HomeMy WebLinkAbout310060_Compliance Evaluation Inspection_20230427 Division of Water Resources
Facility Number 3 I - 6 0 O Division of Soil and Water Conservation
0 Other Agency
Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: el outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: /27/23 Arrival Time: p; () Departure Time: E,2; County: ��r!�v, Region:
Farm Name: Stj n S pl i ne tiur Se-✓'le,S Owner Email:
Owner Name: �f/l �^ ��Pin;((�(ps- Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Marsl��( �I;�,�y Integrator:
Certified Operator: JA A Clll D5 Certification Number: 7
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish La er Dairy Cow
Wean to Feeder I►-A.0 d G I JNon-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes [✓]No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes a�FNo
❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE
of the State other than from a discharge?
Page l of 3 511212020 Continued
lFacility Number. - 0 6 Date of Inspection: /27/Z
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? [:] Yes fNo ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): � _
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E!fNo ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑'% ❑NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes [Er No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? [:] Yes �o ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes ED"No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need [:] Yes ETNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes [ No ❑ Nil ❑ N F:
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [jNo ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [?I-No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes D No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes [El No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes dNo ❑ NA ❑ NE
Reuuired Records&Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes allo ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes Q No ❑ NA ❑ NE
the appropriate box.
❑WUP []Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking [:]Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E�No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes jrNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: 3 I - G 6 p 1 jDate of Inspection: 27 2
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No E]NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes O—No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [l No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No [ J NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [allo ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes to"N'o ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes [�lo ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [�No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes VN
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
• �0 A s Si`viCC 2-03- ) rKjo 2c�L2
• Ne �v►rp i✓lq CA 001
y11112-3 U(vt 2_,2�
2,j2 G
Rr vie wer/Inspector Namr+, m�c d 0,vzo Phone: `1y' J-,V-6j. �2 7
Reviewer/Inspector Signature: Date: y/271z 3
Page 3 of 3 511212020