Loading...
HomeMy WebLinkAbout2023-02-23 Stormwater & EC Report CombinedCENTRAL CAROLINA ENTERPRISE PARK LOT #9 SANFORD, NC STORMWATER AND EROSION CONTROL REPORT FEBRUARY 22, 2023 CE GROUP 301 GLENWOODAVENUE, SUITE220, RALEIGH, NC27603 Phone: (919) 367-8790 License # C-1739 TABLE OF CONTENTS I. INTRODUCTION II. METHODOLOGY III. SUMMARY OF RUN-OFF RESULTS IV. PLANNED EROSION CONTROL MEASURES V. CONCLUSION APPENDICES A. PROJECT MAPS 1. VICINITY MAP 2. NRCS SOILS MAP 3. USGS QUADRANGLE MAP 4. FEMA FIRMETTE B. EROSION CONTROL CALCULATIONS C. STORM DRAINAGE CALCULATIONS D. WET POND CALCULATIONS E. PRECIPITATION DATA F. DRAINAGE AREA MAPS 1. DRAINAGE AREA MAPS FOR EROSION CONTROL DESIGN i. SKIMMER BASIN DESIGN DRAINAGE AREA MAP ii. DIVERSION DITCH DESIGN DRAINAGE AREA MAP 2. DRAINAGE AREA MAPS FOR WET POND CALCULATIONS i. PRE -DEVELOPED DRAINAGE AREA MAP ii. POST -DEVELOPED DRAINAGE AREA MAP 3. DRAINAGE AREA MAPS FOR STORM DRAINAGE DESIGN I. INTRODUCTION The proposed development is for a 117,133 sf shell building for a future Industrial use. The site is located within the Central Carolina Enterprise Park (CCEP) and specifically mid way down Enterprise Park Drive between Colon Road and Womack Road in Sanford, North Carolina, south of Lots #6, which is currently being developed. The site is bordered to the West by Enterprise Park Drive, to the North by CCEP Lot #6, and to the East and South by undeveloped and residential parcels adjacent to the extents of CCEP. The general topography of the site is mildly steep, with elevations ranging from 265' to 235' above mean sea level. The existing site area drains to the buffers on the northern and southeastern borders of the site. The site almost entirely wooded area and after construction will be composed of several different land covers including impervious, grassed and wooded areas. Soils in the phase include Mayodan fine sandy loam (Mf) and MfE) - Hydrologic Soils Group B, Chewacla silt loam (Ch) - Hydrologic Soils Group B/D, and Nanford Silt Loam (NaB) - Hydrologic Soils Group B. The site falls within the FEMA Flood Insurance Rate Map 3710965500J dated 09/06/2006 and the 100 year flood plain is present on the southern border of the site, near the buffered area and existing sanitary sewer easement. All disturbed area and construction will take place outside of this flood plain. The site is within a WS-IV watershed and must adhere to all rules and regulations regarding stormwater discussed in this report. The full buildout of the project will consist of a 117,133 sf building, with the associated parking, truck delivery areas, utilities, storm drainage and stormwater facilities. The sanitary sewer will tie into the existing sanitary sewer manhole on the site. Due to the proposed increase in impervious area generated by this site, a Wet Pond is proposed to limit runoff. The Storm Drainage system and wet pond will be able to capture the majority of the runoff generated by this site. The wet pond outlet drains to the buffer area on the south side of the site. II. METHODOLOGY To control runoff from the construction of the project, a wet pond is proposed to capture a majority of the site. Sizing was based on controlling the 1-Year, 24 hour storm. The pre -developed vs. post -developed calculations were performed using Hydraflow Hydrographs 2004 to analyze these storms. The pond utilizes a riser structure, outlet pipe, and outlet dissipator which drains into an existing buffer at the edge of the property. The 100-year storm utilizes the emergency spillway but leaves over a foot of freeboard from the top of the pond. The time of concentration for the pre -developed and post -developed conditions were calculated using TR-55 methodology and the proposed and existing contours. The "C" values and "n" values used in stormwater calculations were determined using the NCDEQ Stormwater Design Manual. Curve Numbers (CN) were determined using the TR-55 manual. All Stormwater Pond calculations are in Appendix D of this report. The drainage area maps are located in Appendix F of this report. The storm drainage was designed using Hydraflow Storm Sewers 2016 and Hydraflow Express. The storm drainage can safely handle the 10-year storm for the Sanford, North Carolina area. The Hydraflow software uses the rational equation, composite "C" values and the drainage area to calculate the hydraulic grade line through the pipe and/or pipe network. Pipe sizes are determined from the location of the hydraulic grade line in the system to keep the HGL from exiting through the storm structures on site or flowing out of the swale they are connected to. The erosion control design for this site was created using information noted in the North Carolina Sediment and Erosion Control Planning and Design Manual, latest edition. All measures are designed for the 10-year frequency storm. All of the design elements are noted in the attached spreadsheets in Appendix B. III. SUMMARY OF RUN-OFF RESULTS Pre -Developed Post -Developed Drainage Area 1-Year 1-Year Discharge Discharge with Pond Pond Discharge 2.831 cfs 2.423 cfs VI. PLANNED EROSION CONTROL MEASURES Erosion Control Measures shall comply with the North Carolina Sediment and Erosion Control Planning and Design Manual, latest edition. Temporary Gravel Construction Entrance A temporary Gravel Construction entrance will be constructed at the entrance to site on the existing Enterprise Park Drive. This will be the only entrance that construction vehicles may use to access the site. In addition, during wet weather, vehicle tires may need to be washed in order to prevent offsite tracking of sediment. Temporary Silt Fence Temporary silt fence will be placed along perimeter of the disturbed areas. This will be done as necessary to keep any sediment from leaving the site and to protect the existing vegetation. Temporary Silt Fence Openings Temporary Silt Fence Openings have been placed at strategic locations along the proposed silt fence to allow for relief points for the silt fence. Temporary Riser Basin with Skimmer One temporary Riser Basin with Skimmer's will be installed (TSB 1) in order to trap sediment and prevent runoff from leaving the site too quickly. The skimmer will connect to the proposed wet pond outlet structure as indicated in the construction drawings. Upon stabilization of final grading, the skimmer basin will be cleaned out and brought to final grade for the proposed Wet Pond. Temporary Skimmer Basin One temporary skimmer Basins are proposed in Stage 1 of the erosion control plan to trap sediment during the clearing and grading operations. Temporary Diversion Ditches Temporary Diversion Ditches will be installed to convey runoff during construction towards the Temporary Skimmer / Riser Basins. They will be lined with a temporary erosion control matting, as specified on the Construction Drawings and will have temporary stone check dams installed at every 2' vertical elevation drop. Permanent Diversion Swale A permanent diversion will be installed to convey runoff during construction from an existing culvert running underneath Enterprise Park drive to the buffer / floodplain area on the southern corner of the site. The swale will be lined with a permanent erosion control matting, as specified on the Construction Drawings and will have temporary stone check dams installed at every 2' vertical elevation drop. Rolled Erosion Control Matting Rolled erosion control matting (North American Green 5150 Temporary Erosion Control Matting) will be applied to any slopes that are 3:1 or steeper. V. CONCLUSION It is our professional opinion that the planned erosion control measures and stormwater control measures that are planned for the development of this project will adequately and safely meet the needs and requirements of the State of North Carolina and the City of Sanford/Lee County. The stormwater control measures achieve discharge control requirements for the project and will safely handle up to the 100- year storm. APPENDICES APPENDIX A PROJECT MAPS APPENDIX B EROSION CONTROL CALCULATIONS TEMPORARY SHIMMER BASIN SIZING Project CCEP - Lot #9 Calcs by JCH Project No. 200-107 Date 2/19/2021 Skimmer Basin ID TSB #1 Drainage Area Data Area (square feet) Area (acres) Rational 'c' Disturbed area 184003 sf 4.22 ac. 0.50 Undisturbed wooded area 15288 sf 0.35 ac. 0.15 Undisturbed grassy area 0 sf 0.00 ac. 0.15 hnpervious Area 0 sf 0.00 ac. 0.95 Total drainage area to basin 4.58 ac. Composite Rational 'c' 0.47 Calculate Rainfall Intensity IDF curves for Sanford, NC Return Period 9 h Intensity 10 195 22 7.67 in/hr 25 232 23 8.45 in/hr Runoff Calculations Rainfall Runoff 10-year storm 7.67 in/hr 16.6 cfs 25-year storm 8.45 in/hr 18.3 cfs Skimmer Basin Design Data and Constraints Required skimmer basin volume 1,800 cubic feet per disturbed acre