Loading...
HomeMy WebLinkAbout20150491 Ver 1_Site Plan_20150521� � Jr GENERAL NOTES STRUCTURES INCLUDING STORM DRAIN PIPE, STORM STRUC�_RES, SEWER PIPE, AND RETAINING WALLS SHALL HAVE A TOLERANCE OF ±O]O FEET. STRUCTURES INCLUDING RISERS, WE|RS, AND ORIFICES, SHALL HAVE A TOLERANCE OF ±0.05 FEE[ STREAM IMPROVEMENT STRUCTURES SHALL HAVE A VERUCA_ TOLERANCE OF ±0]0 FEET. AND A PLAN|METR|C TOLERANCE OF ±0.50 FEET. SIDE SLOPES: THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL UENC�S IN ACCORDANCE YYUH THE APPROPRIATE CITY AND STATE EROSION AND SEDIMENT CDN�RDL ORDINANCES, THE CONTRACTOR SHALL PREVENT STANDING WATER DUE TO CDNWSTRUCTlON. DISTURBED AREAS SHALL BE SEEDED AND MULCHED AT THE DIRECTION OF THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE EROSION CONTROL MEASURES INCLUDED |N THIS PLAN SET, THE CONTRACTOR SHALL CONSTRUCT 6-INCH THICK CONCRETE ACCESSIBLE RAMPS AT INTERSECTIONS IN ACCORDANCE WITH THE LATEST REVISIONS FOR ACCESSIBLE RAMP DETAILS, CONSTRUCTION PLANS &c NCOOT STANDARD DRAWINGS. THE CONTRACTOR SHALL SAWCUT EXISTING ASPHALT AND/C_ CONCRETE SURFACES PRIOR T0 REMOVAL UNLESS OTHERWISE DIRECTED BY THE ENG|NEEp�. 5AVV CUT WIDTH SHALL BE 1 FOOT MINIMUM FROM THE EXISTING EDGE OF PAVEMENT. I�AVV CUT PAVEMENT SHALL BE REPLACED AS WELL AS ADDITIONAL PAVEMENT REQUIRED T0 TIE-IN TO FACE OF PROPOSED CURB AND GUTTER. Oil COOT HAS DETERMINED THAT NO PAVEMENT DEGRADATION E IS TO BE ASSESSED, COOT AND E&PM HAVE AGREED ON THE STREET CUTS FOR �H|CH A PAVEMENT DEGRADATION FEE IS REQUIRED, THE DEGRADATION FEE ASSESSMENT SH�LL BE PAID NA INTERNAL CITY MECHANISMS (DTI) PRIOR TO CONSTRUCTION. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MD��T CURRENT EDITION OF THE "WORK AREA TRAFFIC CONTROL HANDBOOK" (WATCH). EXISTING CONDITIONS TAKEN FROM GROUND SURVEY B, R.B. PHARR AND ASSOCIATES DATED 1/28/2015, ABANO.,--- .'..-'ABANDONED -NOT TO SCALE PROPOSED HEAD DIFFERENCE ASPH'. CURB ELEVATION$- '-.APPRDX|MATELY B/C,......... - �I ... OF CURB BIT___ .... ...... THE CONTRACTOR SHALL SET AND ADJUST PROPOSED CURB ELFVA_�DNS AS NECESSARY TO BM. _ '-_'_ .' .''..-'BENCH MARK ENSURE PROPER LONGITUDINAL GRADE FOR DRAINAGE. THE CONTR`CTOR SHALL RETAIN OF |NT CB�- �'...... EXISTING PAVEMENT' UNLESS OTHERWISE NOTED. C8cG .... ...... .--,-'CURB AND GUTTER CL_ .-'CLEARANCE C/L -'.--.-CHA|N DRIVEWAYS AND SIDEWALKS.- CMP_- .... ........... -...CURRUCATED MTL PIPE CDNC_- ... - .... -CONCRETE CONST'-.-- ... PROPOSED DRIVEWAY ENTRANCE DIMENSIONS ARE FROM EXPANSION JOINT TO EXPANSION DB_--.-. '.''-_'-DEED BOOK JOINT. MATCH REPLACEMENT MATERIALS TO THE EXIST SURFACE ACCORDINGLY: CB Di-. '... 0 CONCRETE - SIX INCH PORTLAND CEMENT CONCRETE /3000 PS� O(A-_- .... -''','D|AMETER 0 ASPHALT - (COMMERCIAL) TWO INCH SF9.5B COURSE AND FOU�: INCH Ug.OB ...... R|GHT OF WAY 0M, INTERMEDIATE COURSE. E'- -- ' ' ' '' .EAST/EAST|NC (RES|DENTAL) TWO INCH SF9.5B COURSE AND FOUF |NCH AGGREGATE -.'EACH ELEV ..' .. ' ' -'ELEVAUON EOP.... _ __ ' ' ........EDGE OF PAVEMENT BASE (ABC) COURSE. - 'EA3Ek4ENT EXI ST_ ' ' - ' o GRAVEL - SIX INCH INCIDENTAL STONE F/C� ........... OF CURB SIDEWALK SHALL BE FOUR INCHES THICK, AND SIX INCHES THICK A- DRIVEWAY CROSS|NGS, ENO SECTION FH' PER CITY STD. NO. 10=� FDC__ ....... -.