HomeMy WebLinkAbout41659.054-PERM-WTIM_Phase2DOL
DOL
DOL
DOLDOLDOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
425-WetlandTemporary:55,166sq ft
427-WetlandPermanent:142,961sq ft 429-WetlandTemporary:39,566sq ft
430-DitchTemporary:4,825sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 180 36090
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
1
1 " = 180 '
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
426-DitchTemporary:26sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 30 6015
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
2
1 " = 30 '
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
D O L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOLDOLDOL
DOLDOL
DOL
DOL
DOL DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
425-WetlandTemporary:55,166sq ft
427-WetlandPermanent:142,961sq ft
429-WetlandTemporary:39,566sq ft
429-WetlandTemporary:6,033sq ft427-WetlandTemporary:5,221sq ft
427-WetlandTemporary:5,369sq ft
427-WetlandTemporary: 8,774sq ft
430-DitchTemporary:4,825sq ft
Path: Y:\804\41659.054-Timbermill_Wind\GIS\WTIM\41659.054-PERM-WTIM_Phase2.mxd
Legend
StudyLimits - 1,933.4 AcresPhase 2 Limits - 6.5 Acres
DO
L
Permanent Limits of DisturbanceDOLPermanent Conversion Limits of Disturbance
DO
L
Temporary Limits of Disturbance
D Silt FenceWattle
ÍÍÍÍÍÍÍÍProposed Rip RapUHOOverhead Transmission LinePGUUnderground Power LineProposed LayoutTemporary Crane PathTemporary RoadPermanent CulvertTemporary CulvertTemporary Ditch ImpactsPermanent Ditch ImpactsTemporary Stream ImpactPermanent Stream ImpactPermanent Conversion ImpactPermanent Wetland ImpactTemporary Wetland ImpactEphemeral StreamIntermittent Stream Perennial StreamPalustrine Emergent WetlandsPaulstrine Forested WetlandsPondDitch
³
0 240 480120
Feet
1. Waters of the U.S. within the project study limits have been located bySWCA.2. Waters of the U.S. have been confirmed by the U.S. Army Corps ofEngineers per the Preliminary Jurisdictional Determination issued onJanuary 11, 2022.3. Project limits are approximate.4. Topography based on USGS LiDAR.
These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GRO
UP.
Environmental
JOB NUMBER
CHECKED BY
SCALE
SHEET NO.
DATE
DESIGNED BY
DRAWN BYYOUR VISIO
N ACHIEVED THROUGH OURS
Site Develo
pment
Residential
Infrastructure
DATE
REVISION DESCRIPTION
THIS DRAW
ING PREPARED AT THE
1001 Boulders Par
kway, Suite 300 | Richm
ond, VA 23225
TEL 804.200.6500 FAX 804.560.1648 www.tim
mons.com
CO
RPO
RATE OFFICE
Technology
TIMBERMILL WIND PROJECT
PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP- PHASE 2
41659.054
CHOWAN COUNTY, NORTH CAROLINA
4/24/2023
C. CHAPPELL
M. TREW
M. TREW
3
1 " = 240 '