Required skimmer basin surface area 435 x Q(10) Skimmer Basin Dimensions Bottom length 110.0 ft Bottom width 55.0 ft Bottom Elevation 245.0 ft Sediment depth 2.0 ft Freeboard (from sediment depth) 1.5 ft Side slopes 3.0 H:1 V Spillway length 20.0 ft Height of berm 3.5 ft Top ofbasin length 131.0 ft Top ofbasin width 76.0 ft Top ofbasin elevation 248.5 ft Skimmer Basin Data Required Provided Sediment storage volume 7603 cu. ft. 14170 cu. ft. Sediment surface area 7220 sq. ft. 8170 sq. ft. Sediment storage depth 3.5 ft. (max.) 2.0 ft Basin bottom length to width ratio 2.OL:1 W (min) 2.OL:1 W Spillway length 8.0 ft. (min) 20.0 ft Spillway elevation 247.0 ft. (min) 247.0 ft 10-Year flow depth over spillway 0.50 ft. (max) 0.42 ft Freeboard at 10-Year discharge 1.00 ft. (min) 1.08 ft Skimmer Size 2 2 Skimmer Orifice Size 1.7 1.7 Draw Down Time 2-5 Days 3 Days Note: Calculations based on NC Sediment and Erosion Control Manual Calculate Skimmer Size Basin Volume in Cubic Feet 7,603 Cu.Ft Skimmer Size 2.0 Inch Days to Drain* 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.7 Inch[es] `In NC assume 3 days to drain TEMPORARY SHIMMER BASIN SIZING Project CCEP - Lot #9 Calcs by JCH Project No. 200-107 Date 2/19/2021 Skimmer Basin ID TSB #2 Drainage Area Data Area (square feet) Area (acres) Rational 'c' Disturbed area 157085 sf 3.61 ac. 0.50 Undisturbed wooded area 0 sf 0.00 ac. 0.15 Undisturbed grassy area 0 sf 0.00 ac. 0.15 hnpervious Area 0 sf 0.00 ac. 0.95 Total drainage area to basin 3.61 ac. Composite Rational 'c' 0.50 Calculate Rainfall Intensity IDF curves for Sanford, NC Return Period 9 h Intensity 10 195 22 7.67 in/hr 25 232 23 8.45 in/hr Runoff Calculations Rainfall Runoff 10-year storm 7.67 in/hr 13.8 cfs 25-year storm 8.45 in/hr 15.2 cfs Skimmer Basin Design Data and Constraints Required skimmer basin volume 1,800 cubic feet per disturbed acre Required skimmer basin surface area 435 x Q(10) Skimmer Basin Dimensions Bottom length 100.0 ft Bottom width 50.0 ft Bottom Elevation 244.0 ft Sediment depth 2.0 ft Freeboard (from sediment depth) 1.5 ft Side slopes 3.0 H:1 V Spillway length 15.0 ft Height of berm 3.5 ft Top ofbasin length 121.0 ft Top ofbasin width 71.0 ft Top ofbasin elevation 247.5 ft Skimmer Basin Data Required Provided Sediment storage volume 6491 cu. ft. 11890 cu. ft. Sediment surface area 6020 sq. ft. 6940 sq. ft. Sediment storage depth 3.5 ft. (max.) 2.0 ft Basin bottom length to width ratio 2.OL:1 W (min) 2.OL:1 W Spillway length 8.0 ft. (min) 15.0 ft Spillway elevation 246.0 ft. (min) 246.0 ft 10-Year flow depth over spillway 0.50 ft. (max) 0.45 ft Freeboard at 10-Year discharge 1.00 ft. (min) 1.05 ft Skimmer Size 2 2 Skimmer Orifice Size 1.7 1.7 Draw Down Time 2-5 Days 3 Days Note: Calculations based on NC Sediment and Erosion Control Manual Calculate Skimmer Size Basin Volume in Cubic Feet 6,491 Cu.Ft Skimmer Size 2.0 Inch Days to Drain* 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.6 Inch[es] `In NC assume 3 days to drain Project Name: CCHP - Lot #9 Project Name: CCPY - Lot #9 Std. C-Values Project Number: 200-107 Project Nomber: 200-107 Dist bed 0.5 Date: 2/19/2021 Date: 2/19/2021 11=III=1_I1= Woods 0.5 LocaRon: Sanford, NC Location: Sanford, NC Paved 0.9 Design Storm Return Year: 10 Design Storm Return Year: 10 — Grossed 0.5 Rainfall ltensity: 7.67 Rainfall ltemity: 7.67 Designer: JCH Designer: JCH Swale Calculations E, .. t DS75 Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 DRIVEWAY CULVERT (FES 131 TO FES 132) Invert Elev Dn (ft) = 253.75 Calculations Pipe Length (ft) = 87.00 Qmin (cfs) = 3.31 Slope (%) = 4.31 Qmax (cfs) = 3.31 Invert Elev Up (ft) = 257.50 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 3.31 No. Barrels = 1 Qpipe (cfs) = 3.31 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.39 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.15 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 254.85 HGL Up (ft) = 258.19 Embankment Hw Elev (ft) = 258.46 Top Elevation (ft) = 262.00 Hw/D (ft) = 0.64 Top Width (ft) = 25.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev (ft} 2v . 2.Fr . 251.44 0 10 20 30 40 50 60 7- ClrcularCulvert - HGL - Embank DRIVEWAY CULVERT IFE5 134 TO FES 132) Hvi Depth (ft:, 3.5 1.5 -0.50 -2.50 -4.50 -6.50 90 100 110 120 130 Reach (ft) CCEP-LOT9 CCEP LOT 9 LOCATION Sanford, NC ADDITIONAL INFORMATION Storm Outlet Structure FES No.= B1 Pipe Dia= 18 in Q25 = 3.31 cfs Qfull = 21.78 cfs Vfull = 12.29 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Dissipater Design DATE 02/22/21 DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) PROJECT NO 200-107 BY JCH CHECKED BY # of Barrels Quo/Qfull = 0.15 1 V/Vfull = 0.72 V = 8.8 fps Use 18in for chart Zone = 2 D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width = 3xDia = 4.5 ft Weight of Rip -rap = 4.00 Tons For multiple barrels, Zone and length calcs include 1.25 factor of correction. XI P:\200 ( Lee -Moore )\200-107 (Lee County Industrial Park)\Lot #9\Engineering\Erosion Control\2021-02-19 Rip Rap Outlet Dissipator Design.xls LATEST REVISION: 2/22/2021 2:58 PM Page 1 OF 4 Design Data NCDOT Riprap Class Midrange Stone Dia (D50) Min. Required Apron Thickness Dmax A 4in 9 6 B 8in 18 12 1 10in 22.5 15 2 14in 31.5 21 Dmax = D50 x 1.5 Thickness = Dmax x 1.5 Page 2 o � aaaaa am m � 4 �m i W IF aOR IIM Yir ------ Pi � Y�y Vy araa�� o� �idi0 i7 Y �W■ ■7i�t1 ra rso�a �aa®Y����a■ ■hilt* tea• 1p:a■ imYfM Yly��arsssar■ raaar� rm r�r rrarr■ ■rarn==wsa sa as:.m ��rsausaraaasa aa�+ssa■ - -----at W ■i---++, ur■ as w Ka i.a ■Yi11a■ RA N! IR P30 WL■ m f1IP 44W ---��- - �.p. TEMPORARY SKIMMER BASIN SIZING Project CCEP Lot 9 Project No. 200-107 Skimmer Basin ID TRB #1 Calcs by JCH Date 1/12/2023 Drainage Area Data Area Rational'C" Disturbed area 9.06 ac. 0.50 Undisturbed wooded area 0.00 ac. 0.25 Undisturbed grassy area 0.00 ac. 0.30 Other 0.00 ac. 0.90 Total drainage area to basin 9.06 ac. Composite Rational'c' 0.50 Runoff Calculations Rainfall Runoff 10-year storm 7.56 in/hr 34.2 cfs 25-year storm 8.28 in/hr 37.5 cfs Skimmer Basin Design Data and Constraints Required skimmer basin volume 3,600 cubic feet per disturbed acre Required skimmer basin surface area 435 square feet per 1 cfs of Q(25) Skimmer Stage/Storage Proposed Elevation (feet) Stage (feet) Contour Area (SO Average Contour Area (sf) Incremental Contour Volume (cf) Accumulated Contour Volume (cf) 240.0 0.0 12702 --- --- --- 241.0 1.0 15808 14255 14255 14255 242.0 2.0 17679 16744 16744 30999 243.0 3.0 19909 18794 18794 49793 243.5 3.5 22028 20969 10484 60277 244.0 4.0 24251 23140 11570 71847 245.0 5.0 26579 25415 25415 97262 246.0 6.0 28927 27753 27753 125015 247.0 7.0 31400 30164 30164 155178 248.0 8.0 32361 31881 31881 187059 249.0 9.0 24531 28446 28446 215505 250.0 10.0 26439 25485 25485 240990 Freeboard (from sediment depth) 7.0 Skimmer Basin Data Required Provided Sediment storage volume 32616 cu. ft. 49793 cu. ft. Sediment surface area 16320 sq.ft. 19909 sq.ft. Sediment storage depth 2.0 ft. (min) 3.0 ft Spillway length 10.0 ft. (min) 16.0 ft 25-Year flow depth over spillway 2.00 ft. (max) 0.79 ft Freeboard at 25-Year discharge 1.00 ft. (min) 2.21 ft Note: Calculations based on NC Sediment and Erosion Control Manual Calculate Skimmer Size Basin Volume in Cubic Feet 32,616 Cu.Ft Skimmer Size 4.0 Inch Days to Drain* 3 Days Orifice Radius 1.5 Inch[es] Orifice Diameter 2.9 Inch[es] `In NC assume 3 days to drain APPENDIX C STORM DRAINAGE CALCULATIONS Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 8 9 10 11 6 12 13 5 14 4 3 15 2 16 1 Outfall 17 18 19 20 Project File: New.stm Number of lines: 20 Date: 1/16/2023 Storm Sewers v2021.00 Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 1 End 45.172 -64.659 Comb 0.00 0.16 0.50 5.0 239.50 1.11 240.00 48 Cir 0.013 2.25 251.46 Al 2 1 75.000 -90.091 Comb 0.00 0.26 0.39 5.0 241.00 0.80 241.60 36 Cir 0.013 1.43 253.75 A2 3 2 60.008 70.319 Comb 0.00 0.06 0.49 5.0 242.60 0.75 243.05 24 Cir 0.013 0.50 255.27 A3 4 3 114.817 -1.240 Comb 0.00 0.29 0.48 5.0 243.25 0.74 244.10 24 Cir 0.013 0.62 254.95 A4 5 4 67.500 20.922 Comb 0.00 0.31 0.44 5.0 244.30 0.74 244.80 24 Cir 0.013 0.50 254.60 A5 6 5 82.000 0.000 Comb 0.00 0.22 0.51 5.0 245.00 0.73 245.60 24 Cir 0.013 0.50 254.70 A6 7 6 58.500 0.000 Comb 0.00 0.36 0.39 5.0 245.80 0.85 246.30 24 Cir 0.013 1.10 254.70 A7 8 7 101.338 43.301 DrGrt 0.00 0.32 0.58 5.0 246.50 0.79 247.30 24 Cir 0.013 1.15 256.00 A8 9 8 94.500 46.699 DrGrt 0.00 0.48 0.79 5.0 247.50 0.74 248.20 24 Cir 0.013 0.50 256.00 A9 10 9 95.974 0.000 DrGrt 0.00 0.49 0.79 5.0 248.40 0.73 249.10 24 Cir 0.013 0.50 256.00 A10 11 10 96.000 0.000 DrGrt 0.00 0.49 0.78 5.0 249.30 0.63 249.90 24 Cir 0.013 0.50 256.00 All 12 11 77.132 0.000 DrGrt 0.00 0.31 0.74 5.0 250.10 0.65 250.60 24 Cir 0.013 0.50 256.02 Al2 13 12 94.894 0.000 DrGrt 0.00 0.54 0.81 5.0 250.80 