--F|BER OPTIC CABLE C\( ' .--GAS VALVE HOR|Z'--- '-.'HOR|ZDNTAL DRAINAGE STRUCTURES: |NT__'__.......... -JNTER5[CUDN |N\(_ INVERT |P ...''..,IRON GRADES' ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE, DIRECTED BY THE L. ' -'..-'. lENGTH ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. STAUONS, .. ..,LINEAR FOOTAGE LT'.. .....,.,...LEFT OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION |b..' POUNO BOXES, AND THE MIDPOINT OF THE LIP FOR CATCH BASINS. ALL P(--ES SHALL BE RCP CLASS -'L|GHT POLE MAX_ ..... _ . -.. U[ UNLESS OTHERWISE NOTED. M|N'-_'_....... ....... .'. MINIMUM WEEPHDLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, A MINIMUM OF 1 ...... MONOLITHIC rnph WEEPHOLE PER STRUCTURE. WEEPUDLFS ARE TO BE CDNSTRUCT[0 IN THE BOTTOM 113 OF WTL_--_ ' ..,..,,..METAL STRUCTURE AND COVERED ON THE OUTSIDE OF THE STRUCTURE Bf A BAG MADE OF FILTER FABRIC AND FILLED W/#78 STONE. THERE WILL BE NO SEPARATE :�AYNENT FOR THIS WORK � E UTILITIES ARE ILLUSTRATED FOR INFORMATION PURPOSES ONLY, CITY WILL NOT BE HELD R-ESPONSIBLE FOR THE ACCURACY OF UTILITY LOCATIONS, SIZES, DEPTHS, OR FOR � .08- COMPLETENESS OF UTILITY INFORMATION.. PRIOR T0 CONSTRUCT|DN, THE CONTRA�TOR SHALL NOTIFY AND MEET WITH ALL UTILITY � �o OWNERS, THE CITY UTILITY COORDINATOR AND CITY INSPECTOR VVH�5E FACILITIES WILL BE AFFECTED TO DETERMINE UTILITY LOCATIONS, THE CONTRACTOR S-ALL PROTECT ALL UTILITIES FROM DAMAGE CAUSED BY HIS OPERATIONS OR THOSE OF HIS AGENTS. THE CONTRACTOR SHALL HOLD THE CITY HARMLESS FOR ANY THIRD-PARTY |NCONVE',iENCE CREATED BY WORK c� DF HIS OWN FORCES OR THAT OF HIS AGENTS ANY DAMAGES |NCL��RED SHALL BE THE U.) CONTRACTORS FINANCIAL RESPONSIBILITY. AS NEEOED, THE CONTRACTOR SHALL ADJUST/RELOCATE THE 3ANCARY SEWER AND WATER »o LINES ONLY. ALL OTHER ADJUSTMENTS/RELOCATIONS WILL BE PEFFORMED BY THE VARIOUS 0 0 UTILITY OWNERS. HE CONTRACTOR SHALL COORDINATE WORK WIT- UTILITY OWNERS SO As � ru NOT TO ADVERSELY AFFECT THE PROJECT SCHEDULE. THE CITY V� -L NOT BE HELD u� RESPONSIBLE FOR ANY DELAYS OR DISRUPTIONS TO THE WORK SC-EDULF OF OTHER UTILITY � � OWNERS . < 0 FOR UTILITY LOCATES CALL NORTH CAROLINA ONE-CALL 4 1-;_�00-632-4849� �41 0 0 FOR LOCATES OF UTILITIES NOT MEMBERS OF NORTH CARDL|N/- ONE-CALL CONTACT � PROJECT MANAGER 8c UTILITY COORDINATOR. � o � THE CONTRACTOR SHALL ADJUST ALL WATER VALVES' WATER METEz; BOXES AND WATER VAULTS TO FINISHED GRADE, WATER METERS LOCATED IN S|DEVVAL-3 OR CONCRETE DRIVEWAYS m SHALL BE INSTALLED WITHIN CONCRETE BOXES . � GAS LINES WILL BE ADJUSTED/RELOCATED AS NEEDED BY P|EOk4ON_ NATURAL GAS. THE 0 CONTRACTOR SHALL CONTACT PIEDMONT NATURAL GAS AT LEAST WEEKS PRIOR TO CONSTRUCTION, | EXISTING SANITARY SEWER AND WATER LINE: THE CONTRACTOR SHALL USE CAR[ WHEN WORKING AROUND SAN|T-RY SEWERS