pw �i U P ? Q E 6 9 C Y a C e� �w ,ie1� F9 4'39 °ems_ Cie y O r IV N (J N N [V fV N ° 3 0 c �I mm v m s a saaag���;��a og�asa��aaxsa�s ���sssssssssssssssss 2 � � m ey 3 37 g s n� �m �t e� �3 LO O a � $ 3 L I C j Ln O Q I I Q Lf) c O Ln y N N Q i Cl � V � I I M I I I I Y I r I :iii R N � Lie I I N O ' c m LO I m C7 o 3 I r m z I I i Ln Q I ' O (1601) UOIIBA813 Fourth Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 w wwww��i, ww w� n .-. .+ � � N nj � .••+ � � N G .-. V zW C G L e e • IL 101 I ml e "d L v,a m r �m3� W moua° m a u 'e 8 O aN0 O� aAO, N r V C N lei Y Y M M N � m �m u n cb �_ Z e c� °� �j zz ys !O c 38 0 c q g� `s n f%i °o a � a W a n 8a LO O O O r LO y m i CO v = 8 W O ;O^ CO 1 I C0 LO N I LO 0 I U LO I LO I I C) w r I � � ' c LO o M +a = i co O I ' LO N O N Q N Q� I LO I t� 3 I I Cl r I Z I LO m O N O m C4 Nt N O I� I— O O O CO (0 I- rl- I— rl- r- (1001) uoilena13 Fourth Year Monitoring Report Main Tributary 92 New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Water Surface - Main Tributary #2 Project Name: New Garden Road Widening Phase II Protect Location Greensboro, NC Date: 3/31/2015 WS Slope (ft /ft ) 0 004 39 BM #1 (ft )= 775 70 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION BS ILL FS Depth Elevation CorrectedDevahon COMMENTS BM 91 282 10282 10000 00 10282 11 18 0 24 91 88 76758 20 10282 11 12 016 9186 76756 50 10282 11 37 035 91 80 76750 110 10282 11 46 045 91 81 76751 370 10282 11 95 064 91 51 76721 590 10282 11 72 030 9140 767 10 820 10282 1240 064 91 06 76676 990 10282 1324 146 9104 76674 1090 10282 1356 1 80 9106 76676 1270 10282 1281 1 04 91 05 76675 1480 10282 1201 018 9099 76669 1510 10282 1336 1 42 9088 76658 1620 10282 1371 1 73 9084 76654 1760 10282 1290 092 9084 76654 2020 10282 1289 090 9083 76653 2240 10282 1230 030 9082 76652 2250 10282 1367 160 9075 76645 2260 10282 1389 186 9079 76649 2400 10282 1458 251 9075 76645 2640 10282 1332 126 9076 76646 2870 10282 1234 025 9073 76643 WS Slope (ft /ft ) 0 004 39 Fourth Year Monitoring Report Main Tributary #2 New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Thalweg - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/31/2015 Thalweg Slope (ft /ft) 0 004 Riffle Slope 0 015 ail, BM # 1 (ft)-- 775 70 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION BS HL FS Elevation Corrected Elevation CONWENTS BM #1 282 10282 10000 00 10282 11 18 9164 76734 20 10282 11 12 9170 76740 50 10282 1137 9145 76715 TOR 110 10282 1146 91 36 76706 370 10282 1195 9087 76657 590 10282 1172 91 10 76680 HOR 820 10282 1240 9042 76612 TOR 990 10282 1324 8958 76528 PMD 1090 10282 1356 8926 76496 1270 10282 1281 9001 76571 PMD 1480 10282 1201 9081 76651 CV 1510 10282 1336 8946 76516 PMD 1620 10282 1371 8911 76481 1760 10282 1290 8992 76562 2020 10282 1289 8993 76563 CV 2240 10282 1230 9052 76622 2250 10282 1367 8915 76485 PMD 2260 10282 1389 8893 76463 PMD 2400 10282 1458 8824 76394 2640 10282 1332 8950 76520 HOR 2870 10282 1234 9048 76618 Thalweg Slope (ft /ft) 0 004 Riffle Slope 0 015 ail, Fourth Year Monitoring