0.68 251.45 24 Cir 0.013 0.50 256.00 A13 14 13 76.358 0.000 DrGrt 0.00 0.40 0.77 5.0 251.95 0.77 252.54 18 Cir 0.013 1.00 256.04 A14 15 2 75.000 0.000 Comb 0.00 0.04 0.95 5.0 248.40 3.59 251.09 15 Cir 0.013 1.00 256.09 A15 16 1 75.000 89.909 Comb 0.00 1.10 0.87 5.0 241.50 2.13 243.10 30 Cir 0.013 0.50 250.96 A16 17 16 75.000 0.000 Comb 0.00 0.56 0.95 5.0 243.30 1.07 244.10 30 Cir 0.013 0.50 250.96 A17 18 17 75.000 0.000 Comb 0.00 0.22 0.95 5.0 244.60 1.07 245.40 24 Cir 0.013 0.50 250.96 A18 19 18 75.000 0.000 Comb 0.00 0.72 0.79 5.0 245.90 1.07 246.70 18 Cir 0.013 0.54 250.96 A19 20 19 96.415 -18.140 DrGrt 0.00 0.83 0.79 5.0 246.90 1.45 248.30 18 Cir 0.013 1.00 253.28 A20 Project File: New.stm Number of lines: 20 Date: 1/16/2023 Storm Sewers v2021.00 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) M (ft) (ft) (ft) (ft) No. 1 Al 36.64 48 Cir 45.172 239.50 240.00 1.107 247.28* 247.31 0.30 247.61 End Combination 2 A2 18.64 36 Cir 75.000 241.00 241.60 0.800 247.61* 247.67" 0.15 247.82 1 Combination 3 A3 17.95 24 Cir 60.008 242.60 243.05 0.750 247.82* 248.20' 0.25 248.45 2 Combination 4 A4 17.99 24 Cir 114.817 243.25 244.10 0.740 248.45* 249.18" 0.32 249.49 3 Combination 5 A5 17.23 24 Cir 67.500 244.30 244.80 0.741 249.49* 249.89' 0.23 250.12 4 Combination 6 A6 16.52 24 Cir 82.000 245.00 245.60 0.732 250.12* 250.56" 0.21 250.77 5 Combination 7 A7 15.91 24 Cir 58.500 245.80 246.30 0.855 250.77* 251.06" 0.44 251.50 6 Combination 8 A8 15.19 24 Cir 101.338 246.50 247.30 0.789 251.50' 251.96' 0.42 252.38 7 DropGrate 9 A9 14.15 24 Cir 94.500 247.50 248.20 0.741 252.38" 252.75" 0.16 252.90 8 DropGrate 10 A10 11.81 24 Cir 95.974 248.40 249.10 0.729 252.90' 253.17' 0.11 253.28 9 DropGrate 11 All 9.38 24 Cir 96.000 249.30 249.90 0.625 253.28" 253.44" 0.07 253.51 10 DropGrate 12 Al2 6.90 24 Cir 77.132 250.10 250.60 0.648 253.51* 253.58' 0.04 253.62 11 DropGrate 13 A13 5.48 24 Cir 94.894 250.80 251.45 0.685 253.62* 253.68" 0.02 253.70 12 DropGrate 14 A14 2.36 18 Cir 76.358 251.95 252.54 0.773 253.70 253.73 0.04 253.77 13 DropGrate 15 A15 0.29 15 Cir 75.000 248.40 251.09 3.587 248.53 251.30 n/a 251.30 2 Combination 16 A16 20.87 30 Cir 75.000 241.50 243.10 2.133 247.61* 247.80" 0.14 247.94 1 Combination 17 A17 14.30 30 Cir 75.000 243.30 244.10 1.067 247.94* 248.03' 0.07 248.10 16 Combination 18 A18 10.60 24 Cir 75.000 244.60 245.40 1.067 248.10* 248.26" 0.09 248.35 17 Combination 19 A19 9.15 18 Cir 75.000 245.90 246.70 1.067 248.35' 248.92' 0.23 249.15 18 Combination 20 A20 5.03 18 Cir 96.415 246.90 248.30 1.452 249.15 249.31 0.24 249.56 19 DropGrate Project File: New.stm Number of lines: 20 Run Date: 1/16/2023 NOTES: Return period = 10 Yrs. ; *Surcharged (HGL above crown). Storm Sewers v2021.00 Storm Sewer Profile Proj. file: New.stm Elev. (ft) 270.00 O O C ~ O O M M O N W p LLI N O-pW m E; inC� S J Q C ' 000 � ?00 .-- O�- NNN O WWW m E>; in xE N J Q C ' �00 n ^(OO .- M�-N N NNN WWW B E;; ��S V M J Q C J Q C �ln ((j ' 000 CD NON � OEM P 0MM O �d'V NLO NN a NNN WWW N WWW EE;; Cn xE RSs M J Q C ' 000 0) OWO �V(O to NNN M WWW m E;; iWEC O J Q C ' 000 0) �(flO V IqK)(n NNN WWW E;; o SCE r J O ' 00 CD �M O 'T(6 NN CD WW E; cn WE 270.00 263.00 256.00 263.00 256.00 249.00 249.00 AT ----------------- ----------- ---------- - — — - - -------------- 242.00 --------- -------- 0 235.00 0 50 HGL d ° - o 100 150 200 250 300 EGL Reach (ft) 82.00OLf 24" - o 350 400 450 242.00 .85% .7 ° 235.00 500 550 Storm Sewers Storm Sewer Profile Proj. file: New.stm Elev. (ft) 263.00 259.00 255.00 251.00 247.00 243.00 0 0 CO M � C O C � C � C 3 J Q C J C 0 C N M cl C 7 C 3 C j C S J p C J 0 C J 0 C J O I��R���ii��l■��I■��I��■I�I�I■ ii��l��ll��l ■��I■�� I���■I�I� •irk✓_--------- 50 HGL 263.00 259.00 255.00 251.00 18" @ 0.77% 247.00 243.00 100 150 200 250 300 350 400 450 500 550 600 650 ------- EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm Elev. (ft) O� pfO Ca MrC6 0 N N N owuww mE>> 65Ecc J O 00 O (0, ^ N N o ww m -5E> in 265.00 261.00 265.00 261.00 257.00 257.00 253.00 253.00 249.00 249.00 — - - - ___-- - 245.00 245.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm Elev. (ft) 263.00 258.00 253.00 248.00 243.00 238.00 0 � w rn � 7 C O C C C C 0 C M I I F a ff. 6F1� iM"M II� W ��i��������� II��IF,1WM ---------------- ---------------- ---------------- 25 50 75 — HGL EGL i 263.00 258.00 253.00 248.00 243.00 238.00 100 125 150 175 200 225 250 275 300 325 350 375 400 Reach (ft) Storm Sewers APPENDIX D WET POND CALCULATIONS WET POND CALCULATIONS Project CCEP - Lot #9 Cales by JCH, PE Project No. 200-107 Date 7/1/2021 Wet Pond ID: Wet Pond Drainage Area Information Area (sf) Area (ac) Impervious Area 260,547 sq. ft. 5.98 ac. Open Space and Wooded Areas 134,128 sq. ft. 3.08 ac. Total Drainage Area to Wet Pond 9.06 ac. Impervious Area Percentage (IA) 0.66 Water Quality Volume Calculations V - 3,630 (RD)*(Rv)*(A) = 21,185.50 cu ft Where: RD= 1"or 1.5" 1.0 in Rv = 0.05 + 0.9(IA) = 0.644 Wet Pond Area Calculations Average Depth of Main Pool Dgvq - Vpp / Are DAvq = Average Depth Vpp = Volume of Permanent Pool App -Area of Permanent Pool DAvq - 3.18 DAvq Used - 3.0 Surface Area / Drainage Area Ratio Impervious %= 66.02 SA / DA Ratio = 2.34 <- (Interpolated from Table 2 - NCDENR BMPManual) SA Required = 0.2123 (In Acres) Surface Area Required 9246 sq. ft. Surface Area Provided 11175 sq. ft. Wetland Calculations Notes Contour feet Stage fee[ Contour area acres Contour area s Averagecontour area s Incr.contour volume c Accum.contour volume c Bottom of Pond 238.00 0.0 0.071 3,075 239.00 1.0 0.095 4,127 3,601 3,601 3,601 240.00 2.0 0.123 5,346 4,737 4,737 8,338 241.00 3.0 0.152 6,628 5,987 5,987 14,325 242.00 4.0 0.183 7,974 6,660 13,320 21,658 Bottom Shelf 243.00 5.0 0.215 9,385 7,366 22,097 30,434 Permanent Pool 243.50 5.5 0.257 11,175 10,280 5,140 35,574 Top Shelf 244.00 6.0 0.285 12,399 11,787 5,894 41,468 245.00 7.0 0.314 13,665 13,032 13,032 54,500 Temporary Pool 245.50 7.5 0.329 14,314 13,990 6,995 61,494 246.00 8.0 0.440 19,146 18,722 9,361 70,855 247.00 9.0 0.479 20,884 20,015 20,015 90,870 248.00 10.0 0.521 22,679 21,782 21,782 112,652 249.00 0.5637 24531 23,6055 23605 136,25712.0 ofDm 2 2,49 2548 25,485 61,742T Forebay Calculations (FB #1) - Entry Forebay Total Forbay Volume = 15% - 20% of Main Pool Volume 15% 20% Drainage to Forebay = 9.06 ac. 9.06 ac. % of Total Drainage= 100.0% 100.0% Main Pool Volume= 35,574 35,574 Forebay Volume Required = 5,336 7,114 Forebay Volume Provided= 5,789 16.27% Notes Contour feet Stage (feet) Contour area acres Contour area s Average contour area s Iner. contour volume c Accum. contour volume c Bottom of Pond 240.00 0.0 0.020 850 241.00 1.0 0.028 1,239 1,045 1,045 1,045 242.00 2.0 0.039 1,693 1,466 1,466 2,511 Bottom Shelf 243.00 3.0 0.051 2,211 1,952 1,952 4,463 Permanent Pool 243.50 3.5 0.071 3,095 2,653 1,327 5,789 Top Shelf 244.00 4.0 0.079 3,440 3,268 1,634 7,423 245.00 5.0 0.087 3,799 3,620 3,620 11,042 ITearporary Pool 245.50 5.5 0.091 3,984 3,892 1,946 12,988 Total Volume Calculations Wet Pond 25,920 con ft Forebay 7,199 cu ft Total Volume 33,119 cu ft OK Table of Contents 2021-07-01 Wet Pond Design.gpw Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hydrograph Return Period Recap........................................................................... 1 1 -Year SummaryReport....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, SCS Runoff, Pre -Developed A................................................................. 3 Hydrograph No. 2, SCS Runoff, Post -Developed to Wet Pond .............................................. 4 Hydrograph No. 3, SCS Runoff, Post -Developed Bypass A ................................................... 5 Hydrograph No. 4, Reservoir, Wet Pond Outflow................................................................... 6 Hydrograph No. 5, Combine, Post -Developed A Total............................................................ 7 10 -Year SummaryReport....................................................................................................................... 8 HydrographReports................................................................................................................. 9 Hydrograph No. 1, SCS Runoff, Pre -Developed A................................................................. 9 Hydrograph No. 2, SCS Runoff, Post -Developed to Wet Pond ............................................ 10 Hydrograph No. 3, SCS Runoff, Post -Developed Bypass A ................................................. 11 Hydrograph No. 4, Reservoir, Wet Pond Outflow................................................................. 12 Hydrograph No. 5, Combine, Post -Developed A Total.......................................................... 13 100 -Year SummaryReport..................................................................................................................... 