HomeMy WebLinkAboutNC0079049_Compliance Evaluation Inspection_20150429 I '
wawa
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
Governor Secretary
April 29, 2015
RH Johnson Construction Company RECEIVEDIDENRIDWR
Attn: Christopher Johnson, Owner
207 Sleepy Gap Road,
Arden, NC 28704 MAY 5 2015
Subject: Compliance Evaluation Inspection PeWrtnttting r Quality
Permittee: RH Johnson Construction Company
Facility: RH Johnson Construction Wastewater Treatment Plant
NPDES Permit#: NC0079049
Forsyth County
Dear Mr. Johnson:
Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Resources (DWR or
the Division) conducted a compliance evaluation inspection (CEI) of the RH Johnson Construction
Wastewater Treatment Plant (WWTP) on April 29, 2015. Because neither the plant nor the facilities it will
serve have been constructed yet, this inspection consisted of a telephone conversation with you to gather
the latest information on when the facilities will be constructed, as well as a simple file review.
During this telephone conversation, you verified that neither the plant nor the homes that will
discharge to it have been built and there is currently no indication of when they will be built. You also stated
that you are not planning to develop the property and build the plant yourself; you have the property on the
market and are simply maintaining the permit in active status for whoever does eventually purchase and
develop the property.
You are reminded that prior to building the plant you must acquire an Authorization to Construct
(AtC) permit from the Division. Also, you must designate an Operator in Responsible Charge (ORC) and
Backup ORC in accordance with NC Administrative Code 15A NCAC 08G, before any waste can be
introduced into the new plant. Finally, you must also notify this office at least 72 hours in advance of any
discharge from a new wastewater treatment plant to surface waters of the State, so that we can perform an
onsite inspection if required.
North Carolina Division of Water Quality,Winston-Salem Regional Office
Location:450 West Hanes Mill Road,Suite#300,Winston-Salem,North Carolina 27105
Phone:336-776-9800 FAX:336-776-97971 Customer Service;1-877-623-6748
Internet:www.ncwaterquality.org
An Equal Opportunity 1 Affirmative Action Employer
If you have any questions regarding the permit or this letter, please call Mr. Boone or me at (336) 776-
9800.
Sincerely,
W. Corey Basinger
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
•
Attachments:
1. BIMS Inspection Report
CC: WSRO-SWP
Central Files
NPDES Unit
•
1
United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 ti 2 I s I 3 I NC0079049 111 12 I 15/04/29 117 18 ,. 19 Ls] 20 I I
21L1 1 1 1 1 1 1 1 111 1 , 11 1 1 1 l l l l l l 1 l l l l l I I I I I l I I I l I I66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -- Reserved
671 I 70 LJ I I 71 ' f 72 I 73 I I 174
751 I I I I I I 180
Section B:Facility Data
L J
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 12:00PM 15/04/29 12/06/01
R.H.Johnson Construction WWTP
Exit Time/Date Permit Expiration Date
7010 Simmons Rd
01:OOPM 15/04/29 17/02/28
Rural Hall NC 27045
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Christopher H Johnson,207 Sleepy Gap Rd Arden NC
No
28704//828-651-8919/8286518919
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
Other
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
•
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone WSRO WQ//336-776-9690/ a VI /,5
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
...peetc-te,7,6-0041,1„- 1 07,46,
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type 1
31 NC0079049 111 121 15/04/29 1 17 18 Lai
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Please refer to the attached inspection summary letter.
Page# 2
,
i
Permit NC0079049 Owner-Facility: R.H.Johnson Construction WWTP
Inspection Date: 04/29/2015 Inspection Type: Compliance Evaluation
Other Yes No NA NE
Comment: Neither the plant nor the facilities it will serve have been built yet. Permit beim)kept active by
owner for when they do eventually decide to develop the property and build the plant.
Page* 3