Loading...
HomeMy WebLinkAboutNC0020451_2022 PAR Review_20230502Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes 0 No ❑ Did they send any other submissions with it? Yes ❑ No Included? Adequate? Narrative ® Yes ❑ No ❑ NA Yes ❑ No ❑ NA PPS Form ® Yes ❑ No ® Yes ❑ No SNCR ® Yes ❑ No ® Yes ❑ No IDSF ❑ Yes ❑ No ❑ Yes ❑ No Allocation Table j ❑ Yes ❑ No ❑ Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No NA ❑ Yes ❑ No ® NA Public Notice ❑ Yes ❑ No IF NA ❑ Yes ❑ No ® NA Program Information ® Yes ❑ No ® Yes ❑ No Historical SNC ❑ Yes ❑ No i® NA ❑ Yes ❑ No ® NA D E Regional Office: Winston Salem POTW: West Jefferson NPDES Permit # NC 0020451 Report Period: 1/1/22 to 12/31/22 ❑ Full ® Modified* POTW noted Corrections? ❑ Yes ® No ❑ Yes ❑ No ® NA If Wo ; check recommendation below: 1. Have at least 90% of SIU permits been issued with 180 days 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA IF ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ IN ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: Reviewed by: %4zcl.�GVQi�y Date: 5/2/2023