14 HydrographReports............................................................................................................... 15 Hydrograph No. 1, SCS Runoff, Pre -Developed A............................................................... 15 Hydrograph No. 2, SCS Runoff, Post -Developed to Wet Pond ............................................ 16 Hydrograph No. 3, SCS Runoff, Post -Developed Bypass A ................................................. 17 Hydrograph No. 4, Reservoir, Wet Pond Outflow................................................................. 18 Hydrograph No. 5, Combine, Post -Developed A Total.......................................................... 19 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) No. type Hyd(s) (origin) 1-Yr 2-Yr 3-Yr 5-Yr 7 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 2.831 ------- ------- 2 SCS Runoff ------- 27.31 --- ------- 3 SCS Runoff ------- 2.207 ------- ------- 4 Reservoir 2 0.259 --- ------- 5 Combine 3,4 2.423 ------- ------- Hydrograph description ------- 19.08 ------- ------- 44.58 Pre -Developed A ------- 56.95 ------- ------- 90.38 Post -Developed to Wet Pond ------- 11.33 ------- ------- 24.64 Post -Developed Bypass A ------- 6.383 ------- ------- 27.72 Wet Pond Outflow ------- 17.21 ------- ------- 53.91 Post -Developed A Total Proj. file: 2021-07-01 Wet Pond Design.gpw Thursday, Jan 12 2023, 4:05 PM Hydraflow Hydrographs by Intelisolve Hydrograph Su Hyd. Hydrograph Peak No. type flow (origin) (cfs) 1 SCS Runoff 2.831 2 SCS Runoff 27.31 3 SCS Runoff 2.207 4 Reservoir 0.259 5 Combine 2.423 M M Z Time interval (min) 2 2 2 2 2 iry Report Time to Volume peak (min) (cuft) 734 19,792 716 55,785 730 10,930 1394 52,727 730 63.656 Inflow Maximum Maximum Hydrograph hyd(s) elevation storage description (ft) (cuft) ---- ------ ------ Pre -Developed A ---- ------ ------ Post -Developed to Wet Pond ---- ------ ------ Post -Developed Bypass A 2 246.10 44,402 Wet Pond Outflow 3,4 ------ ------ Post -Developed A Total 2021-07-01 Wet Pond Design.gpw Return Period: 1 Year Thursday, Jan 12 2023, 4:05 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre -Developed A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 15.090 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.99 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 e 2 Hyd No. 1 Thursday, Jan 12 2023, 4:5 PM Peak discharge = 2.831 cfs Time interval = 2 min Curve number = 61 Hydraulic length = Oft Time of conc. (Tc) = 29.20 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 19,792 cuft Pre -Developed A Hyd. No. 1 -- 1 Yr 5 7 9 12 14 16 19 21 23 Q (cfs) 3.00 2.00 1.00 1 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 2 Post -Developed to Wet Pond Hydrograph type = SCS Runoff Peak discharge = 27.31 cfs Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.060 ac Curve number = 88 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 m 4.00 Post -Developed to Wet Pond Hyd. No. 2 -- 1 Yr Hydrograph Volume = 55,785 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 ' 0.00 0.0 2.3 4.7 7.0 9.3 11.7 14.0 16.3 18.7 21.0 23.3 Hyd No. 2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Post -Developed Bypass A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 6.370 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.99 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 Thursday, Jan 12 2023, 4:5 PM Peak discharge = 2.207 cfs Time interval = 2 min Curve number = 64 Hydraulic length = Oft Time of conc. (Tc) = 20.60 min Distribution = Type II Shape factor = 484 Post -Developed Bypass A Hyd. No. 3 -- 1 Yr 0.00 0 2 5 7 9 12 14 16 Hyd No. 3 Hydrograph Volume = 10,930 cuft 19 21 23 Q (cfs) 3.00 2.00 1.00 1 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 4 Wet Pond Outflow Hydrograph type = Reservoir Peak discharge = 0.259 cfs Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 246.1Oft Reservoir name = Wet Pond Max. Storage = 44,402 cuft Storage Indication method used. Q (cfs) 28.00 24.00 20.00 16.00 12.00 m 4.00 e Wet Pond Outflow Hyd. No. 4 -- 1 Yr Hydrograph Volume = 52,727 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 10 19 29 39 48 58 68 77 87 97 Time (hrs) Hyd No. 4 Hyd No. 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 5 Post -Developed A Total Hydrograph type = Combine Peak discharge = 2.423 cfs Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 3, 4 Q (cfs) 3.00 2.00 1.00 e Post -Developed A Total Hyd. No. 5 -- 1 Yr Hydrograph Volume = 63,656 cuft Q (cfs) 3.00 2.00 1.00 y 0.00 10 19 29 39 48 58 68 77 87 97 Time (hrs) Hyd No. 5 Hyd No. 3 Hyd No. 4 Hydrograph Su Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) 1 19.08 2 SCS Runoff 56.95 3 SCS Runoff 11.33 4 Reservoir 6.383 5 Combine 17.21 M M Z Time interval (min) 2 2 2 2 2 iry Report Time to peak (min) 732 Volume (cuft) Inflow hyd(s) ---- 83,689 716 120,753 ---- 728 41,232 ---- 736 112,422 2 728 153,654 3,4 Maximum Maximum Hydrograph elevation storage description (ft) (cuft) ------ ------ Pre -Developed A ------ ------ Post -Developed to Wet Pond ------ ------ Post -Developed Bypass A 247.28 68,699 Wet Pond Outflow ------ ------ Post -Developed A Total 2021-07-01 Wet Pond Design.gpw Return Period: 10 Year Thursday, Jan 12 2023, 4:05 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 1 Pre -Developed A Hydrograph type = SCS Runoff Peak discharge = 19.08 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 15.090 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 29.20 min Total precip. = 5.26 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 2 5 7 Hyd No. 1 Pre -Developed A Hyd. No. 1 -- 10 Yr Hydrograph Volume = 83,689 cuft Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 I /1 1 1 1 1 1 \ 1 0.00 9 12 14 16 19 21 23 26 Time (hrs) 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 2 Post -Developed to Wet Pond Hydrograph type = SCS Runoff Peak discharge = 56.95 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.060 ac Curve number = 88 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.26 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 120,753 cuft Post -Developed to Wet Pond Q (cfs) Hyd. No. 2 -- 10 Yr Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 3 Post -Developed Bypass A Hydrograph type = SCS Runoff Peak discharge = 11.33 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 6.370 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 20.60 min Total precip. = 5.26 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 II 0 . SM 4.00 2.00 2 5 Hyd No. 3 Post -Developed Bypass A Hyd. No. 3 -- 10 Yr 7 9 Hydrograph Volume = 41,232 cuft Q (cfs) 12.00 10.00 IM OR 4.00 2.00 1 ' 0.00 12 14 16 19 21 23 26 Time (hrs) 12 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 4 Wet Pond Outflow Hydrograph type = Reservoir Peak discharge = 6.383 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 247.28 ft Reservoir name = Wet Pond Max. Storage = 68,699 cuft Storage Indication method used. Q (cfs) 60.00 40.00 30.00 20.00 10.00 e Wet Pond Outflow Hyd. No. 4 -- 10 Yr Hydrograph Volume = 112,422 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 10 19 29 39 48 58 68 77 87 97 Time (hrs) Hyd No. 4 Hyd No. 2 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 5 Post -Developed A Total Hydrograph type = Combine Peak discharge = 17.21 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyds. = 3, 4 Hydrograph Volume = 153,654 cuft Post -Developed A Total Q (cfs) Hyd. No. 5 -- 10 Yr Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 7 15 22 29 37 44 51 59 66 73 81 Time (hrs) Hyd No. 5 Hyd No. 3 Hyd No. 4 14 Hydrograph Su Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) 44.58 1 2 SCS Runoff 90.38 3 SCS Runoff 24.64 4 Reservoir 27.72 5 Combine 53.91 M M Z Time interval (min) 2 2 2 2 2 iry Report Time to peak (min) 732 Volume (cuft) Inflow hyd(s) ---- 182,032 716 197,692 ---- 726 86,002 ---- 724 189,282 2 724 275,284 3,4 Maximum Maximum Hydrograph elevation storage description (ft) (cuft) ------ ------ Pre -Developed A ------ ------ Post -Developed to Wet Pond ------ ------ Post -Developed Bypass A 248.76 102,120 Wet Pond Outflow ------ ------ Post -Developed A Total 2021-07-01 Wet Pond Design.gpw Return Period: 100 Year Thursday, Jan 12 2023, 4:05 PM Hydraflow Hydrographs by Intelisolve 15 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 1 Pre -Developed A Hydrograph type = SCS Runoff Peak discharge = 44.58 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 15.090 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 29.20 min Total precip. = 7.