AND WATER � LINES, SHOULD THE CONTRACTOR DAMAGE EXISTING SEWER DR W/­ER LINES, HE SHALL IMMEDIATELY REPLACE THE LINE AT HIS EXPENSE WITH DUCTILE |RCN PIPE. THE CONTRAC10R [L | SHALL REPLACE SANITARY SEWER AND/OR WATER LINE, WITH A M!", MUM TEN FOOT SECTION OF DUCTILE IRON PIPE WHEN DRAINAGE PIPE COMES WITHIN TWO FIE-ET OF SAID L|NES, VERTICALLY DR HDR|ZONTALLY, so SUBSURFACE PLANS: 0 NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. TH� TRACTOR MAY MAKE HIS OWN INVESTIGATION TO DETERMINE SUBSURFACE CONDITIONS. MAIL BOXES: (D < THE CONTRACTOR SHALL RELOCATE ALL MAIL BOXES AS REQUIRED �Y SECTION 107-12 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES, OORD|NATL THIS WORK WITH � THE U.S. POSTAL SERVICE. 0 �� THE CONTRACTOR SHALL REMOVE AND RESET FENCES AS NOTED O'� THE PLANS AND/OR AS DIRECTED BY THE ENGINEER. c 0c) THE CONTRACTOR SHALL REMOVE TREES, SMRUBS, AND HEDGES WITHIN THE _,WITS OF DISTURBANCE +^ UNLESS SHOWN ON THE PLANS TO BE PROTECTED AND THOSE THAT FALL N*­M|N THE TREE PROTECTION '0 BARRIERS, THE CONTRACTOR SHALL ALSO PROTECT TREES AND SHRUBS OU-SIDE OF CUT/FILL LINES IN � ADDITION TO THOSE THAT RECEIVE TREES/SHRUB PROTECTION BARRIERS. �A! EN ROOT PRUNING IS NECESSARY, CUT ROOTS CLEANLY USING A DISC TRENCHER OR OTHER APPR��ED METHOD IN ACCORDANCE 3V:) =~ WITH SECTION 01000 OF THE CITY OF CHARLOTTE LANDSCAPE CONSTRUCTiO� STANDARDS. PRUNING SHALL BE PER THE LATEST STANDARD OF THE LANDSCAPE CONSTRUCTION S-ANDARDS MANUAL (TYP) ` C� CL � USE PLYWOOD FORMS WHEN TREE ROOTS ARE ADJACENT TO PROPOSED CUR & CUTTER DR SIDEWALK. USE CLD STD, 40.11 FOR BRIDGING TREE ROOTS, TREES SPECIFIED BY THE P--\N5 TO HAVE ASPHALT CURBING MUST USE CLD STD. 40.13. TREE PROTECTION SHALL BE IN ACC0R0,\NCE WITH CLD STD. 40�02 «-) V AND WITH SECTION 1000 OF THE CITY OF CHARLOTTE LANDSCAPE CONSTRUC-ON STANDARDS. WHEN !HE TREE IS CLOSE TO THE WORK AREA TREE PROTECTION CLD STD. 40.12 SMALL BE USED. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY PRIOR TO REMOVING �,NY TREES, IN ADDITION, ALL TREES LOCATED WITHIN THE LOD THAT ARE TO REMAIN AFTER CONSTRU�TION SHALL BE |NSPECTED BE THE CITY TO VERIFY THEY ARE SUITABLE TO RE-MAIN. TE �~ FOLLOWING CONSTRUCTION STAKING THE PROJECT TEAM (CONTRACTOR, CITY ',3PECTOR, CITY ARBOR|ST AND CONSULTANT' IF APPL|CABLE) WILL HOLD AN ON-SITE MEETING TO EN5WRE THE LIMITS OF DISTURBANCE AND THAT TREES PROPOSED FOR PROTECTION ARE CLEARLY IDENTIFIED. THE TEAM WILL WALK THE PROJECT AREA AND AGREE ON THE TREES TO BE PROTECTED AN- THOSE TO REMOVE. DISCUSS � PROPOSED CONSTRUCTION ACTIVlT|E5, AND IDENTIFY ANY ADDITIONAL TREES -O PROTECT THAT WERE NOT � ORIGINALLY MARKED AS SUCH. THE CONTRACTOR WILL BE GIVEN APPROVAL -OR TREE REMOVAL, IN cn E WRITING, AFTER APPROPRIATE TREE PROTECTION HAS BEEN INSTALLED AND EE-FORE ANY CLEARING OR REMOVAL CAN BEGIN. � � W THERE WILL BE NO ADDITIONAL PAYMENT FOR TREE PROTECTION INSTALLED l-�OUND ADDITIONAL TREES IDENTIFIED FOR PROTECTION. THE CONTRACTOR ASSUMES RESPONSIBILITY FOR "IN-KIND" REPLACEMENT