Loading...
HomeMy WebLinkAbout41659.054-PERM-WTIM_Phase1DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D OL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U P G U P G U P G U P G U P G U P G U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUD D D D D D D D D D D D D D D D D D D D D D D 180-WetlandPermanent:79sq ft 175-WetlandConversion:11sq ft 175-WetlandConversion:2,108sq ft 181-DitchTemporary: 83sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 1 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D OL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U P G U P G U P G U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D D 180-WetlandPermanent:79sq ft 175-WetlandConversion:11sq ft 175-WetlandConversion:2,108sq ft 181-DitchTemporary: 83sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 2 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D OL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U P G U P G U P G U P G U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D 180-WetlandPermanent:79sq ft 175-WetlandConversion:11sq ft 175-WetlandConversion:2,108sq ft 181-DitchTemporary: 83sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 3 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D OL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U P G U P G U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PG U PGU PGU PGU PGU PGU PGU PGU PGU P G U P G U P G U P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D DD D D D D D D D D D D D D D D D D D D D D D D 180-WetlandPermanent:79sq ft 175-WetlandConversion:11sq ft 175-WetlandConversion:2,108sq ft 181-DitchTemporary: 83sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 4 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DO LDOLDOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DO L DO L DO L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL PGU PGU PGU PGU PGU PGU PGU P G U P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 281-WetlandPermanent:79sq ft 260-WetlandConversion:1,523sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 5 1 " = 30 ' DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L DOL DOL D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D OL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L DOL DOL DOL D O L D O L PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D D 276-WetlandPermanent:6,598sq ft 275-DitchPermanent:219sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 6 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOL DOL DOL D O L D O L DOL DOL DOL DOL DOL D O L DOL DOL DOL DOL D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOL DOL DOL D O L DOL D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D 276-WetlandPermanent: 6,598sq ft 275-DitchPermanent:219sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 7 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DO LDOLDOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DO L DO L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL PGU PGU PGU PGU PGU PGU PGU PGU PGU P G U PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 281-WetlandPermanent:79sq ft 260-WetlandConversion:1,523sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 8 1 " = 30 ' D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 419-WetlandPermanent:79sq ft 418-WetlandPermanent:79sq ft 417-WetlandPermanent:79sq ft 412-WetlandConversion:25,510sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 120 24060 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 9 1 " = 120 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L D O L D O L D O L D O L D O L D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 417-WetlandPermanent:79sq ft 412-WetlandConversion:25,510sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 10 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 418-WetlandPermanent:79sq ft 412-WetlandConversion:25,510sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 11 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 419-WetlandPermanent:79sq ft 412-WetlandConversion:25,510sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 12 1 " = 30 ' DOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D D D D D D D 425-WetlandTemporary: 0sq ft 427-WetlandPermanent:118,176sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 13 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL 426-DitchPermanent:123sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 14 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL OL D D D D D D DD DD D D D D D 425-WetlandTemporary:0sq ft 427-WetlandPermanent:118,176sq ft 429-WetlandTemporary:17,785sq ft 429-WetlandTemporary:958sq ft 427-WetlandTemporary:2sq ft 429-WetlandConversion: 335sq ft 428-DitchPermanent:101sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 390 780195 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 15 1 " = 390 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O LDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL 427-WetlandPermanent:118,176sq ft 429-WetlandTemporary:17,785sq ft 427-WetlandTemporary: 2sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 16 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D 427-WetlandPermanent:118,176sq ft 428-DitchPermanent:101sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 17 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D D D D D D D D D 427-WetlandPermanent:118,176sq ft 429-WetlandTemporary:17,785sq ft 429-WetlandTemporary:958sq ft 429-WetlandConversion:335sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 18 1 " = 30 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D OL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O LDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D 427-WetlandPermanent:118,176sq ft 429-WetlandTemporary:17,785sq ft 429-WetlandTemporary:958sq ft 427-WetlandTemporary: 2sq ft 429-WetlandConversion:335sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 90 18045 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 19 1 " = 90 ' DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D D D D D D D D D D D D D D D D D D D D D D D 427-WetlandPermanent:118,176sq ft 429-WetlandTemporary:17,785sq ft 429-WetlandTemporary:958sq ft 429-WetlandConversion:335sq ft Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase1.mxd Legend StudyLimits - 1,933.4 AcresPhase 1 Limits - 5.0 Acres DO L Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance DO L Temporary Limits of Disturbance D Silt FenceWattle ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch ³ 0 30 6015 Feet 1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO UP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISIO N ACHIEVED THROUGH OURS Site Develo pment Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAW ING PREPARED AT THE 1001 Boulders Par kway, Suite 300 | Richm ond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.tim mons.com CO RPO RATE OFFICE Technology TIMBERMILL WIND PROJECT PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 1 41659.054 CHOWAN COUNTY, NORTH CAROLINA 4/24/2023 C. CHAPPELL M. TREW M. TREW 20 1 " = 30 '