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 182,032 cuft Pre -Developed A Q (cfs) Hyd. No. 1 -- 100 Yr Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 — Hyd No. 1 Time (hrs) Hydrograph Plot 16 Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 2 Post -Developed to Wet Pond Hydrograph type = SCS Runoff Peak discharge = 90.38 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.060 ac Curve number = 88 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) Post -Developed to Wet Pond Hyd. No. 2 -- 100 Yr Hydrograph Volume = 197,692 cuft Q (cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0 00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 2 20.0 Time (hrs) 17 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 3 Post -Developed Bypass A Hydrograph type = SCS Runoff Peak discharge = 24.64 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 6.370 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 20.60 min Total precip. = 7.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 m 4.00 Post -Developed Bypass A Hyd. No. 3 -- 100 Yr Hydrograph Volume = 86,002 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 ' ' __ ' 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 3 Time (hrs) Hydrograph Plot 18 Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 4 Wet Pond Outflow Hydrograph type = Reservoir Peak discharge = 27.72 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 248.76 ft Reservoir name = Wet Pond Max. Storage = 102,120 cuft Storage Indication method used. Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Hydrograph Volume = 189,282 cult Wet Pond Outflow Hyd. No. 4 -- 100 Yr 0 3 7 10 13 17 20 23 27 30 33 Hyd No. 4 Hyd No. 2 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 37 Time (hrs) Hydrograph Plot 19 Hydraflow Hydrographs by Intelisolve Thursday, Jan 12 2023, 4:5 PM Hyd. No. 5 Post -Developed A Total Hydrograph type = Combine Peak discharge = 53.91 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 3, 4 Q (cfs) 60.00 Post -Developed A Total Hyd. No. 5 -- 100 Yr 50.00 40.00 30.00 20.00 10.00 0.00 0 2 5 7 9 Hyd No. 5 Hyd No. 3 Hydrograph Volume = 275,284 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 "' I I 1 0.00 12 14 16 19 21 23 26 Time (hrs) Hyd No. 4 stagfi 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Top of pond EIfiY. 250.00 12.00 ft Riser N- 2.5 in orificc CulYB - InY. 243.50 ' Si& �:lopfi fi�:timatfid aYfiragfi from contour Wet Pond ' CuIYA - 48.0 LF of 18.0 in @ 1.04% Section �1 20.00 ft R-xtan0ular wfiir 3.4, W-JrB - EIcY. 248.50 (100 Vr) (10 pr) -� (1 Vr) Schematic only. Not for construction. Hydraflow Hydrographs Pond Draw Project: 2021-07-01 Wet Pond Design.gpw Thursday, Jan 12 2023, 4:00 PM Wet Pond 20.00 ft R-xtan0ular wfiir W-2irB - EIfiY. 243.50 Top of pond StaOfi EIfiY.250.00 — 7.00 — 6.00 — 5.00 - - 12.00 ft Riper - 4.00 W-eirA - EIeY. 247.00 43.0 LF of 18.0 in 1.04% — 3.00 CuIYA - InY. 243.00 - 2.00 2.5 in orifice - GulYB - InY. 243.50 -1.00 - - -- - -- rr L5 — 0.00 .' Front View NT3 - Looking aown�:tream (100 Vr) (10 pr) (1 Vr) Schematic only. Not for construction. Hydraflow Hydrographs Pond Draw Project: 2021-07-01 Wet Pond Design.gpw Thursday, Jan 12 2023, 3:59 PM Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (sf) (cf) (cf) (ft) hi (S) In (Z) Z est 243.50 14,270 - - 0.00 244.00 15,839 7,527 7,527 0.50 8.93 -0.69 0.50 245.00 17,464 16,652 24,179 1.50 10.09 0.41 1.49 245.50 18,298 8,941 33,119 2.00 10.41 0.69 2.01 Regression Output: b= 1.066923627 (X Variable Coeff) Ks= 15,755 (eY'"""n") Stage - Storage Equation is of the form: S = (Ks)(Z)b Check of Ks and b : S = Ks z Storage Area Stage 7,521 0.5 24,283 1.5 33,007 2 Barrel n factor = 0.013 Dia. of Orifice = 18.0 inches Area of Orifice, (Ao) = 1.77 sf Pipe Length, (L) = 48.0 feet Friction Coeff., (Kp) = 0.0182 Inv. of Barrel = 243.0 feet Riser Elev. of Riser Crest = 245.5 feet Circular: Dia. of Riser = inches Weir Length = feet Area of Riser = sq. ft. Rectangular. Length of Riser = 4.0 feet Width of Riser = 4.0 feet Weir Length = 16 feet Area of Riser = 16 sq.ft. Barrel None Dia. of Barrel = 2.5 inches Inv of Control Barrel 243.5 Area 0.034088433 Page 1 of 21 Control TOTAL TIME INFLOW STORAGE STAGE BARREL OUTFLOW min cfs ct (1t) cfs cfs 0.00 0.00 33,119 2.01 0.23 0.23 3.00 0.00 33119 2.01 0.23 0.23 6.00 0.00 33077 2.00 0.23 0.23 9.00 0.00 33036 2.00 0.23 0.23 12.00 0.00 32994 2.00 0.23 0.23 15.00 0.00 32952 2.00 0.23 0.23 18.00 0.00 32910 1.99 0.23 0.23 21.00 0.00 32869 1.99 0.23 0.23 24.00 0.00 32827 1.99 0.23 0.23 27.00 0.00 32785 1.99 0.23 0.23 30.00 0.00 32744 1.99 0.23 0.23 33.00 0.00 32702 1.98 0.23 0.23 36.00 0.00 32660 1.98 0.23 0.23 39.00 0.00 32619 1.98 0.23 0.23 42.00 0.00 32577 1.98 0.23 0.23 45.00 0.00 32536 1.97 0.23 0.23 48.00 0.00 32494 1.97 0.23 0.23 51.00 0.00 32453 1.97 0.23 0.23 54.00 0.00 32411 1.97 0.23 0.23 57.00 0.00 32370 1.96 0.23 0.23 60.00 0.00 32328 1.96 0.23 0.23 63.00 0.00 32287 1.96 0.23 0.23 66.00 0.00 32246 1.96 0.23 0.23 69.00 0.00 32204 1.95 0.23 0.23 72.00 0.00 32163 1.95 0.23 0.23 75.00 0.00 32122 1.95 0.23 0.23 78.00 0.00 32080 1.95 0.23 0.23 81.00 0.00 32039 1.95 0.23 0.23 84.00 0.00 31998 1.94 0.23 0.23 87.00 0.00 31957 1.94 0.23 0.23 90.00 0.00 31916 1.94 0.23 0.23 93.00 0.00 31875 1.94 0.23 0.23 96.00 0.00 31833 1.93 0.23 0.23 99.00 0.00 31792 1.93 0.23 0.23 102.00 0.00 31751 1.93 0.23 0.23 105.00 0.00 31710 1.93 0.23 0.23 108.00 0.00 31669 1.92 0.23 0.23 111.00 0.00 31628 1.92 0.23 0.23 114.00 0.00 31587 1.92 0.23 0.23 117.00 0.00 31546 1.92 0.23 0.23 120.00 0.00 31506 1.91 0.23 0.23 123.00 0.00 31465 1.91 0.23 0.23 126.00 0.00 31424 1.91 0.23 0.23 129.00 0.00 31383 1.91 0.23 0.23 132.00 0.00 31342 1.91 0.23 0.23 135.00 0.00 31301 1.90 0.23 0.23 138.00 0.00 31261 1.90 0.23 0.23 141.00 0.00 31220 1.90 0.23 0.23 144.00 0.00 31179 1.90 0.23 0.23 147.00 0.00 31139 1.89 0.23 0.23 150.00 0.00 31098 1.89 0.23 0.23 153.00 0.00 31057 1.89 0.23 0.23 156.00 0.00 31017 1.89 0.23 0.23 159.00 0.00 30976 1.88 0.23 0.23 162.00 0.00 30935 1.88 0.23 0.23 165.00 0.00 30895 1.88 0.23 0.23 168.00 0.00 30854 1.88 0.22 0.22 171.00 0.00 30814 1.88 0.22 0.22 174.00 0.00 30773 1.87 0.22 0.22 177.00 0.00 30733 1.87 0.22 0.22 180.00 0.00 30693 1.87 0.22 0.22 183.00 0.00 30652 1.87 0.22 0.22 186.00 0.00 30612 1.86 0.22 0.22 189.00 0.00 30572 1.86 0.22 0.22 192.00 0.00 30531 1.86 0.22 0.22 195.00 0.00 30491 1.86 0.22 0.22 198.00 0.00 30451 1.85 0.22 0.22 201.00 0.00 30410 1.85 0.22 0.22 204.00 0.00 30370 1.85 0.22 0.22 207.00 0.00 30330 1.85 0.22 0.22 210.00 0.00 30290 1.85 0.22 0.22 213.00 0.00 30250 1.84 0.22 0.22 216.00 0.00 30210 1.84 0.22 0.22 Page 2 of 21 0.00 30170 1.84 0.22 0.00 30130 1.84 0.22 0.00 30090 1.83 0.22 0.00 30050 1.83 0.22 0.00 30010 1.83 0.22 0.00 29970 1.83 0.22 0.00 29930 1.82 0.22 0.00 29890 1.82 0.22 0.00 29850 1.82 0.22 0.00 29810 1.82 0.22 0.00 29770 1.82 0.22 0.00 29730 1.81 0.22 0.00 29691 1.81 0.22 0.00 29651 1.81 0.22 0.00 29611 1.81 0.22 0.00 29571 1.80 0.22 0.00 29532 1.80 0.22 0.00 29492 1.80 0.22 0.00 29452 1.80 0.22 0.00 29413 1.80 0.22 0.00 29373 1.79 0.22 0.00 29334 1.79 0.22 0.00 29294 1.79 0.22 0.00 29255 1.79 0.22 0.00 29215 1.78 0.22 0.00 29176 1.78 0.22 0.00 29136 1.78 0.22 0.00 29097 1.78 0.22 0.00 29057 1.77 0.22 0.00 29018 1.77 0.22 0.00 28979 1.77 0.22 0.00 28939 1.77 0.22 0.00 28900 1.77 0.22 0.00 28861 1.76 0.22 0.00 28822 1.76 0.22 0.00 28782 1.76 0.22 0.00 28743 1.76 0.22 0.00 28704 1.75 0.22 0.00 28665 1.75 0.22 0.00 28626 1.75 0.22 0.00 28587 1.75 0.22 0.00 28548 1.75 0.22 0.00 28509 1.74 0.22 0.00 28470 1.74 0.22 0.00 28431 1.74 0.22 0.00 28392 1.74 0.22 0.00 28353 1.73 0.22 0.00 28314 1.73 0.22 0.00 28275 1.73 0.22 0.00 28236 1.73 0.22 0.00 28197 1.73 0.22 0.00 28158 1.72 0.22 0.00 28120 1.72 0.22 0.00 28081 1.72 0.22 0.00 28042 1.72 0.22 0.00 28003 1.71 0.21 0.00 27965 1.71 0.21 0.00 27926 1.71 0.21 0.00 27887 1.71 0.21 0.00 27849 1.71 0.21 0.00 27810 1.70 0.21 0.00 27772 1.70 0.21 0.00 27733 1.70 0.21 0.00 27695 1.70 0.21 0.00 27656 1.69 0.21 0.00 27618 1.69 0.21 0.00 27579 1.69 0.21 0.00 27541 1.69 0.21 0.00 27503 1.69 0.21 0.00 27464 1.68 0.21 0.00 27426 1.68 0.21 0.00 27388 1.68 0.21 0.00 27349 1.68 0.21 0.00 27311 1.67 0.21 0.00 27273 1.67 0.21 0.00 27235 1.67 0.21 0.00 27196 1.67 0.21 0.00 27158 1.67 0.21 Page 3 of 21 3963.00 0.00 548 0.04 0.03 3966.00 0.00 542 0.04 0.03 3969.00 0.00 536 0.04 0.03 3972.00 0.00 530 0.04 0.03 3975.00 0.00 524 0.04 0.03 3978.00 0.00 518 0.04 0.03 3981.00 0.00 512 0.04 0.03 3984.00 0.00 506 0.04 0.03 3987.00 0.00 500 0.04 0.03 3990.00 0.00 494 0.04 0.03 3993.00 0.00 488 0.04 0.03 3996.00 0.00 482 0.04 0.03 3999.00 0.00 476 0.04 0.03 4002.00 0.00 471 0.04 0.03 4005.00 0.00 465 0.04 0.03 4008.00 0.00 459 0.04 0.03 4011.00 0.00 454 0.04 0.03 4014.00 0.00 448 0.04 0.03 4017.00 0.00 443 0.04 0.03 4020.00 0.00 437 0.03 0.03 4023.00 0.00 432 0.03 0.03 4026.00 0.00 426 0.03 0.03 4029.00 0.00 421 0.03 0.03 4032.00 0.00 415 0.03 0.03 4035.00 0.00 410 0.03 0.03 4038.00 0.00 404 0.03 0.03 4041.00 0.00 399 0.03 0.03 4044.00 0.00 394 0.03 0.03 4047.00 0.00 389 0.03 0.03 4050.00 0.00 