OF TREES DAMAGED THAT HAVE BEEN MARKED FOR PROTECTION OR NOT MARKED FOR REMOVAL, � STRUCTURES INCLUDING STORM DRAIN PIPE, STORM STRUC�_RES, SEWER PIPE, AND RETAINING WALLS SHALL HAVE A TOLERANCE OF ±O]O FEET. STRUCTURES INCLUDING RISERS, WE|RS, AND ORIFICES, SHALL HAVE A TOLERANCE OF ±0.05 FEE[ STREAM IMPROVEMENT STRUCTURES SHALL HAVE A VERUCA_ TOLERANCE OF ±0]0 FEET. AND A PLAN|METR|C TOLERANCE OF ±0.50 FEET. SIDE SLOPES: THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL UENC�S IN ACCORDANCE YYUH THE APPROPRIATE CITY AND STATE EROSION AND SEDIMENT CDN�RDL ORDINANCES, THE CONTRACTOR SHALL PREVENT STANDING WATER DUE TO CDNWSTRUCTlON. DISTURBED AREAS SHALL BE SEEDED AND MULCHED AT THE DIRECTION OF THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE EROSION CONTROL MEASURES INCLUDED |N THIS PLAN SET, THE CONTRACTOR SHALL CONSTRUCT 6-INCH THICK CONCRETE ACCESSIBLE RAMPS AT INTERSECTIONS IN ACCORDANCE WITH THE LATEST REVISIONS FOR ACCESSIBLE RAMP DETAILS, CONSTRUCTION PLANS &c NCOOT STANDARD DRAWINGS. THE CONTRACTOR SHALL SAWCUT EXISTING ASPHALT AND/C_ CONCRETE SURFACES PRIOR T0 REMOVAL UNLESS OTHERWISE DIRECTED BY THE ENG|NEEp�. 5AVV CUT WIDTH SHALL BE 1 FOOT MINIMUM FROM THE EXISTING EDGE OF PAVEMENT. I�AVV CUT PAVEMENT SHALL BE REPLACED AS WELL AS ADDITIONAL PAVEMENT REQUIRED T0 TIE-IN TO FACE OF PROPOSED CURB AND GUTTER. Oil COOT HAS DETERMINED THAT NO PAVEMENT DEGRADATION E IS TO BE ASSESSED, COOT AND E&PM HAVE AGREED ON THE STREET CUTS FOR �H|CH A PAVEMENT DEGRADATION FEE IS REQUIRED, THE DEGRADATION FEE ASSESSMENT SH�LL BE PAID NA INTERNAL CITY MECHANISMS (DTI) PRIOR TO CONSTRUCTION. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MD��T CURRENT EDITION OF THE "WORK AREA TRAFFIC CONTROL HANDBOOK" (WATCH). EXISTING CONDITIONS TAKEN FROM GROUND SURVEY B, R.B. PHARR AND ASSOCIATES DATED 1/28/2015, ABANO.,--- .'..-'ABANDONED -NOT TO SCALE A. D... --..... ....-�.ALGEBRA|C HEAD DIFFERENCE ASPH'. ,,.,,ASPHALT APPROX.-..'.'. .' '-.APPRDX|MATELY B/C,......... - �I ... OF CURB BIT___ .... ...... -_ '��B|TUM|NOUS BM. _ '-_'_ .' .''..-'BENCH MARK BRG'.-'. ..... OF |NT CB�- �'...... -.CATCH BASIN C8cG .... ...... .--,-'CURB AND GUTTER CL_ .-'CLEARANCE C/L -'.--.-CHA|N L|NK FENCE CMP_- .... ........... -...CURRUCATED MTL PIPE CDNC_- ... - .... -CONCRETE CONST'-.-- ... -'PERM UTILITY ESMT DB_--.-. '.''-_'-DEED BOOK DCB_-_'_ ... ..,..,.....DOUBLE CB Di-. '... .'DROP INLET O(A-_- .... -''','D|AMETER DVK_-............. .'.--'DR|VEVVAY ...... R|GHT OF WAY 0M, -O|MENS|DN E'- -- ' ' ' '' .EAST/EAST|NC EA_ ...... -... ' -.'EACH ELEV ..' .. ' ' -'ELEVAUON EOP.... _ __ ' ' ........EDGE OF PAVEMENT ESk1T' ' ' - - 'EA3Ek4ENT EXI ST_ ' ' - ' -'EX|STlNG F/C� ........... OF CURB FES___' '. ENO SECTION FH' HYDRANT FDC__ ....... -.--F|BER OPTIC CABLE C\( ' .--GAS VALVE HOR|Z'--- '-.'HOR|ZDNTAL WIRE |NT__'__.......... -JNTER5[CUDN |N\(_ INVERT |P ...''..,IRON PIN SET L. ' -'..-'. lENGTH LF. .. ..,LINEAR FOOTAGE LT'.. .....,.,...LEFT VNTH |b..' POUNO LP . '' -'L|GHT POLE MAX_ ..... _ . -.. -MAX|MUM M|N'-_'_....... ....... .'