HomeMy WebLinkAboutTimbermill Phase 1 Impact Summary TableTimbermill Wind: Proposed Phase I pre-construc�on impacts
Impact ID Feature ID
Wetland
Ra�ng Impact Type
Impact Sq
Ft
Total
Proposed
Impact
Sq Ft
Mi�ga�on
Ra�o
175 WG Low Conversion 2,119 84,355 0.5:1
180 WG Low Permanent 79 79 1:1
1811 Ditch – No
Wetland
impacts
N/A Temporary 83 N/A N/A
260 WG Low Conversion 1,523 129,462 0.5:1
2751 Ditch – No
Wetland
impacts
N/A Permanent 219 N/A N/A
276 WG Low Permanent 6,598 17,883 1:1
281 WG Low Permanent 79 79 1:1
412 WN Medium Conversion 25,510 78,668 0.75:1
417 WN Medium Permanent 79 79 1:1
418 WN Medium Permanent 79 79 1:1
419 WN Medium Permanent 79 79 1:1
4253 WO Low2 Temporary 0 55,166 N/A
4261 Ditch – No
Wetland
impacts
N/A Permanent 123 N/A N/A
427 WO Low2 Permanent 118,176 261,139 1:1
Temporary 2 19,367 N/A
4281 Ditch – No
Wetland
impacts
N/A Permanent 101 N/A N/A
429 WO Low2 Conversion 335 62,951 0.5:1
Temporary 18,743 314,384 N/A
Total Conversion – Wetlands with Low Func�onal Ra�ngs 3,977
(0.09 acre)
0.5:1
Total Conversion – Wetlands with Medium and High Func�onal
Ra�ngs
25,510
(0.59 acre)
0.75:1
Total Permanent - Wetlands 125,169
(2.87 acre)
1:1
Total Combined Impacts (acres a�er ra�os applied) 3.36
1 – Area not part of totals as these are ditch impacts and no mi�ga�on is required
2 – Within Pine Flat por�ons of WO rated as Low
3 – N/A as zero square feet of impacts