Loading...
HomeMy WebLinkAbout20230487 Ver 1_USACE Correspondence_20230502Chandler, Rebecca D From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Tuesday, May 2, 2023 2:45 PM To: Michael Barfield; kdboyan@colpipe.com Cc: Wyatt, John M.; Shanna Cahill; Rick Whiteside; TJimenez@colpipe.com; Reedy, David; Homer, Seren M; Chandler, Rebecca D Subject: [External] Request for Additional Information: SAW-2023-00711; Colonial Pipeline Company - Greensboro Junction Butane Off-load, Guilford County Categories: Working 401 Projects CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. All, Thank you for your PCN, dated 4/3/2023, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 12 (https://saw- reg.usace.army.mil/NWP2021/NWP12.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) Upon review of your submitted information it is not clear that the project design demonstrates avoidance and minimization to the maximum extent practicable as required by NWP General Conditions 23(a) and (b). For example, it appears that the butane truck terminal portion of the project could be designed in upland areas between Wetland W4 and Stream 11, thereby avoiding impacts to Wetland W4. Please re -design the project accordingly, or provide documentation that such avoidance and minimization measures are not practicable (i.e. available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes); 2) The plans provided, though detailed, do not clearly show the extent of wetland impacts proposed for this project. Please provide a plan view clearly showing the proposed wetland impact footprints and differing wetland impact types (permanent fill, permanent conversion, and temporary) using differing shading, hatching, or other methods. 3) The proposed project appears to impact the entirety of Wetland W4, including the small portion of this wetland area along Chimney Rock Road via a sanitary sewer line, re-routing of hydrology, or both. Unless otherwise justified, the Corps would consider this additional 0.003 acre of wetlands as a permanent impact subject to compensatory mitigation requirements. 4) Section 4.18 of your PCN narrative submittal references a "survey of the project area" for Schweinitz's sunflower. Please provide additional information regarding this survey, including when it was conducted and the general qualifications of staff conducting the survey in regards to this species. 5) Please note that all of the wetland areas proposed for impact would be considered Headwater Forest wetlands according to the NC Wetland Assessment Method (NCWAM), which therefore corresponds to a riparian non- riverine wetland type for compensatory mitigation purposes. Note also that, unless otherwise justified, compensatory mitigation is required at a 2:1 credit to impact ratio for permanent wetland fill impacts and a 1:1 credit to impact ratio for permanent conversion wetland impacts. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatorV.ops.usace.armV.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Michael Barfield <mbarfield@corblu.com> Sent: Monday, April 3, 2023 4:43 PM To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Cc: Wyatt, John M. <jmwyatt@colpipe.com>; Shanna Cahill <scahill@corblu.com>; Rick Whiteside <rwhiteside@corblu.com>; kdboyan@colpipe.com; TJimenez@colpipe.com; Reedy, David <dreedy@colpipe.com> Subject: [Non-DoD Source] SAW-2023-00711 Colonial Pipeline Company Greensboro Junction Butane Pre -Construction Notification David, Attached is Part 2 of the PCN submittal. Thank you, Michael A. Barfield, CWB, CE Project Ecologist Corblu Ecology Group, LLC 3225 S. Cherokee Lane, Bldg. 800 Woodstock, GA 30188 0: 770-591-9990 Ext. 23 F: 770-591-9993 M: 678-215-2742 n corblu ECOLOGY GROUP Confidentiality Notice: The information contained in this transmission is confidential, proprietary and privileged and may be subject to protection under various state and Federal laws and regulations regarding non-public personal health and financial information. This information is for the use of the individual or entity to whom it is addressed for the sole purpose of performing the intended function. All recipients are hereby notified that any improper use, distribution or copying of this information is strictly prohibited and may subject you to criminal and/or civil penalties. If you are not the intended recipient(s), please contact the sender by replying to this e-mail and destroy/delete all copies of this e-mail message. From: Michael Barfield Sent: Monday, April 3, 2023 4:42 PM To: David.E.Bailey2@usace.army.mil Cc: Wyatt, John M. <Imwyatt@colpipe.com>; Shanna Cahill <scahill@corblu.com>; Rick Whiteside <rwhiteside@corblu.com>; kdboyan@colpipe.com; TJimenez@colpipe.com; Reedy, David <dreedy@colpipe.com> Subject: SAW-2023-00711 Colonial Pipeline Company Greensboro Junction Butane Pre -Construction Notification David, Please find attached Part 1 of SAW-2023-00711 (Colonial Pipeline Company Greensboro Junction Butane Truck Offload). The file was too large to email as a single PDF. Part 2 will come in a second email. If you have any questions about this submittal please contact Shanna Cahill at scahill@corblu.com or me. Thank you, Michael A. Barfield, CWB, CE Project Ecologist Corblu Ecology Group, LLC 3225 S. Cherokee Lane, Bldg. 800 Woodstock, GA 30188 0: 770-591-9990 Ext. 23 F: 770-591-9993 M: 678-215-2742 4 corblu ECOLOGY GROUP Confidentiality Notice: The information contained in this transmission is confidential, proprietary and privileged and may be subject to protection under various state and Federal laws and regulations regarding non-public personal health and financial information. This information is for the use of the individual or entity to whom it is addressed for the sole purpose of performing the intended function. All recipients are hereby notified that any improper use, distribution or copying of this information is strictly prohibited and may subject you to criminal and/or civil penalties. If you are not the intended recipient(s), please contact the sender by replying to this e-mail and destroy/delete all copies of this e-mail message.