Loading...
HomeMy WebLinkAbout20140132 Ver 1_Inspection_20150521Project Num: 20140132 Project Name: NCDOT- SR 1151 County: Alleghany Location: NCDOT- SR 1151 Latitude: +36° 27' 29" SW Plan Location Site Owner Name NC DOT Division 11 Inspection Date: 5/6/2015 Reason for Inspection Follow-up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Wetland Inspection Report Version: 1 Status: Issued Project Type: Road maintenance/repair/improvemen Region: �linston-Salem Title: Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: � SW Measures � Operation and Maintenance � Other WQ Issues Inspection Summary: Project looked ok. Fill slopes are seeded a mulched. Some seed germination evident. Longitude: -81 ° 12' 48" Phone: Phone: 336-776-9703 Ext.3 page: 1 Site Number: 20140132 Owner: Pettyjohn, Michael A. Inspection Date: 5/6/2015 Inspection Type: Site Inspection (DOT) SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Measures were in place. Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the inspection and maintenance records complete and available for review? Comment: Measures were repaired and disturbed areas seeded and matted. Other WQ Issues Are the SW measures constructed as per the approved plans? Reason for Visit: Follow-up Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Yes No NA NE � ❑ ❑ ❑ ❑ ❑ ❑ � Yes No NA NE � ❑ ❑ ❑ Comment: This inspection was in responce to a report by Div 11 on April 20 that sediment overwelmed some EC measures after a storm event on the weekend of April 18-19. The source of sediment in some areas was not DOT related but rather to tree farm upstream of road project. page: 2