383 0.03 0.03 4053.00 0.00 378 0.03 0.03 4056.00 0.00 373 0.03 0.03 4059.00 0.00 368 0.03 0.03 4062.00 0.00 363 0.03 0.03 4065.00 0.00 358 0.03 0.03 4068.00 0.00 353 0.03 0.03 4071.00 0.00 348 0.03 0.03 4074.00 0.00 343 0.03 0.03 4077.00 0.00 338 0.03 0.03 4080.00 0.00 333 0.03 0.03 4083.00 0.00 328 0.03 0.03 4086.00 0.00 323 0.03 0.03 4089.00 0.00 319 0.03 0.03 4092.00 0.00 314 0.03 0.03 4095.00 0.00 309 0.03 0.03 4098.00 0.00 305 0.02 0.03 4101.00 0.00 300 0.02 0.03 4104.00 0.00 295 0.02 0.03 4107.00 0.00 291 0.02 0.03 4110.00 0.00 286 0.02 0.03 4113.00 0.00 282 0.02 0.02 4116.00 0.00 277 0.02 0.02 4119.00 0.00 273 0.02 0.02 4122.00 0.00 268 0.02 0.02 4125.00 0.00 264 0.02 0.02 4128.00 0.00 260 0.02 0.02 4131.00 0.00 255 0.02 0.02 4134.00 0.00 251 0.02 0.02 4137.00 0.00 247 0.02 0.02 4140.00 0.00 243 0.02 0.02 4143.00 0.00 238 0.02 0.02 4146.00 0.00 234 0.02 0.02 4149.00 0.00 230 0.02 0.02 4152.00 0.00 226 0.02 0.02 4155.00 0.00 222 0.02 0.02 4158.00 0.00 218 0.02 0.02 4161.00 0.00 214 0.02 0.02 4164.00 0.00 210 0.02 0.02 4167.00 0.00 206 0.02 0.02 4170.00 0.00 202 0.02 0.02 4173.00 0.00 198 0.02 0.02 4176.00 0.00 195 0.02 0.02 4179.00 0.00 191 0.02 0.02 4182.00 0.00 187 0.02 0.02 4185.00 0.00 183 0.02 0.02 4188.00 0.00 180 0.02 0.02 4191.00 0.00 176 0.01 0.02 4194.00 0.00 173 0.01 0.02 Page 19 of 21 4197.00 0.00 169 0.01 0.02 4200.00 0.00 165 0.01 0.02 4203.00 0.00 162 0.01 0.02 4206.00 0.00 158 0.01 0.02 4209.00 0.00 155 0.01 0.02 4212.00 0.00 152 0.01 0.02 4215.00 0.00 148 0.01 0.02 4218.00 0.00 145 0.01 0.02 4221.00 0.00 142 0.01 0.02 4224.00 0.00 138 0.01 0.02 4227.00 0.00 135 0.01 0.02 4230.00 0.00 132 0.01 0.02 4233.00 0.00 129 0.01 0.02 4236.00 0.00 126 0.01 0.02 4239.00 0.00 123 0.01 0.02 4242.00 0.00 120 0.01 0.02 4245.00 0.00 117 0.01 0.02 4248.00 0.00 114 0.01 0.02 4251.00 0.00 111 0.01 0.02 4254.00 0.00 108 0.01 0.02 4257.00 0.00 105 0.01 0.02 4260.00 0.00 102 0.01 0.02 4263.00 0.00 99 0.01 0.02 4266.00 0.00 97 0.01 0.02 4269.00 0.00 94 0.01 0.01 4272.00 0.00 91 0.01 0.01 4275.00 0.00 89 0.01 0.01 4278.00 0.00 86 0.01 0.01 4281.00 0.00 83 0.01 0.01 4284.00 0.00 81 0.01 0.01 4287.00 0.00 78 0.01 0.01 4290.00 0.00 76 0.01 0.01 4293.00 0.00 74 0.01 0.01 4296.00 0.00 71 0.01 0.01 4299.00 0.00 69 0.01 0.01 4302.00 0.00 67 0.01 0.01 4305.00 0.00 64 0.01 0.01 4308.00 0.00 62 0.01 0.01 4311.00 0.00 60 0.01 0.01 4314.00 0.00 58 0.01 0.01 4317.00 0.00 55 0.01 0.01 4320.00 0.00 53 0.00 0.01 4323.00 0.00 51 0.00 0.01 4326.00 0.00 49 0.00 0.01 4329.00 0.00 47 0.00 0.01 4332.00 0.00 45 0.00 0.01 4335.00 0.00 43 0.00 0.01 4338.00 0.00 42 0.00 0.01 4341.00 0.00 40 0.00 0.01 4344.00 0.00 38 0.00 0.01 4347.00 0.00 36 0.00 0.01 4350.00 0.00 35 0.00 0.01 4353.00 0.00 33 0.00 0.01 4356.00 0.00 31 0.00 0.01 4359.00 0.00 30 0.00 0.01 4362.00 0.00 28 0.00 0.01 4365.00 0.00 27 0.00 0.01 4368.00 0.00 25 0.00 0.01 4371.00 0.00 24 0.00 0.01 4374.00 0.00 22 0.00 0.01 4377.00 0.00 21 0.00 0.01 4380.00 0.00 20 0.00 0.01 4383.00 0.00 18 0.00 0.01 4386.00 0.00 17 0.00 0.01 4389.00 0.00 16 0.00 0.01 4392.00 0.00 15 0.00 0.01 4395.00 0.00 14 0.00 0.01 4398.00 0.00 12 0.00 0.01 4401.00 0.00 11 0.00 0.01 4404.00 0.00 10 0.00 0.01 4407.00 0.00 9 0.00 0.01 4410.00 0.00 9 0.00 0.00 4413.00 0.00 8 0.00 0.00 4416.00 0.00 7 0.00 0.00 4419.00 0.00 6 0.00 0.00 4422.00 0.00 5 0.00 0.00 4425.00 0.00 5 0.00 0.00 4428.00 0.00 4 0.00 0.00 Page 20 of 21 4431.00 0.00 3 0.00 0.00 0.00 4434.00 0.00 3 0.00 0.00 0.00 4437.00 0.00 2 0.00 0.00 0.00 4440.00 0.00 2 0.00 0.00 0.00 4443.00 0.00 1 0.00 0.00 0.00 4446.00 0.00 1 0.00 0.00 0.00 4449.00 0.00 1 0.00 0.00 0.00 4452.00 0.00 0 0.00 0.00 0.00 4455.00 0.00 0 0.00 0.00 0.00 4458.00 0.00 0 0.00 0.00 0.00 74.30 hours 3.1 days Pond drains completely dawn at time= 4458.00 min= 3.1 days Page 21 of 21 Solid Box Buoyancy Calculations Outlet Structure Bouyancy Calcs Riser Outlet Structure - Wet Pond Length Width I Depth I Volume ft^3 Weight Ibs Elev. of Riser Crest Top ofBox 247.00 feet(inside) And -Flotation: Outside Dimensions 5 5 4.50 112.50 16650 Length ofRiser 4 feet (inside) 112.50 cf Displaced AreaF Inside Dimensions 4 4 3.50 56 8288 Width of Riser = 4 feet (inside) 841.5 Gallons of Water displaced Total 56.51 8362 Weir Length = 16 feet 10530 lbs Buoyancy Force (Displaced * 62.4 * 1.50 xatety factor) Area of Riser— 16 sq.tt. 83621bs Weight ofC—rctc Box Assume Solid Box by Inv. of Riser= 243.00 feet 2168 lbs Anti -Flotation Required Oldcastle precast I Concrete Fill in Riser Height of Box = 4.50 feet 14.65 cf of Concrete Required. Minimum (B' wall thickness) Outlet Pipe Inv. Out= 243.00 feet Bottom of Riser = 240.50 feet Volume of Concrete in bottom of riser = 40.00 ft13 P:\200 ( Lee -Moore )\200.107 (Lee C—ty Industrial Pak)\Lot #g\Engineedng\Sloe ,aler\2023-01-03 Calcs\2022-01-03 PreCastB.NJeighls-Buoyancy.)ds 1 of 1 10:58 AM on 2/23/2023 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wet Pond Outlet Channel Trapezoidal Bottom Width (ft) = 6.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 242.50 Slope (%) = 1.00 N-Value = 0.078 Calculations Compute by: Known Q Known Q (cfs) = 6.38 Elev (ft) Section Thursday, Feb 23 2023 Highlighted Depth (ft) = 0.68 Q (cfs) = 6.380 Area (sqft) = 5.00 Velocity (ft/s) = 1.27 Wetted Perim (ft) = 9.04 Crit Depth, Yc (ft) = 0.32 Top Width (ft) = 8.72 EGL (ft) = 0.71 Depth (ft) 245.00 244.50 2.50 244.00 243.50 2.00 1.50 1.00 243.00 242.50 ')A') nn 0.50 0.00 0 50 0 2 4 6 8 Reach (ft) 10 12 14 16 APPENDIX E PRECIPITATION DATA NOAA Atlas 14, Volume 2, Version 3 A" Location name: Sanford, North Carolina, USA , Latitude: 35.5578°, Longitude:-79.1583° Elevation: 237.42 ft** source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.425 0.502 0.582 0.639 0.704 0.748 0.788 0.823 0.863 0.892 (0.388-0.467) (0.458-0.552) (0.530-0.640) (0.582-0.702) (0.638-0.772) (0.675-0.820) (0.708-0.864) (0.735-0.903) (0.764-0.946) (0.783-0.978) 10-min 0.678 0.802 0.932 1.02 1.12 1.19 1.25 1.31 1.37 1.40 (0.619-0.746) (0.733-0.883) (0.849-1.02) (0.930-1.12) 1 (1.02-1.23) 1 (1.08-1.31) 1 (1.12-1.37) 1 (1.17-1.43) 1 (1.21-1.50) 1 (1.23-1.54) 15-min 0.848 1.01 1.18 1.29 1.42 1.51 1.58 1.65 1.72 1.76 (0.774-0.932) (0.921-1.11) 1 (1.07-1.30) 1 (1.18-1.42) 1 (1.29-1.56) 1 (1.42-1.74) 11 (1.47-1.81) 1 (1.52-1.88) (1.55-1.93) 30-min 1.16 1.39 1.68 1.87 2.11 F 2.43 2.56 2.73 2.85 (1.06-1.28) 11 (1.27-1.53) 1 (1.53-1.84) 1 (1.71-2.06) 1 (1.91-2.31) 1 (2.18-2.66) 1 (2.29-2.81) 1 (2.42-3.00) 1 (2.51-3.13) 60-min 1.45 1.75 2.15 2.44 2.81 3.08 3.34 3.---IF-3.92 4.17 (1.32-1.59) 1 (1.60-1.92) 1 (1.96-2.36) (2.22-2.6� l (2.54-3.08) 1 (2.78-3.37) 1 (3.00-3.66) 11 (3.21-3.94) 1 (3.47-4.30) (3.66-4.57) 2-hr 1.71 2.07 2.58 2.95 3.44 3.81 4.18 4.54 5.01 5.38 (1.55-1.90) (1.88-2.30) (2.33-2.86) (2.67-3.27) (3.09-3.80) 1 (3.41-4.21) 1 (3.71-4.62) 11 (4.00-5.02) 1 (4.38-5.54) (4.66-5.95) 3-hr 1 1.81 2.20 2.74 3.17 3.73 4.17 5.0 4.61 6 5.68 6.16 ( .65-2.01) (2.00-2.44) (2.49-3.04) (2.87-3.50) (3.35-4.12) (3.72-4.60) (4.09-5.09) (4.45-5.59) (4.94-6.27) 1 (5.30-6.81) 6-hr 2.17 2.63 3.28 3.80 4.49 5.04 5.61 6.19 6.99 7.62 (1.98-2.40) (2.40-2.90) (2.99-3.62) (3.45-4.17) (4.05-4.93) (4.52-5.53) (4.98-6.14) (5.44-6.77) (6.06-7.64) 1 (6.54-8.34) 12-hr 2.57 3.11 3.91 4.55 5.42 6.13 6.87 7.64 8.73 9.60 (2.35-2.84) (2.84-3.44) (3.56-4.31) (4.12-5.01) (4.88-5.95) (5.48-6.71) (6.07-7.51) (6.68-8.35) (7.51-9.54) 1 (8.14-10.5) 24-hr 2.99 3.61 4.53 5.26 6.25 7.03 7.84 F 8.67 F 9.81 10.7 (2.79-3.21) (3.37-3.88) (4.23-4.87) (4.89-5.65) (5.80-6.71) (6.51-7.55) (7.24-8.41) (7.98-9.30) 1 (8.99-10.5) (9.78-11.5) 11.1 12.1 2-day 3.48 4.19 5.23 6.04 7.15 8.02 8.92 9.84 ) FL1 (3.24-3.74) (3.91-4.51) (4.87-5.62) (5.62-6.49) (6.62-7.67) (7.41-8.61) (8.22-9.57) (9.04-10.6 0.2-11.9) (11.0-13.0) 3-day 3.69 4.43 5.50 6.34 7.49 8.40 9.-32-T 10.3 F 11.6 F 12.6 (3.44-3.95) 1 (4.14-4.75) 1 (5.13-5.90) 1 (5.90-6.79) 1 (6.94-8.02) 1 (7.75-8.99) 1 (8.59-9.99) 1 (9.44-11.0) (10.6-12.5) 1 (11.5-13.6) 4-day 3.90 4.68 5.77 6.64 7.83 8.77 9.73 10.7 12.1 13.2 (3.64-4.17) 1 (4.37-5.00) 1 (5.38-6.17) 1 (6.18-7.10) 11 (7.25-8.38) 1 (8.09-9.38) (8.96-10.4) 1 (9.85-11.5) (11.0-13.0) (12.0-14.1) 7-day 4.48 5.35 6.52 7.45 8.73 9.74 10.8 11.9 13.3 14.5 (4.20-4.79) 1 (5.01-5.72) 1 (6.09-6.96) 1 (6.95-7.95) 1 (8.12-9.31) 1 (9.04-10.4) (9.98-11.5) 1 (10.9-12.7) (12.2-14.3) (13.3-15.5) -day 5.11 6.09 7.32 8.28 9.58 10.6 11.6 12.7 14.1 15.2 Fo1 (4.81-5.45) 1 (5.72-6.48) 1 (6.87-7.79) 1 (7.77-8.82) 1 (8.96-10.2) 1 (9.89-11.3) 1 (10.8-12.4) 1 (11.8-13.5) (13.0-15.1) 1 (14.0-16.3) 20-day 6.88 8.12 9.59 10.8 12.3 13.6 14.8 16.0 17.7 19.1 (6.48-7.31) (7.65-8.62) (9.02-10.2) 1 (10.1-11.4) 1 (11.5-13.1) 1 (12.7-14.4) (13.8-15.7) (14.9-17.1) (16.4-18.9) (17.6-20.3) 30-day 8.54 10.1 11.7 13.0 14.6 15.9 17.2 18.5 20.2 21.5 (8.07-9.06) (9.48-10.7) (11.0-12.4) (12.2-13.8) (13.8-15.5) (14.9-16.9) (16.1-18.3) (17.3-19.7) (18.8-21.5) (19.9-22.9) [45-day 10.9 12.8 14.6 16.0 17.8 19.2 20.6 21.9 23.7 25.0 (10.3-11.5) (12.1-13.5) (13.8-15.4) (15.1-16.9) (16.8-18.8) (18.1-20.3) (19.4-21.7) (20.6-23.1) 1 (23.3-26.5) �-day 13.0 15.2 17.2 18.7 20.7 22.2 23.6 25.0 26.8 28.2 (124-13.7) (14.4-16.0) (16.3-18.1) (17.7-19.7) (19.6-21.8) (21.0-23.3) (22.3-24.9) (23.6-26.4) (25.2-28.3) (26.4-29.8) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PIMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based depth -duration -frequency (DDF) curves Latitude: 35.557B°, Longitude:-79-15830 30 25 5 0 L L L L L ry ry �4 N �4 r4 � N� O O O N A4� H A V 4 r� O O O U' O i r I m [a ry rn v n Duration 30 25 5 ------------------- ------------------------------.