. MINIMUM MONO.'.. ...... MONOLITHIC rnph ,....MILES PER HOUR WTL_--_ ' ..,..,,..METAL N., - .,..NORTH/NORTHING NTS.... -NOT TO SCALE D/H.- HEAD DC-'.- ..'ON CENTER PAVT'.--.-- --.PAVEMFNT PC .... ........ '.... ......POINT OF CURVATURE PERM. . ...... ' .... --P[RMAN[NT PG ... ........... _-�-'PAGE �1 PL_ ..... _.......-POINT OF |NT PK..-- NAIL SET Pp,----_-- -- POYVERPOLE PROP ... '..... -.--PROPO5ED PSE'.-. --.'PERM 5VV ESk4T PT--' ...... -yO|NT OF TANGENCY P\4'-' -.-.P0NT OF VERT |NT PUF-''-. -'PERM UTILITY ESMT r-'.-. RADIUS RT--.' -.---.-R|GHT RCP -.RF|NFDRCED CONIC PIPE RELOC---'...R[LOCATE R/W'----­- ...... R|GHT OF WAY S, ......... SOUTH SD- ---'- --.STORM DRAIN SF.. -'.. '''--5()UARE FOOT 5/R FENCE ............. ........ SPLIT RAIL FENCE SS ......... .... � ... -SANITARY SEWER STA ........ ....... ___ ... STATION STD.-- --.-.5TANDARD SVK.--.-. ........ SIDEWALK TAN-- .... ........ -'TANGENT TCE- ...... ....... .--.TLMP CONST ESMT TEMP-'............ -'TEMPORARY TP- ....... -.TRAVERSE POINT T/VV ... ___ ... -.-',.]EST WIRE TYP ........ --�--'-TYP|CAL U/G'. .-'.'.-UND[R GROUND VC-'_----.--.VERTICAL CURVE VLRL--.--.--.V[kTlCAL ---VVEST VV/, VNTH VVM- .......... '-WATER METER VV VAULT- - �-..... WATER VAULT VVV'-� ... ........ -..'VVATER VALVE 60p.- -£|XTY PENNY NAIL. SET ' FOOT " |NCH o���`�� ������q������ ����mu�������������� MAP NOT TO SCALE Fe1nce..,......~.....~..,~.......,..~~~...............~....~.~.,~..... Proposed Storm Drainage~~~~~.._.~..~~~...~~~~ IronPin......,.......~...........,........,...................~...~.~.........~~........~~......... 0 ExistingTree .......... ........,...........,.._~``~^~^~^~^~^~~~~~~~~~~~^ ~�`/ --6+ Existing Water Meter.,.............................~.......~.. .....~ VM [] ExistingWater Valve...............~........,.,....~.~.......~.. ~-~~C`< WV ExistingGas Valwe..............~.............................,....~....~,.,.~-..-.~~.~~.^.. CV >< Existing Sa��itary��e��er��anhwle...,...~~..~..........................~.....,.....,..`-' ;4 |�rm��oseK���anitary Se�wer��anhole..........�.....~........~..........................~_' �1 ExistingStorm Drain Manhole .............................................................. \�/ ProposedStorm Drain Manhole ....~.~~~._..^.^..~....~~....~~~~~~~~.,~~~~^.~.~~.~~~��� SiltFence ..................................................................................... Existing Telephone Manhole ................................................................. (// Proposed Telephone Manhole ,,,~,,,,~,~.~,,~,~~~~,,~~,,~._,..~....,....,~,~,~.,,~,~,,,\// Proposed Asphalt Pavement ........................................................ ������� Existing Electric Manhole ,,~~,,,~,.,,~~,~~,.~~,..,,~,,,,,,,~,~,..,~~~,,,,,,~~,.~.,..~~~,,,~\�/ Proposed Rip Rap Ditch .............................................................. Proposed Electric Manhole ................................................................... \�/ Existing Catch Basin .............................................................................. `--� Proposed Catch Basin ............................................................................ ��� ExistingLight P0le.............,....................~...............~...~...~~.~.............. Proposed Sidewalk Bridging Tree Roots ....~~.................~........ Proposed Light Pole ................................................................................ �� Existing Utility Pole ,,,~,,,,~,~,,,.,,,,,~,~,,,,-_~~~~,,~,~,~,.,...,..,,,~~~~.~,,~,,~~,,,~,,,~7a ProposedUtility Pole .............................................................................. �� IronPin......,.......~...........,........,...................~...~.~.........~~........~~......... 0 ExistingFire Hydrant ............................................................................ --6+ ProposedFire Hydrant .......................................................................... * ExistingDrop I0le|�..............................~...........,......�~~�~~~..�............`--� �� ProposedDrop Inlet ................................................................................ Accessible Ramp ................................................................................... `���^ Tree Protection ............................................................................ ProposedGuardrail ................................................................... SiltFence ..................................................................................... Proposed Curb & Gutter, Cone. Drive, Sidewalk.~.~~~.~~~~~,.~~.~ Proposed Asphalt Pavement ........................................................ ������� Proposed Rip Rap Ditch .............................................................. ���*���� Proposed Gravel ........................................................................... ��+��f�� ProposedPavement Removal ...................... -............................... Proposed Sidewalk Bridging Tree Roots ....~~.................~........ 201504 9 1 � W 40 9 04� PRELIMINARY NOTFOR CONSTRUCTION � W 40 9 04� qF NJ I U.9 ij r_Ar_MUl0r_ UUr- U ROBERT W. AND MARJORIE S. SIMS AMANDA R. MrrCHELL Sl(P-RPW) - Impact 2 Uu. f-U. /0-1 D& 24926, G. 269 10 If - Temporary PROJECT AREA, SEE LOT 10; BLOCK 5; MB. 1923, PG. 385 LOT 65; BLOCK 1; MB. 21, PG. 727 SHEETS 3 AND 4 PIN: 135-032-10 43,753 SQ. and Pump Around Fr. PIN: 135-022-59 Installation of Impervious Dike OR 1.0044 ACRES w , ITS. "STOOP A S SIPS S ['EPS f......... .. e Q AFTER PROJECT ACCEPTANCE BY THE CITY REPAIR DRIVEWAY TO MATCH PRE-CONSTRUCTION CONDITIONS I EAL) '70%6� IA� -- - -------- 0 SSfAH - SS — RiM� 710.33 . .. ............. 