Loading...
HomeMy WebLinkAbout20140805 Ver 1_Inspection_20150505Wetland Inspection Report Project Num: 20140805 Project Name: NCDOT- Bridge No. 145 on SR County: Guilford Location: NCDOT- Bridge No. 145 on SR 2700 Latitude: +36° 14' 02" SW Plan Location Site Owner Name NC DOT Division 7 Inspection Date: 5/7/2015 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: � Operation and Maintenance Inspection Summary: Version: 1 Status: Issued Project Type: Replace bridge with bridge Region: Central Title: ❑ Not Compliant Longitude: -79° 39' 42" Phone: Phone: 336-776-9703 Ext.3 Project was in good shape. NPDES records were all in order. Rain gage on site. Disturbed areas were all seeded and matted including ditch in buffer. page: 1 Site Number: 20140805 Owner: Tippett, Lyndo Inspection Date: 5/7/2015 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? �❑❑❑ Are the inspection and maintenance records complete and available for review? �❑❑❑ Comment: Records were complete. Rain qaqe on site. A sliqht revision to plans was reviewed involvinq a ditch thouqh the buffer. It was filled and drainaqe from adlacent propertv collects in new roadside ditch. page: 2