HomeMy WebLinkAbout2023-02-23 Lot 9 Wet Pond SupplementSUPPLEMENT-EZ COVER PAGE
FORMS LOADED 71
PROJECT INFORMATION
1
Project Name
CCEP - Lot #9
2
Project Area ac
18.57
3
Coastal Wetland Area ac
0
4
Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
25
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER
AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
1Sand Filter
0
17
lRainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
iSilva Cell
0
25
Bayfilter
0
26
IFilterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Jacob Hudson PE - Project Engineer
28
Organization:
CE Group, Inc.
29
Street address:
301 Glenwood Avenue Suite 220
30
City, State, Zip:
Phone numbers :
Email:
Raleigh, NC 27603
31
919 367-8790 ext. 110
32
Jacob@CEGroupinc.com
Certification Statement.
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is. to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications. operation and maintenance agreements and other supporting information are consistent with the information provided here
Designer
\\��I►Illfriiii
CARO
o
%
o..oFE
2. a SEAL
050755 =
08
Z7��„ ► I f I, `���
Sea
Signatur of signer
Date
02 - 2 3 - 2d23
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
394702
394702
6
Onsite drainage area (sq ft
394702
394702
7
Offsite drainage area (sq ft
8
Total BUA in project (sq ft
260547 sf
260547 sf
9
New BUA on subdivided lots (subject to permitting)
(scl ft
10permitting)
New BUA not on subdivided lots (subject to
s
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
16230 sf
16230 sf
- Sidewalk (sq ft
1915 sf
1915 sf
Roof (sq ft
117185 sf
117185 sf
- Roadway s ft
11180 sf
11180 sf
- Future (sq ft
57753 sf
57753 sf
- Other, please specify in the comment box
below (sq ft
56284 sf
56284 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
32%
66%
19
Desi n storm inches
1.0 in
20 1
Design volume of SCM cu ft
21186 cf
21 lCalculation
method for design volume I
Simple
IPlease use this space to provide any additional information about the
22 1drainage area(s):
-oadinq Dock Area and Gravel Fire Access Drive
WET PON D
1
Drainage area number
1
21
Minimum required treatment volume cu ft
21186 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
NIA
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
PO
18
DMQC FROM
Sizing method used SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
237.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
238.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
243.00
23
Elevation of the permanent pool fmsl)
243.50
24
Elevation of the top of the vegetated shelf (fmsl)
244.00
25
Elevation of the temporary pool (fmsl)
245,50
26
Surface area of the main permanent pool (square feet)
11175
27
Volume of the main permanent pool cubic feet)
35574 cf
28
jAverage depth of the main pool (feet)
3.18 ft
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
5789 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
12 in
351
Design volume of SCM (cu ft)
33119 cf
36
Is the outlet an orifice or a weir?
Weir
37
If orifice, orifice diameter (inches)
38
If weir, weir height (inches)
6 in
39
If weir, weir length (inches)
48 in
40
Drawdown time for the temporary pool (days)
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
42 in
44
Dept of forebay at exit (inches)
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
_
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL INFORMATION IV
a
55
Please use this space to provide any additional information about the
wet pond(s):
4:31 PM 2/23/2023