702.9,> max E -HEAllb Q1 ----- may.,. _---._ ------------ 13 '105,92 C R, 702��J�' me)( s 698,47 PC ------ IN 0, ELWOOD DRIVE -------- ------- N,�PHALJ 60' pUBLIC ----- ------ _q p(3 c,,D 4 . .... ..... --- — --- SSMH RV f'9(� 80 • I PRELIMINARY NOTIFOR CONSTRUCTION Rr • I rra PRELIMINARY NOTIFOR CONSTRUCTION rra 1, 0 IV lvi I 1 V. E 0 TYPICAL SECTION (NOT TO SCALE) 0 >1 ■ 20 ME 30 30 40 El e e ----------- SED LF GRAPHIC SCALE IN FEET PROPO±8TREE PROTECTION FENCE PER PROPOE D±12LFTREE 0 5 10 20 CL DSM 40.02 PROTECTION FENCE PER CL M 40.02 EXISTING CREEK A PROPOSED CREEK CENTERLINE CENTERLINE PROPOSED CREEK D FLOW PATH ____---c -c c 6 B c -TPIPLE 24" Twm TR -TREE T R 700 r mod. 11x I .. ..... 691 71 L7 . ... . ......... - ------ B 690 20 V .......... J 685 CHECK DAM, SEE c P e DETAIL SHEET 4 e e --------- e ------------- �e e e ------ D 680 675 20 30 40 50 wllolo� imm 680 E —50 —40 —30 —20 —10 0 10 20 30 40 50 675 SECTION "ID-D" TIE TO EXISTING 688, 685 1+25 C 0 —50 —40 —30 —20 —10 0 10 0 0 E m 700 I V) > 700 L0 (3 + Lr) 6 0 +0) (c) 00 11 Lo la C) 11 +00 690 < > F- LLj 11 F- Lj 11 F- W 0 ■ 20 ME 30 30 40 El e e ----------- SED LF GRAPHIC SCALE IN FEET PROPO±8TREE PROTECTION FENCE PER PROPOE D±12LFTREE 0 5 10 20 CL DSM 40.02 PROTECTION FENCE PER CL M 40.02 EXISTING CREEK A PROPOSED CREEK CENTERLINE CENTERLINE PROPOSED CREEK D FLOW PATH ____---c -c c 6 B c -TPIPLE 24" Twm TR -TREE T R 700 r mod. 11x I .. ..... 691 71 L7 . ... . ......... - ------ B 690 20 V .......... J 685 CHECK DAM, SEE c P e DETAIL SHEET 4 e e --------- e ------------- �e e e ------ D 680 675 20 30 40 50 wllolo� imm 680 E —50 —40 —30 —20 —10 0 10 20 30 40 50 675 SECTION "ID-D" TIE TO EXISTING 688, 685 1+25 C 0 —50 —40 —30 —20 —10 0 10 U"3 0 PRELIMINARY SECTION A-Alf " I V) > 700 L0 (3 + Lr) 6 0 +0) (c) 00 11 Lo _(D C) 11 +00 11 11 LLJ < < > F- LLj 11 F- Lj 11 F- W 0 c Li _j V) W < > � Ld 1+74 CL LLJ Lj c 0 Q_ < 0000 w r") 0 700 :5 81 LL- 0 ui 675 CL E F_ -i A z j 690 0 00 if 0 o if 680 0 a x 0 675 0- —50 —40 —30 —20 —10 0 10 z SECTION 1113-1311 < j -d 0 a_ cl I a Lo Z 1+95 0-I N C) c 700 690 4-+ 00 680 u 675 0 L_ —50 —40 —30 —20 —10 0 10 0- Pe Pr SECTION 0 E 2 c: c _c 2+21 . E5 ■ 20 ME 30 30 40 El e e ----------- SED LF GRAPHIC SCALE IN FEET PROPO±8TREE PROTECTION FENCE PER PROPOE D±12LFTREE 0 5 10 20 CL DSM 40.02 PROTECTION FENCE PER CL M 40.02 EXISTING CREEK A PROPOSED CREEK CENTERLINE CENTERLINE PROPOSED CREEK D FLOW PATH ____---c -c c 6 B c -TPIPLE 24" Twm TR -TREE T R 700 r mod. 11x I .. ..... 691 71 L7 . ... . ......... - ------ B 690 20 V .......... J 685 CHECK DAM, SEE c P e DETAIL SHEET 4 e e --------- e ------------- �e e e ------ D 680 675 20 30 40 50 wllolo� imm 680 E —50 —40 —30 —20 —10 0 10 20 30 40 50 675 SECTION "ID-D" TIE TO EXISTING 688, 685 1+25 (o Lc) r- ai 00' 0 00 0 PRELIMINARY C14 I V) > 700 L0 (3 + Lr) 6 0 +0) (c) 00 11 C. _(D C) 11 +00 11 11 LLJ < < > F- LLj 11 F- Lj 11 F- W 0 c Li _j V) W < > � Ld 690 CL LLJ Lj c 0 V) _j 0000 w +(o 680 E 81 c ui 675 ■ 20 ME 30 30 40 El e e ----------- SED LF GRAPHIC SCALE IN FEET PROPO±8TREE PROTECTION FENCE PER PROPOE D±12LFTREE 0 5 10 20 CL DSM 40.02 PROTECTION FENCE PER CL M 40.02 EXISTING CREEK A PROPOSED CREEK CENTERLINE CENTERLINE PROPOSED CREEK D FLOW PATH ____---c -c c 6 B c -TPIPLE 24" Twm TR -TREE T R 700 r mod. 11x I .. ..... 