Loading...
HomeMy WebLinkAboutNCC211673_NOT Closeout documentation_20230502Charlolte-Mecklenburg STORM WATER Services ��� Project Name: CHEVAL PH 5 Location: LAWYERS - Mint Hill Owner: 2145 Suttle Avenue EC Inspection Report Charlotte, NC 2 8 2 0 8 EC - Final Inspection #: 75,564 - Date/Time: 4/28/23 12:00 - 4/28/23 13:00 - Inspector: Chanell Hatch Weather conditions: Sunny Soil conditions: Workable Contact made: N/A Erosion and sediment control measures removed: N/A Site permanently stabilized: YES BMP's installed per approved plans: N/A Summary: Final for Cheval Subdivision- Lot 16 EC (#403331). No pre -construction meeting or grading activity has occurred in over 3 years. A new plan will need to be approved with a new COC in the future. dx CHARLOTTE To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 0 4/28/2023 1:21:08PM Page 1 of 1