-......--------- 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created {GMTY Wed Jun 14 15:07:06 2020 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — 76-min — 3-day 15-min — 4-day — 30�-min — 7-day — 60-min — 10�-bay — 2-nr — 20-day — 3-hr — 30-day — 6-hr — 45-tlay — 12-hr — 6o-eay — 24-hr Lar a scale terrain Winston-Salem �' � �' � * . Durham Greensboro • Rocky Mount Raleigh NORTH CAR0LINTF Green Charlotte Fayetteville. (, k so i 100km 60mi Jdilmingd:•n Orr; law .. Brry Large scale map Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer NOAA Atlas 14, Volume 2, Version 3 A"- kl Location name: Sanford, North Carolina, USA , Latitude: 35.5578°, Longitude:-79.1583° Elevation: 237.42 ft** source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular 11 PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)' 11 Average recurrence interval (years) Duration 00 5 5-min 5.10 6.02 6.98 (4.66-5.60) (5.50-6.62) (6.36-7.68) 11 10-min 4.07 4.81 5.59 6.13 6.73 7.15 7.52 7.83 8.19 8.42 (3.71-4.48) (4.40-5.30) (5.09-6.15) (5.58-6.74) (6.10-7.39) (6.45-7.84) (6.74-8.24) (6.99-8.59) (7.25-8.98) (7.40-9.25) 10 11 25 50 100 200 500 1000 7.67 8.45 8.98 9.46 9.88 10.4 10.7 (6.98-8.42) (7.66-9.26) (8.10-9.84) (8.50-10.4) (8.82-10.8) (9.17-11.4) (9.40-11.7) 3.39 4.04 4.72 15-min (3.10-3.73) (3.68-4.44) (4.30-5.19) 2.32 2.79 3.35 30-min (2.12-2.56) (2.54-3.07) (3.05-3.68) 5.17 11 5.69 6.03 6.34 6.58 6.87 7.05 (4.71-5.68) (5.15-6.24) (5.45-6.61) (5.68-6.94) (5.88-7.22) (6.08-7.53) (6.19-7.74) 3.75 4.21 4.54 4.85 5.13 5.47 5.71 (3.41-4.11) (3.82-4.62) (4.35-5.31) (4.58-5.62) (4.84-5.99) (5.01-6.26) 60-min 1.45 1.75 2.15 2.44 2.81 3.08 3.34 3.59 3.92 4.17 (1.32-1.59) (1.60-1.92) (1.96-2.36) (2.22-2.6� (2.54-3.08) (2.78-3.37) (3.00-3.66) � (3.21-3.94) (3.47-4.30) (3.66-4.57) 2-hr 0.854 1.03 1.29 1.48 1.72 1.91 2.09 2.27 2.51 2.69 (0.776-0.948) (0.940-1.15) (1.17-1.43) (1.33-1.63) (1.54-1.90) (1.70-2.11) (1.85-2.31) (2.00-2.51) (2.19-2.77) (2.33-2.98) 3-hr 0.604 0.732 0.914 1.05 1.24 1.39 1.54 1.69 1.89 2.05 (0.549-0.670) (0.666-0.812) (0.830-1.01) (0.955-1.17) (1.12-1.37) (1.24-1.53) (1.36-1.70) (1.48-1.86) (1.64-2.09) (1.77-2.27) 6-hr 0.363 0.438 0.548 0.634 0.750 0.842 0.936 1.03 1.17 1.27 (0.331-0.400) (0.401-0.484) (0.500-0.604) (0.576-0.697) (0.677-0.822) (0.754-0.923) (0.832-1.02) (0.909-1.13) (1.09-1.39) 12-hr 0.213 0.258 0.324 0.377 0.450 0.509 0.570 0.634 0.724 0.797 (0.195-0.235) (0.236-0.285) (0.296-0.358) (0.342-0.416) (0.405-0.494) (0.454-0.557) (0.504-0.623) (0.555-0.693) (0.623-0.792) (0.675-0.871) 24-hr 0.125 0.150 0.189 0.219 0.260 0.293 0.327 0.361 0.409 0.446 (0.116-0.134) (0.140-0.162) (0.176-0.203) (0.204-0.235) (0.241-0.280) (0.271-0.314) (0.301-0.350) (0.333-0.388) (0.375-0.439) (0.408-0.480) 2-day 0.072 0.087 0.109 0.126 0.149 0.167 0.186 0.205 0.231 0.252 (0.068-0.078) (0.081-0.094) ( 0.101-0.117) (0.117-0.135) (0.138-0.160) (0.154-0.179) (0.171-0.199) (0.188-0.220) (0.212-0.249) ( 0.230-0.271) 3-day 0.051 0.062 0.076 0.088 IF (0.048-0.055) (0.057-0.066) (0.071-0.082) (0.082-0.094) 4-day 0.041 0.049 0.060 0.069 (0.038-0.043) (0.045-0.052) (0.056-0.064) (0.064-0.074) 0.104 F 0.117 0.130 0.143 0.161 0.175 (0.096-0.111) (0.108-0.125) (0.119-0.139) (0.131-0.153) (0.147-0.173) (0.160-0.189) 0.082 0.091 0.101 0.112 0.126 0.137 (0.075-0.087) (0.084-0.098) (0.093-0.109) ( 0.103-0.120) (0.115-0.135) (0.125-0.147)F 7-day 0.027 0.032 0.039 0.044 0.052 � 0.058 0.064 0.071 ) 0.079 0.086 (0.025-0.029) (0.030-0.034) (0.036-0.041) (0.041-0.047) (0.048-0.055) (0.054-0.062) (0.059-0.069) (0.065-0.075 (0.073-0.085) (0.079-0.092) 10-day 0.021 0.025 0.030 0.035 0.040 0.044 0.049 0.053 0.059 0.063 (0.020-0.023) (0.024-0.027) (0.029-0.032) (0.032-0.037) (0.037-0.043) (0.041-0.047) (0.045-0.052) (0.049-0.056) (0.054-0.063) (0.058-0.068) 20-day 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.033 0.037 0.040 (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.030) (0.029-0.033) (0.031-0.036) (0.034-0.039) (0.037-0.042) �-d:a:y]F 0.012 0.014 0.016 (0.011-0.013) (0.013-0.015) (0.015-0.017) [457day 0.010 0.012 0.014 (0.010-0.011) (0.011-0.012) (0.013-0.014) 0.018 0.020 0.022 0.024 0.026 0.028 0.030 (0.017-0.019) (0.019-0.022) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.028-0.032) 0.015 0.017 0.018 0.019 0.020 0.022 0.023 (0.014-0.016) (0.016-0.017) (0.017-0.019) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.022-0.025) 60-day 0.009 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.019 0.020 (0.009-0.010) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.018-0.021) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). umbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a ven duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not iecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PIMP values. refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.55781, Longitude:-79.15830 100.000 L L L L L ry ry �4 N �4 r4 � N� O O O N A4� H A V 4 � O O O U' O -I H m [aH ry rn v Ln Duration 100.000 t 10.000 C ZI C 1.000 C e 0.100 a 0.010 0 001 i I I I I I I I I i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created {GMTY Wed Jun 1D 15:09:41 2020 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) —1 2 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — 76-min — 3-day I5-min — 4-day — 30�-min — 7-day — 60-min — 10-bay — 2-nr — 20-day — 3-hr — 34-day — 6-hr — 45-day — 12-hr — 6o-eay — 24-hr Lar a scale terrain Winston-Salem �' � �' � * . Durham Greensboro • Rocky Mount Raleigh NORTH CAR0LINTF Green Charlotte Fayetteville. (, k so i 100km 60mi Jdilmingd:•n Orr; law .. Brry Large scale map Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer APPENDIX F DRAINAGE AREA MAPS \ \ II II I I I I I I I I \ I \\ IIII I I j I I 1 II I I II I •I I I S I 1 I , I I I 1 1 / 111 I I I / ,IIIII I�,I!Il � I 1 jlll IIII I I I I$I / !I Il 1IIIII III IIIII; j / IIII I I IIII I IIII 1 I I /' I I r I II j I l I It¢ � 'IIII IIII �-- / 4 � I I �—m—.P�.P • o� _,o _�o;��o —�_! � —� —� �_�— —�—�—�=�_°�.� �—= —� —��F— � �°�—� �—�°��°�.� 1 1 °�1�— I `k I�oL�I���� 1 \ � I . • f , • I. • . • .1. I I I I 1 �/`. F. �\\ \ � / •.\.: '•T •. � 1. .I• �1 I I I I I I� � I I/• .. • ; . • ; . • , . ✓>y • . ; :: ; .. • • / ' • • . \ \ � I • � • f . • • . • . • • \��/. • ' . • I . • ; .I• ; .I.. •I • •1 I II I I I I I I I I I I I .i. l'.r./•'.• .• ,..:;::�.'' ./ .. •./. •: ,\•. •: .:•. •: '.•' •. :_„-•-•:•':•';•---:.�::;:;/:•:l;:F:ll• i I I I i I II I IIII I I I/'/ '. •/.•,.•.',.'....i!. .. .�'.•��;•;.'�� _— — �•\�^ �%/.;•J/; I I I I I I III I II ' — I -- / I I I I I I (• %%. i . � �� '� i •� '�. \ : � �Y" �" ice• / l l I I / I eh : � ., ,/ �ti •'/ / III / °/ II/! ;7(• ;ice! f1 . 'f ;%f.r ; �,-/' ��' ----- -- -- --- /' / � � /� ///l /�J/ / — — / e0l' /' .I• ,I• .I' •% /ice/ ,� "!' �'� .i' i. "./� ��' ���___ '�, • I �I.. 11♦ •/� iy .T— �! ate' ./%y .i�f / ./'`� �'ii' \���� s�/' ,ij // / /' // /' / �,. ,� •/ 1. ::/�. / ,%i. �✓ � �. '<' '• � \ � s i/ / / / /.� . �I: �1.' �; � :'/: / ,/' :/i��• •F,. :!%�. .yet' ;.��' ;�' �•i'•-'i'� \ \���— �'/i'/ / / // / I, i •"I:•' 'h-"'•'.r :•.''• ":ir• •' ''' .'� � ,�' TSB#2. ..�.. �or� AAA ' � / . '' •// " ./' "-r` . ' �• ' •yam \ i.� 9 � � , � %J�' / Ar 10 / I �Il ll 11 fll \ a /•'y• / L i ':•'y•�. / � �`� '`• •'' / ' J''�, / ' / / � / II 3I ' II e 4 •✓:•/•':•/�:•7.�r'�•',�' y(, i. ::�i'• .'% .:;iy• :♦, �'�� ��i'�•' �� /' / ��'(�Yr �' '' IIIII I t / � / � � ; / • /• ' r .r ' ' /, ' � . ' J • •/ i / . // / � / / ,I SSMHA7 r \ ♦ / I I I It I �--___—' � i. .�` ', i ;� /' � ✓ / �e � INVIN. 231.71 000\ / I i / / (TAKEN FR01. ''�, c •./ / I I I I �111 �:.� — ''• : %' • iY, ; ,,ice \ . ; / / / ♦ J // / DATED C.00- • I :' 1100-YEAR ,' 4/ ,.. ItLOODPLAIN • yY TSB#1 DRAINAGE AREA ----1� • '� j y: yyy%' :\.I\ TSB #1 F _ I /s j� i� / • y•• \\ '/ DISTURBED AREA (C = 0.50) ��� 'v v / / /s ����/ ' y•� �� AREA = 184,003 SF = 4.22 AC _ , — — / s/ �J 'y•- UNDISTURBED WOODED AREA (C = 0.15) �I / `� / ��� ° ♦y' AREA = 15,288 SF = 0.35 AC ' i /''i� /i ° /♦y• TSB#1 DRAINAGE AREA i 0100 DISTURBED AREA (C = 0.50) — / �I— / , �,/ �r.. — ('' / ♦•°�/ /' % ►r AREA=157,085SF=3.61AC .� L� /ii/� ;���/ i�•.y✓.