Loading...
HomeMy WebLinkAbout20091028 Ver 1_Certification of Completion_20150515Beverly Eaves Fer�ue Governor .� North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director DWQProjectNo.: 20091 �'2v� County: ���Y�4M Applicant: �<<��'r Project Name: ; l� � .� ��' S F t ti Date of Issuance of 401 ater Quality Certification: a � Dee Freeman Secretary ����) Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. ApplicanYs Certifi ation I, �, ���-�7 � , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built wi ' substantial o pliance and intent of the 401 Water Quality Certification and Buffer Rules, th appro e n sp,�cifications, and other supportingn� aterials. Signatu : Date: ( 3�Gj��, l} AgenYs Certif tion I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. , Signature Registration No. Date 401 Qversighi'Express Review Pennitting Unit 1650 Maii Ser,�ice Center, RaEeigh, North Caroiina 27699-1050 Location: 2321 Crabtsee Blvd., Raleigh, North Garalina 27604 Phore: 919-73s-17861 FAX: 919-733-6893 Internei: nttp:�rh2aer:.csta#e.nc.uslnc�vetlands' A.n Equal Opporunitp 1Affirn�ative Action Empleyer � � �t;. � � � � {�CIC �� NorthCarol_ina �IAY 1� 2 0 i 5 ��tlll"ll��� DENR - WATER RESOUftCES TRANSPORTATION PERMITTING UNI7