691 71 L7 . ... . ......... - ------ B 690 20 V .......... J 685 CHECK DAM, SEE c P e DETAIL SHEET 4 e e --------- e ------------- �e e e ------ D 680 675 20 30 40 50 wllolo� imm 680 E —50 —40 —30 —20 —10 0 10 20 30 40 50 675 SECTION "ID-D" TIE TO EXISTING 688, 685 1+25 0 (o Lc) r- ai 00' 0 00 0 PRELIMINARY C14 I +00 > 006 + co L0 (3 + Lr) 6 0 +0) (c) 00 11 LLJ _(D 11 11 +00 11 11 LLJ < < > F- LLj 11 F- Lj 11 F- W > V) v) w LLJ rl- 0 Li _j V) W < > � Ld �fn UJI Ljj LLJ Lj oi V) _j 0000 w +(o 11 io > ui F_ -i A LLJ 0 if if 0 (o Lc) 00' 0 00 0 PRELIMINARY C14 I > 000 < LLJ +(o LJ LLJ 11 > < Ui F- -J Ld • K) — — 06 + N 00 wwr PRELIMINARY NOTFOR w ar V) -i LJ 000 0 00 6 r.� N 00 +(o C14 11 11 > < w �fn UJI 11E TO EXISTING �m M 685 00 (D 2+50 ■ I is Zo wwr PRELIMINARY NOTFOR CONSTRUCTION ar • is Zo wwr PRELIMINARY NOTFOR CONSTRUCTION ar is Zo = 074 ar = 074 0 2. 0' *TIE TO EXISTING GROUND DITCH TYPICAL SECTION (NOT TO SCALE) d s 700 0 ai ,+-14 E Z' 690 Asir, < 700 0 :s LA- 1; 0 D- E 1 :3 z 8 < 10 690 0 -9 T 00 m 680 Lz 0 0 E 680 675 BELOW WOOD BRIDGE AND AROUND EXISTING FOOTERS 0 "o a 0 700 0 ro & o Is 690 7S 00 (n 680 0 675 1 0 -50 -40 -30 -20 -10 0 10 0) ul) E T Vic SECION -Cif SET ELEVATION TO MATCH 2 THE ELEVATION UPSTREAM co oo* OF WOOD BRIDGE Y. EL-690.60± c a M Ul ul N PROPOSED GRADE AT CENTERLINE c� 0 1+95 cr) 3. ID r" 00 n < uj + Zo to c6 -i if C) 7 700 M® LLJ > + ro —00 oo Lo V < LLJ F- -J if > 00 +(o OD F- -i if MOD 0) ul — + * 7 ul 690 V) Lli 0 r® 00 0)0 —0 000 < E u ) C,4 0 c 0 - ; 680 i F- -j V) Ld > 0) E 00 C 0 675 cy) oc) -50 -40 -30 -20 -10 0 10 SECTION "D-D" 20 30 40 680 675 50 700 690 680 675 20 30 40 50 684 0) flo 1+00 • J po u LLJ 0 co + ,4 if 0 Cif , eee 0) ul) 700 5 SET ELEVATION TO MATCH THE ELEVATION UPSTREAM co oo* OF WOOD BRIDGE Y. EL-690.60± • UD 00 M Ul ul N PROPOSED GRADE AT CENTERLINE c� 0 J po u LLJ 0 co + ,4 if 0 Cif , eee mw yll ma I Oil ✓ Or g, ONWON a gal mglm 7WR �4 11E TO EXISTING 10-001 696 =2 0) ul) 700 co oo* Y. • UD 00 M Ul ul + co c� 0 II > r" 00 n < uj + Zo to c6 -i if r- 05 7 M® LLJ > + ro —00 oo Lo < LLJ F- -J if > 00 +(o OD F- -i if MOD 0) ul — + * 7 ul V) Lli 0 r® 00 0)0 —0 000 < +(o u ) C,4 F- -j V) Ld > 00 cy) oc) V) ui 11 If 11 11 > > < ui < uj V) ui p mw yll ma I Oil ✓ Or g, ONWON a gal mglm 7WR �4 11E TO EXISTING 10-001 696 =2 Wi 0 Y. • Wi 0 • 0 0 M cep I m 0 'a n 45 I 0 E :3 E c 0 z m I m Is'] I 00 0 I U) Ld 0 C) 1-11, U) z DL 04 C) as LO as CL C) 0 c C/) 3: U) :2 C) 0 NO 0 CL -i 3: C) I--, m I I *mom I AE � s ar .° i i s a• i w 4 w. t. +wr a +i � y ix A L N A x Lo � y Y� i 01 Afie; ENERGY DISSIPATION NorF ENSURE AfJGUST 2003 aK IlEammmmm Tj ACCEPTABLE •t BE LIMITED TO SHEET PILES, SANDBAGS, t PLACEMENT t ACCEPTABLE SIZE STONE LINE WITH IMPERVIOUS t tw POLYPROPYLENE !%Wll Ivi IM t t i r, w i{#M yur r ■ r • I tfa i i NOTFOR CONSTRUCTION t•I�IY = wol i � ', 1, rn A • • • NOTFOR CONSTRUCTION t•I�IY = wol Qc +II�II�IIIA.. �trrr ter. i � 1, Qc +II�II�IIIA.. �trrr ter. m 2i I P I � 400000