Report Main Tributary #2 New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Left Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 BM 41 (ft )— 775 70 Height of Height Distance, Pomt Back -Sight Instrument Fore -Sight Depth STATION BS ILL FS Elevation Corrected Elevation CONINIFAIS BM #1 212 10212 10000 50 10212 833 9379 76949 370 10212 847 9365 76935 590 10212 832 9380 76950 820 10212 845 9367 76937 1090 10212 852 9360 76930 1270 10212 834 9378 76948 1480 10212 8 15 9397 76967 1760 10212 829 9383 76953 2020 10212 846 9366 76936 2240 10212 793 9419 76989 2400 10212 781 9431 77001 2640 10212 798 9414 76984 2870 10212 801 9411 76981 41 Fourth Year Monitoring Report Main Tributary #2 New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Right Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase II Pr4lect Location: Greensboro, NC Date: 3/19/2013 BM #1 (ft )= 775 70 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION BS ELL FS Elevation Corrected Elevation COMMENTS BM #1 212 10212 10000 50 10212 788 9424 76994 370 10212 761 9451 77021 590 10212 804 9408 76978 820 10212 807 9405 76975 1090 10212 865 9347 76917 1270 10212 819 9393 76963 1480 10212 822 9390 76960 1760 10212 851 9361 76931 2020 10212 852 9360 76930 2240 10212 831 9381 76951 2400 10212 827 9385 76955 2640 10212 874 9338 76908 2870 10212 855 9357 76927 42 Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 Appendix C Tributary A Cross Sections Fourth Year Monitoring Comparison — As- Built, First Year, Second Year, Third Year, and Fourth Year Tributary A Longitudinal Profile Fourth Year Monitoring Comparison — First Year, Second Year, Third Year, and Fourth Year Tributary A Pebble Count Tributary A Raw Data Fourth Year Monitoring 43 Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 44 LO I� I I £ � �-• I CD c a I ' U I = i M O V I I � Cn I I I O M N N O N a0i �► I I y c O N cn 'L I I M m LO O = � I I L Ri I I O r I 3 a� z I I I LO I I I� O LO M M (D I` QO U-) (.0 ti ti ti (}aal) uOiJena13 44 Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 E, I LO I I w I - ) � a N c _ O LO ti m �I C a C) o it c„i I U') M N N O i O V Q i } ' LO CO) O N � I I LO p I � d I i p i c i r I 3 d LO z ° o LO M ti ti ti 0) � ti U') � � (1001) UOIIBA013 E, Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 V Y w/ 0 cu N N m Q V C ++ v M m M Lo ai N Q N N O � V M O L V LO ' N Q N 4- L H LO O V- U) m O O LM m (D 3 O Z LO M O ti In (1001) UOIIBA013 V V 46 Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 O L Y a N qT N N O m 0 L LO m M cf) O ¢ N N N 0 O M V ¢ O L N JE � a N ;0 c� LO Cl) O � OC O L V 3 O Z LO M � � ti ti � � (1081) u01}en013 47 Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 L a .0 .. C b� O � O D eat H � 0 0 0 0 0 0 0 0 0 OD CO Ir N O OD CO tf N (J33J) UOIJUA3[a 48 0'08 L 0'OL L O'09L � m s 0'0£ L O'OZL m o: O'OLL I O'OOL w 0'06 c v� m 0'08 J 0'OL 0'09 0'09 O'Ob d 0'0£ 0'0Z 0'0 L In Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II r•* Ow Q Q F� V bD C �p F � Project No. P -3741 (;aa;) aol;enal:l 49 CO '0^ W W r- U-) 0'096 CN rn m 3 O'OL 6 SIRI! v T O 0'OS 6 3 m 0'046 0'0£6 M r O N 0 OZ6 y 3 N L 0066 I ~ 0'00 6 04 0 N 0'06 w 3 O L 009 1 O'OL c U- Cal ' 0'09 - 0,09 T 0 N O'OtF m J 0 0£ O OZ r 0 %J t0 006 7 N L 2� J 0'0 0 'O W LL r- Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 Tributary A - Pebble Count 50 Metric (mm) Particle S A N D Count Tot # % Tot % Cum <0 062 Silt /Clay 2 110 18 182 0062-0125 Very Fuse Sand 26 110 236 2545 0125-0250 Fine Sand 9 110 82 3364 025-05 Med Sand 3 1 110 27 3636 05-10 Coarse Sand 6 110 5 5 41 82 10-20 Very Coarse Sand 3 1 110 27 4455 2-4 Very Fine Gravel G R A V E L 0 110 00 4455 4-57 Fine Gravel 0 110 00 4455 5 7- 8 Fine Gravel 4 110 36 4818 8-113 Medium 0 110 00 4818 11 3 -16 Medium 11 110 100 5818 16-226 Coarse 5 110 45 6273 226-32 Coarse 11 110 100 7273 32-45 Very Coarse 13 110 118 8455 45-64 Very Coarse 8 1 110 91 82 64-90 Small C O b b e 5 110 .73 45 9636 90-128 Small 1 110 09 9727 128-180 Large 1 110 09 9818 180-256 1 Large 0 110 00 9818 256-362 Small B 0 I d e 0 110 00 9818 362-512 Small 0 110 00 9818 512-1024 Medium 1 110 09 9909 11024-2048 Large - Very Large 0 110 00 9909 Bedrock Bedrock I 1 110 09 10000 50 Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 C� D H i C!S C it D O U a C C� 0 ( %) juaa.zad 3AIWjniunD 0 c o 0 0 0 0 0 0 0 o O o O o 0 0 R kn o vi o kn o M M N -- ( %) �uaa.Iad 51 O o v, o xaolpag SbOZ - bZOI hZOI-ZIS ZIS - Z9£ Z9£-9SZ 9SZ-08I 08I-8ZI 8ZI-06 06-V9 b9-Sh Sb- Z£ Z£-9'ZZ 9'ZZ-9I 9I-£'II £'II -8 8 -L'S L'S -t, 17 -Z 0'Z - 0' 1 D'I -S'0 9'0 -SZ'0 DSVO -SZro SZi'0 - Z90'0 Z90'0> w L CC Q, Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 r D O iw Q N V ^CCS A rO V P1 b V G� ii P O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O .r ( %) .Iamj juaa iad 52 00001 0001 001 01 1'0 10'0 v L C� Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 ri v,wwu.r�A wr=; u.� V tOn to C N O ... IL C a w �C ea 0 wyw+v'cv�� Oit W � u e i7 Y ww° o3ge e m 3�a�mm3�osc�ia �sa���axss O p N N N ail � N G r N lV fV t�l t+l t+i tV G n nn Ian `o �oo � 9 P93 � 3 53 8 0$$$ eV C r r C< V LO 9 qq7� m m s V 3 F3 t I +�8 � R U II � ' W e3 �e`�888S8S8888S888gS YY LL 0] S z � I L _ O I I i N z Y N v m M W� I ' b 9zE� '0 wV W CO I M N 53 LO I I t I � � 1 YY LL 0] U I I L _ O I I M W� I ' wV W CO I M N N O I U I Q � C , N w I I I O � �L` I +� O N � r � I I I LO o I d 'a O C) I 3 I I I Z I I I LO 1 I I I O A A A A 1 (1001) UOIIBA013 Fourth Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 D� °3 S `az 0 v c zz� °e Z"3 96 d O. N s O O N n- M 8 M N V h G Y C L WW G O a cco� °� u c° a N r 8 !? m e 8 O N 6 N O 85iRAR2R8R b y _ n �i " V m n R I; 11 z r 4 g g n g .'0- n n n ss a O N h O n O N O O i m 54 A O � v � � 3 v a d ti e� �3 QI I LO In , I I L � = O I 4/ C CL IV Q I I I LO V/ I O I 1 I I♦ I �/� V/ I O I Y JJ L U I I O Q M V 1 N H i � I O � I I N 'a ca I I O r ; I L ev i ' r C7 I 3 LO Z O L-0 M O Qc) r- LO (1081) uoilenal3 Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Water Surface - Tributary A Project Name: New Garden Road Widenng Phase II