HomeMy WebLinkAbout310178_Compliance Evaluation Inspection_20230427 Division of Water Resources
Facility Number 3 1 - /7$ 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: taCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: t2(Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Timer Departure Time: ( County: Pupt'ih Region: GJi R70
Farm Name: �L'IVs EY Marsk411 PA �'ys I�c•f/� Owner Email:
Owner Name: M-11 PAIII)Os Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: 411"1 AL.%p s- Integrator:
Certified Operator: MGIlSv�w'J V� �s Certification Number: a '
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I 11-ayer Dairy Cow
Wean to Feeder 71011 2500 on-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes M—No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes [ o ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [✓]-No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facilit Number: 1 - i'7 Date of Inspection: y 2-7/Z3
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ❑'No ❑ NA ❑ NE
a.If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes D"No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a 0 Yes ONo ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an innnediate public health or environmental threat, notify DNN'R
7. Do any of the structures need maintenance or improvement? ❑ Yes D No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Ej No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes EfNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes Q'No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes allo DNA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [I No ❑ NA ONE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [allo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [D No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes Eallo ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes [�J-No ❑ NA ❑ NE
Required Records&Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes �'o ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [2No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists [:]Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes E o ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections [:]Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes Q No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facilit Number: / - /-7 1):Ite oi'Inspection: y z7/Z 3
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No [Ej' /\ ❑ NI:
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [ErNo ❑ NA ❑ N F
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [TNo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No 0 NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ONo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ffNo ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑allo ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ff No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [] No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 0 No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes 0 No ❑ NA ❑ NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
• S(,, At 054Z 3 dart- 2e
(gI,'jrc4,bN 7/2)/21 &�jt �-r 2,02-3
SoJ1
� OI
/1
1/2 3 _/ _L. 2VZ�;
• �.�Nq��/s/S
n n Oh �cln^P�h� C)'A S L f
Reviewer/Inspector Name: &IIIt,17,) Phone: -1l0. 7q,?.�G5S
Reviewer/Inspector Signature: i%/ � - Date: VIX7,123
Page 3 of 3 511212020