Loading...
HomeMy WebLinkAbout20141039 Ver 1_Emails_20150511 (2)Scheller, Roberto From: Jones, Jennifer (Ro|eigh)«JennifecJones@oeoonn.00nn> Sent Wednesday, April 15.20157:43PK4 To: SoheUer,Roberto Subject: RE: Elizabeth City USCG Boat Ramp_Final Draft EA Hi Roberto, Below is the link to download the Final Draft Environmental Assessment for Dredging at IVIWR Boat Ramp, IUSCG Base Elizabeth City. If you have trouble accessing the link or if you would like me to send you a CD with a PDF of the report, just let meknow. As you'll see in the report, the results of the Draft EA support aFON3i The actual FON3| will be signed and included in the Final EA following the public comment period. Please let me know if you have any questions or concerns. Thankyou! Jennifer Jennifer (Raleigh)Jones has sent you 1 file using AECOM's File Transfer System. Jennifer (Ra|eigh) Jones says: Final Draft Environmental Assessment for Dredging at MWR Boat Ramp, U.S. Coast Guard Base Elizabeth City, Elizabeth City, NC This file will be available for download until 4/22/2015 File Size IVIWR Boat Ramp EA FINAL DRAFT 04-09-15.pdf 1n.403KB Download all files (.zip If you are having trouble accessing the links in this email, you can view this message as a web page by copying the following link and pasting it into your browser: |f you have any questions, please contact your project manager. This e-mail and any attachments contain AECOM confidential information that may bo proprietary orprivileged. If you receive this message m error o, are not the intended recipient, you should not retain, distribute, disclose o, use any of this information and you should destroy the e-mail and any attachments or copies. From:3ones, 3enniferKRaleigN Sent: Tuesday, April 07, 2015 10:20 AM To: ScheUer,Roberto Subject: RE: Elizabeth City USCG Boat Ramp EA | wanted to let you know that the Final Draft EA will be issued for Public Notice this week so you can resume the permitting process. The USCG anticipates issuing aFONS| with the Final EA. Would you like meto send you a copy of the Final Draft EA for your review (either a hard copy or electronic copy)? Thanks! Jennifer From: Scheller, Roberto [ mai Ito: roberto.scheller(a)ncdenr.aov] Sent: Tuesday, February 10, 2015 3:22 PM To: Jones, Jennifer (Raleigh) Subject: Elizabeth City USCG Boat Ramp EA Jennifer: You project will remain on Hold, as requested, until you submit a finding on the EA. If you should have any questions on this matter please contact me. Thank you RL Scheller Division of Water Resources Water Quality Regional Operations Section Washington Regional Office 943 Washington Square Mall Washington, NC 27889 252 - 948 -3940 * *E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. **