Project Location Greensboro, NC Date: 3/31/2015 WS Slope (ft /ft ) 0016 Riffle Slope 0 019 55 BM # 1 (ft )-- 775 70 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION B.S. ILL F.S. Depth Elevation Corrected Elevation BM #1 476 10476 10000 00 10476 1192 019 9303 76873 100 10476 1187 010 9299 76869 130 10476 1261 015 9230 76800 270 10476 1273 018 9221 76791 440 10476 1321 020 9175 76745 580 10476 1369 059 9166 76736 620 10476 1361 051 9166 76736 770 10476 1339 030 9167 76737 820 10476 1322 012 9166 76736 830 10476 1465 097 9108 76678 930 10476 1531 158 9103 76673 1060 10476 1499 128 9105 76675 1160 10476 1460 088 9104 76674 1190 10476 1481 108 9103 76673 1350 10476 1465 094 9105 76675 1470 10476 1383 010 9103 76673 1480 10476 1591 175 9060 76630 1540 10476 1574 158 9060 76630 1700 10476 1458 042 9060 76630 1850 10476 1535 1 18 9059 76629 WS Slope (ft /ft ) 0016 Riffle Slope 0 019 55 Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Thalweg - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/31/2015 Thalweg Slope (ft /ft ) 0 014 56 BM # 1 (ft )= 77570 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION B S RL FS Elevation Corrected Elevation CON NUMIS BM 41 476 10476 10000 00 10476 1192 9284 76854 HOR 100 10476 1187 9289 76859 TOR 130 10476 1261 9215 76785 PMD 270 10476 1273 9203 76773 HOR 440 10476 1321 9155 76725 TOR 580 10476 1369 9107 76677 PMD 620 10476 1361 91 15 76685 HOR 770 10476 1339 9137 76707 820 10476 1322 9154 76724 CV 830 10476 1465 9011 76581 PMD 930 10476 1531 8945 76515 PMD 1060 10476 1499 8977 76547 PMD 1160 10476 1460 9016 76586 PMD 1190 10476 1481 8995 76565 1350 10476 1465 9011 76581 1470 10476 1383 9093 76663 CV 1480 10476 1591 8885 76455 PMD 1540 10476 1574 8902 76472 PMD 1700 10476 1458 9019 76588 HOR 1850 10476 1535 8941 76511 TOR Thalweg Slope (ft /ft ) 0 014 56 Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Left Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 UVA BM #I (ft)-- 775 70 Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION BS ILL FS Elevation Corrected Elevation CONIMEVTS BM #1 256 10256 10000 00 10256 700 9556 77126 100 10256 751 9505 77075 270 10256 738 9518 77088 440 10256 765 9491 77061 620 10256 806 9450 77020 770 10256 845 9411 76981 820 10256 845 9411 76981 1190 10256 945 9311 76881 1350 10256 882 9374 76944 1470 10256 875 9381 76951 1700 10256 886 9370 76940 UVA Fourth Year Monitoring Report Tributary A New Garden Road Widening Phase II Project No P -3741 LONGITUDINAL PROFILE: Right Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location Greensboro, NC Date: 3/19/2013 58 BM # 1 (ft) 775 70 Height of Height Distance, Pomt Back -Sight Instrument Fore -Sight Depth STATION BS ELL FS Elevation CorrectedBewtlon COMMENTS BM #1 256 10256 10000 00 10256 719 9537 77107 100 10256 697 9559 77129 270 10256 740 9516 77086 440 10256 733 9523 77093 620 10256 830 9426 76996 770 10256 807 9449 77019 820 10256 814 9442 77012 1190 10256 884 9372 76942 1350 10256 893 9363 76933 1470 10256 866 9390 76960 1700 10256 908 9348 76918 58