`/ /I 1 •♦� ��"�_ =-1 =':a —tea—�6�.�� �► ��,i �>.♦ ,� ' / 1 Rv/M'14 3SCALE: 1=80' 00R lN�1777o / A( r�FL00PLAINIt /l "l l � �.. 1 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 Z ' v+ Lu r F- � as Z F.. D Lu J J Q 1 LL O W z a Q zz W O 9 CU Z o V O U) w W 02/19/2021 NORTH \ \\ :- .' \ \ \ \ I I I I I I I lI I 1 I II �I � I Ifs •I I c� I 11 II iIII I i I I it li//'91 / , IIII II / l ll 11 IIIII III IIIII � j {� le // / � j / 1 jlll IIB I l l I• l� I l I I /'' �% -- //'�—�— / --- !'/ / / III I I I IIII j III Id � 1 1 � TDD #1 lot DA=0.32P li)li II ,/ IIII //// %� //,/// —,� � ,/./ \ �, �■.�` gym` , 8 1 I I I \ �` //•;: ;: :: : : L. .. .' •' `\ —� i'`• :. :I: '� 1: II II II I II I I I I I I I I I —\_------� � ;�• r .r I I I I i I I i IIII � �: :/ .•l:.i I I I I �I '`: :: :: ; ,-------- ----- TDD #4 --- — -- — — — -- --- ;/, i. ----- TDD #2 ` DA = 1.67 AC. DATDD 2 AC. ! , r-. � .' .'.I.. �,. � .%.' �•': : ���� ��.i' \ err / / � �� / r r / \ \ \ / i _ /_/ —fir ♦�or 00 100-YEARINV r E�SSMHA7 ` ♦ / IM. 24190 INVIN.23171 INV OUT. 23162 (7AKEN1101^4Sl •�•- � DATED 0, • 00- i +/ 1'00-YEAR,' �.•� \ �LOODPLAIIN I 10-00/04•� / 80' 0 80' 160' SCALE: 1" = 80' 1 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 W U a LLI H U CD Z H W J O IQ 1 LL O W z �Q a U) Zz W O� U Zo C� o ) w W 02/19/2021 NORTH IIII � II� •� j' �\ / �� �� \ �\ � / 7 `�� \ 1 I I I I I I I I ~I'V \ — IRJ I I I I I 1 / III • f ' • �✓' . cp • � �; , . ^ ./• ; � •- . c \ 11 1 I 1 � I I I I I I � I) \ \) 261' 'fI LoLo 11 I II I / 258 r o N I I /.� o ,� ;�'o �', ��,.;,I•; II II I I N II ILo I L �j1 I I I I I II# i �' :�'.�' o• •. •, •I �' •�. •, - -/• •: N � / I I I I I I I I I I N I j 1 25i 257 257 2 25T 25 j 11j I I I I 1 11 � i •Lr .y - --- --- ---\-- ----- --- ---- '�'�.'�% •/ I j I � j � I I I I I II I I I IIII III 11,1 I I II •I, .J •�: f, Y _ _ jrt• I I I h i l l � � I I I I IIII III I � I I � .�: ; •/!. ,,t, •�g; • ; ��. �: �;\ ' : � • r;%. ; -� I l l j 1 � � I I I I 1\ I I IIII I I IQ� I I .i•,J• �`�•:,� �-:IJ•' './• __ �\• I / / / I I I I \ I IIII III �I. I !I .I• !. �%� - it �� _ �- - __1-- - _ _\`, �. y✓' / / / / I I I I 1 I 1 ` I IIII I �I � I i1 y� ;� ! - � _ _ _ - _ - .\ `•T\; : ; _ %• -� / / / , I I 1 1 I I I \I IIII I I �A I I 1 . _ /' • � ,-, - __ ' :�' �'--' • :/ �/ / / / / 1 1 I I III w , 13, 1/4 III �I = I III 111• � ' ' ' r -- '- -.' / / / I 1 � 1 III I I � � � 4 I I ! I , ,. • j/: - -- :; ,' : �i � ' - -- - - • %� — � � / ' / / / I I 1 I alb '�' II Iil• i. IL - I u • i 55 lilt 11 it 255 / j l I 111 I I I_II I,` j %. •f •FFh- 258.0D ; �✓~ '� - -- �//�� 1�111� 1�1 � III I•.f�• 'I• .7,.�, •� '�.�{/• •,i'�' �T'� � `- - - - - - �' � / I /I ��/ % // II I1 I I � 1 .�•' •:J .��'' `t• •.�•' •�. 'l.' '✓• a� �- '�._:i:T�;i� `Z�J� / / // / / II I � I �\ �� I l; 'I. �' •6 •I ,�� �r �, ✓/• � i; � � .% �"" _ -- -� 'rr'- _-- -_ -_ -� it �� ////i // / ///// IIII I / II 'i: � 1 ' ;� ,;l ' :�� . ' i • ,/• �; i. ' !• : • ;' %. �'r � --- — _ // ��/ i/ 04' / /// / /// II II I I � t 'I• .I• '�1 '� r �`��255; •! -- •i. •�!' • ',:�`• ��` y -- --y,-- — -- --- / -'/.4f / /%//j/ // 11 I O � I � � I I l . I• 'I• 1 . , 1 ' ;/. • r✓ram : • '/. •> : j . : •„ � • ' ' ✓''� ' : • � � // / // / / // .00 1 / / ' I I I I ' \ • f �' l; ; � . is • ,' ; �; •%• • ;%t �- ;� ;' • ; f'-' � �;� / //// // / �,i I I 1 , . i' :i?; • ,i' i '� /� /' •may y �� ' i' / / / •I ✓ 1 ICl/ II �1 I ' •ii,••. •,•'. •''. • •`'� :F.. '„> � � �': / - ° �� / 6 I ✓• 1 1 ..... . . . . . . . . . . . . ... I ✓ I v_ I � v 1 6 %G` > 1 / /III ' r •O '''!' ... '....�c'c'c.1...: .::�i.--TF . �: ~=:;.r=::''-;_:y _ _ '' -> -� •/ • i4000 EXSSMHA7 T I �. .. ..... .... .. 1. .. .. .. r:�:.:. � I I / / I I I � _ - .. • � �v �( RIM. 241.83 I • • _ / III N , Q _ � � •/ . / . (. • ... / / I! / / lNVlN231.60 � il;1i u � I: ti55 �-255_ /' �- •' ;,• - ,�;. ���,� / // ♦ I 2 // / // � ,'/ 90O-YEAR /'���'• - r 240L N // // // /s / FLOODPLAIN ..1 TRB #1 DRAINAGE AREA - STAGE 2 DISTURBED AREA (C = 0.50) AREA = 391,118 SF = 9.06 AC 80' 0 80, 160' SCALE: 1" = 80' i TRB #1� 3� , 2�� �� �; ` �N1 .•0000'.00' ,.40 p / y", y•� // w - - - : r s. .�� T ` EXSSMHA£` ' ,�"� ��,�,♦ / '� ••�� 100- ./ RIM24j* •�, � 1 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 Z ' v+ m N a Lu (' U Q O z �w J I J Q 1 LL OO W a�Q�//� z_ W VJ O V CU Z D V 0 U) w W 01 /03/2023 NORTH CCEP LOT #9 -PRE DEVELOPED FLOW -ANALYSIS POINT A IMPERVIOUS AREA -HSGB (C = 0.95, CN = 98) `\\\ � � �� � � 1\ rr� ,�/ / �• � \ �\ \ \ \\ 1\ \ � — //�� -, ��-�; AREA = 7,917 SF = 0.18AC \ ~ p _/ / / r/ ! \ �� -3., OPEN SPACE - FAIR CONDITION - HSG B + + + °\° �\\ \ \ \ \`\-- ` i (C = 0.15, CN = 69) + + + AREA = 73,399 SF = 1.69 AC + + + + + I \ •�� WOODS - FAIR CONDITION - HSG B + + �' + + + + + + \ y �, ti46��. 1 — — `\\ (C = 0.15, CN = 60) �;���� � \\`. AREA =575,701SF= 13.22AC TOTAL AREA=657,017 SF=15.08 AC t +�—F— t t �-- t + t + t / ���\_ �G—__-,/ • —ice\ —__`\\ \\ + +i' + + + + + + + + + t + .. + + + + + \ \ \ \\\\ \\ \\ \\ �1 T NSF +,'+ + +' + + + + + + t��+.—t + t`\t —/ \ / / �•: ���\\\\ \� \\\\ \\\ \1\ / Nv� g4cTFq/?k J� " vp + /+ + if + + + + + + + + + + + + ... t 6 S, + -� +i'+ + + + + + + + �+ + + + + + +`\+ + + ' �\ P7 4g9 +/ +/l + + + / '+ �— h— + + + + + —� + + + + + + \+ + \ V \ \\ ��� I I I I \I 1 \I Pc1p"p!6 ,, /4/ + /+ + + t + t + t + t + ._ + + + + ,+ + + �\ + +\ + + + gREtNiNG6Jga 63 \ + l + /+ /+ + . \\+ \+ + + + + + + +__+ + -+ -�+ ` \+ + '9 �•qCmi. +/Tl '°SOg> t t qt + t+ +\+ + + /+ + + + + +` / \ �0140 Rl ?poT4CT'NS9NF000pOrF F ""✓--c 3+ + + +( + + +_*—+\ + + ` + \+ / /++++ t/+ -v + `\v t + i\4i + t t + + t+ t\ +\ t\\+ t + - - v +-- + +'+/ {y +,+ + + + +,*-- + + + + + + + +'�-_+ ± +\+-� + _ v / T R r \ \ / \+ + + / / / eT 1qp NOF sj / + , # + / t/'+ + ... t + t + t +— + t t t t�i� t 46pp 9PG I / / \ / , ) 1 0g TH 9p0�p t, + . + t + t +/ -1-- + + + + + + + + —+ + \t\ + i•� + t� + t / l/ l/ / pG•g OF "WgNC - LOT #9 _ _ + + + + + + '+ + PRE -DEVELOPED ) + + + +, +—�F\ + + + ± '+ /+ + t��F� t +��t t_ t— +—t_#--t— + t + + + + —+--� t +--+\ t`\ t�\+� + �+� + /+ O + +\+ +'+ + + + + + + + + + +.' D.A.-A +-+ + ����� \+ \+`� + + �+% r• �� c�000y + �t + + + + + + + +—+— + + + + +' + + + + i �+ + +_-+---�_f_+\+ \+ \+ + 4— + + +_—---k\+ + + + + + _+' + + t t + + + �� + + + +` + \t /� 4-' + + + + + + + + + + i-K + +� �� + + + ��` ^ 'E' e — — -' i+' + + + + t t + t + t + ... t + t + +_-4 t +' t + +� + �-� �� '#� t _tom �+ t^,t,�+ + + + + .4- + + + + + + + + + + _ -,,. fi%I +,.'� + .-+ e, t tF�C9Ir + + + + 'C'o' + + + + -Ft + + + + + + + + + + + + + + + +S� 5_'E+ ++ + + / - + + + + +,� + + + + + 1 7 95' + + ­+ + + + +� + + + + + + i + +\+ 4 + + + + + + + + + + �� -+ t ANALYSIS �1 \+ ` ��=t+++++ +++ +++ +/+ ++ cFNrFR Np POINT s + + + +�+—+_ i�_ +/+ + + P' T SF / P C3P 4 9 �` ` ' / ol lopO c,g 6? + 'ilPNill 6*4 / ♦, / 4 120' 0 120' 240' SCALE: 1" = 120' � 1 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 yy� a ~" as z O w J >Q O > LV Lu Z Q Q W Z W a �L) o V 01 /12/2023 NORTH CCEP LOT #9 - POST DEVELOPED FLOW (WET POND) CCEP LOT #9 - POST DEVELOPED FLOW (BYPASS A) IMPERVIOUS AREA- HSG B IMPERVIOUS AREA- HSG B (C = 0.95, CN = 98) (C = 0.95, CN = 98) NCO AREA = 260,574 SF = 5.98 AC AREA = 10,200 SF = 0.23 AC — 275 \ ✓ / \ \ \\ \\ \, / I 255 - - - - - _ _ OPEN SPACE - FAIR CONDITION - HSG B OPEN SPACE - FAIR CONDITION - HSG B (C = 0.15, CN = 69) (C = 0.15, CN = 69) AREA = 67,858 SF = 1.56 AC AREA = 134,128 SF = 3.08 AC TOTAL AREA = 394,702 SF = 9.06 AC WOODS - FAIR CONDITION - HSG B 0,i (C = 0.15, CN = 60) AREA = 199,610 SF = 4.58 AC TOTAL AREA = 277,668 SF = 6.37 AC ..-.-. 6tS I......'.4."f.".... ...............`. ............ ... .. \ .,. R _.T.; fr= .... . . _ ...`� ........... ..' { \ 81 P �zs Zo _ VM I 2 Pq sZ / �5�.'.^...�..... .............................. �.. ...... / c a ................. \ T N. - 250LOT #9 POND \.. \ ` l ...........;, POST -DEVELOPED D.A. \ / C / , I / I r, ................ \...... s ......... ,.................... n-- - .�... ..,�.. / ,yy \ , I I j�/`/ //// .. /:..::;,..;;::``:>.::::s::',✓:;:�.!. ... f ... ..�. ... > ... - - ... . ..... \ \ - , / / T (O RTj / f \ +� / / @f o c 4C / + + + + + + + + �t*! +,�,.•' ANALYSIS + + + + + + �' + �► + + + + + + / - + + '+ - + _t_±_ t__ BYPASS �' + + ��+ + < + + + + + + + /i i / \ - +'yi/ �� t, + + ±�+ + POST -DEVELOPED + + +��H + + /+ + + + + + + �Cr; POINT A _'oo/ + + w �•�"'�'� \ + + + + + * +,,�+ D.A. - A + +F + + + * + + �� ram. + v -+ +,+ +,�1 ± + + _+1 + + + + 5 4"E +S� �.� � / - _-.. ..__- ��•�_�� / �� moo \� \+ + +'+ + + + + + + + + + + + 120' 0 120' 240' % �'� + t + � -I. + +,4—+_ � +/ + + + + + + iv + + + +V + + + of �,.. ' P a°9 oe + + + + + + + + + + + + PC PCZApV. �p 8s SCALE: 1" = 120' i/ + + +,--�1+ + + PC,1Bp�� B�� f" 1 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 a 0 Q U a Oz 0w _I w > Q ' O W W z �a aC/) Cl)z W a� C� o C) 01 /12/2023 NORTH