Loading...
HomeMy WebLinkAboutNC0020290_SOC_QuarterlyReport_20230412Russell Fox Mayor Heather Hockaday Town Manager/Attorney Chad Fox Town Clerk Tobin of �Burnzbfrie Town of Burnsville Public Works Department SOC Quarterly Report For January 2023-March, 2023 Mr. Landon Davidson, P. G. Regional Office Supervisor Surface Water Protection Section North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Councilors: Judy Buchanan Denise Collier Randy 011is Bill Wheeler 2 3C,311� APR 12 2023 Water Quality Regional Operations Asheville Regional Office SUBJECT: Environmental Management Commission Settlement Agreement Quarterly Status Report Town of Burnsville Collection System NPDES PERMIT NCO020290 and WQCS00143 Dear Mr. Davidson: This Quarterly Report documents the Town of Burnsville Sewer Collection System compliance activities during January, February and March 2023. The Town has experienced no SSO's and the Pine Swamp treatment facility has operated within permitted limits during the period of this quarterly report. Project 3b-OMC Pump Station Flow Reduction The project to install an additional pump at the OMC Pump Station to divert between 50-70,000 GPD of flow to the EY Sewer District's treatment facility located East of Burnsville has been completed. Yancey County has committed to obligating a portion of their 2021 State Budget Infrastructure funding for the construction of force main to connect. The Town previously secured engineering services for the design and bids for the force main connection to the EYWSD collection system. We are awaiting design information from the engineering firm McGill Associates. The collection system is has just recently been completed. The County has also committed to obligate funding from their above mentioned earmark for camera inspection, cleaning and inspection of portions of the EY Sewer District's collection system and repairs and upgrades to the EY- WWTP as were outlined in document sent to the County Manager dated April 20, 2022 from the ARO. The total amount allocated for these inspections and repairs will be $1.5 million. We are awaiting budget documents from the engineering firm for the county to formally process these requests through the Division. P.O. Box 97 • Burnsville, North Carolina 28714 • Phone (828) 682-2420 • FAX (828) 682-7757 • www.townofburnsville.org • Project 4-Baker's Creek Pump Station Rehabilitation The Engineering Report was submitted to the Division for review within the proper timeline. The engineers have responded to comments and we are awaiting approval. • Project 5-West Main Sewer Interceptor Improvements The Design package was submitted to the Division's engineer on CDBG-1 projects in October of 2022 and the same was returned the engineering firm in late January 2023 with comments and a request for additional information. The Town was required to hold an additional public hearing to clarify the project area covered some areas of sewer easement that left the public road right of way and crossed private property easements and amend the narrative. The public hearing was held at the Town Council's regular March 2, 2023 business meeting and the minutes will be approved and submitted with the rest of the documentation after the April 6, 2023 meeting. Due to the approval delay an extension was requested and approved until May 10, 2023 for Design and Bid package approval. • Project 7- Burnsville WWTP Improvements: Funding for this project has now been increased to $8,850,000.00 after Yancey County agreed to provide, from their State earmark, the additional $2.8 million in funding when the Town's application for more grant funding from DWI was unsuccessful. The County has contracted with WithersRavenel as the Engineering Firm. With additional funding the new proposed scope of rehabilitation would include the addition of a new 0.5 treatment unit to be installed instead of a 0.3 unit. The plan includes rehabilitation of the existing 0.5 treatment unit for an EQ basin and possibly pretreatment processing as well. The Town is planning to apply to the CDBG-1 program for another $1 million in funding for this project. The engineers and working on a new budget for that grant request. The additional funding will allow for more updates and modernization at the treatment facility. Additional Projects: • The Town in has secured grant funding through Yancey County from Dogwood Health Trust for the GIS mapping of the sewer collection system. The sewer mapping project was completed in late November 2022. Additionally the same funding source will be used to complete an update of the 2016 AMP/CIP along with an infrastructure master plan study to evaluate current conditions and capacity of all Town infrastructure and future needs of both the Town and County. McGill and Associates is finishing updating the Town's AMP/CIP plan and has begun work on the updating the SDF calculator. At a joint meeting in early March McGill updated the Town and County on their progress. We do not yet have a final completion date, but work is continuing to move forward and Town staff approved final CIP project draft last week. • The Engineering Report for the East Main Sewer Interceptor Improvements was submitted to the Division and approval letters were received on March 20, 2023. The engineers are moving forward with the design and bid package for this project within the Division's timeline. The Town Council is committed to improving and planning for future maintenance of the collection and treatment systems. The Town looks forward to the forward progress of all these projects as we move through the design phase and onto bidding and construction in accordance with the Division's timelines. Please accept this information on behalf of the Town of Burnsville Sewer System. If further information is needed, please do not hesitate to contact me at 828-682-2824 or by email at hhockaday@townofburnsville.org Sincerely, Town of Burnsville V Heather Hockaday Town Manager cc: Tim Heim, ARO Environmental Specialist Shane Dale, Public Works Director, Town of Burnsville