Loading...
HomeMy WebLinkAbout20200248 Ver 2_More Info Received_20230428 (4)D. Proposed Impacts Inventory Impacts Summary ❑x Wetlands ❑x Streams - tributaries la. Where are the impacts associated with your project ❑ Buffers ❑x Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site #* 2a1. Impact Reason/Type* 2b. Impact Duration* 2c. Wetland Type* 2d. Wetland Name* 2e. Forested ?* 2f. Jurisdiction Type* 2g. Impact Area (ac)* W1 Road/ Driveway Crossing Permanent Headwater Forest W1 Yes Both 0.165 W2 Other Temporary Headwater Forest W1 Yes Both 0.022 W3 Road/ Driveway Crossing Permanent Headwater Forest W2 Yes Both 0.157 W4 Other Temporary Headwater Forest W2 Yes Both 0.01 W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts 0.032 ac 2g2. Total permanent wetland impacts 0.322 ac 2g3. Total wetland impacts 0.354 ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Clean Fill Dirt (cubic yards n/a) Page 9 of 23 PCN Form Version 4.3- April 20, 2022 2i. Comments: Mitigation is Proposed at a 2:1 Ratio for Wetland Loss = 0.644 WMUs Page 10 of 23 PCN Form Version 4.3- April 20, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site #* 3a Impact Reason* 3b. Impact Duration* 3c. Impact Type* 3d. Stream Name 3e. Stream Type* 3f. Jurisdiction Type* 3g. Stream Width (avg ft) * 3h. Impact length (linear ft) S1 Road Crossing Permanent Crossing/ Culvert Tributary Stream 2 Intermittent Both 3 26 S2 Road Crossing Permanent Crossing/ Culvert Tributary Sream 1 Intermittent Both 4 93 S3 Temporary Construction Temporary Other Tributary Stream 1 Intermittent Both 4 25 S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: 0 linear ft M. Total permanent stream impacts: 119 linear ft 36. Total temporary stream impacts: 25 linear ft 3i4. Total stream and ditch impacts: 145 linear ft Page 11 of 23 PCN Form Version 4.3- April 20, 2022 3j. Comments: Total requested permanent stream loss equals 119 LF & 0.012 acres, as such no stream mitigation is proposed as it's less than the typical 0.02mitigation threshold. Stream fill proposed at S1 will result in the relocation of the stream into a roadside ditch. This stream is a modified natural stream / ditch, that has beenmanipulated and maintained as a ditch for decades. Temporary stream impacts proposed at S3 will be restored to original contours and cross sectional area above and below the proposed culvert. Thisstream has also been ditched and maintained for decades. Ditch Impacts are included in Section 4. Page 12 of 23 PCN Form Version 4.3- April 20, 2022 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. 4a1. 4b. 4c. 4d. 4e. 4f. Site #* Impact Reason Impact Waterbody Name* Activity Type* Waterbody Impact area Duration* Type* (ac)* 01 Ditch Fill Permanent Ditch #1 Fill Ditch 0.035 02 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 03 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts 0 ac 4g. Total permanent open water impacts 0.035 ac 4g. Total open water impacts 0.035 ac 4h. Comments: Ditch1 is a potentially jurisdictional ditch (440 If / 0.035 acres) believed to have an OHWM, but no flow or stream characteristics and obviously manmadedug along a woods line. The ditch will no longer serve a drainage purpose post development and filling the ditch should allow groundwater levels to riseand help maintain or even expand the retained/avoided jurisdictional wetlands within the future northwest quadrant of the future intersection. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. Page 13 of 23 PCN Form Version 4.3- April 20, 2022