HomeMy WebLinkAbout20071559 Ver 1_More Info Received_20071005N ~-~
hi~n
~~ OWn ~~
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
U. S. Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, NC 27889-1000
October 5, 2007
o-~ i s55
Mr. David Baker
NCDOT Coordinator
LYNDO TIPPETT
SECRETARY
0 L~ V L5 LI V
~ C T ~ 9 2007
DENR - WATER QUALITY
YUETIANLl° s+~?~ ST!?:?~f"r~?~ gPA!~IGH
Subject: Amendment to the Application for a Regional General Permit 198200031
and Section 401 Water Quality Certification for TIP R-2408A, the
proposed improvements of SR 1323 (Riverview Street) from the intersection
of Iotla Street to NC28 in Macon County. NCDOT Division 14. Federal
Project No. STP-28(1), State Project No. 8.1970801.
Reference: NCDOT Permit Application dated September 10, 2007.
Dear Sir:
Please reference previous application along with the attached revised drawings.
Since the submittal of the permit application, clarification of sites on the project have been
requested from NCDWQ. Modifications to the permit drawings for Sites 1 and 3 have
occurred to address concerns with the construction of these sites.
Permanent Impacts
Site 1 (28+ OS-L-Rt)
Due to re-evaluation of the removal of the attached 18-inch pipe connected to the junction
box, NCDOT will remove only 37-feet of the existing 18-inch pipe at this time, to
accommodate the new, longer 64-inch metal arch pipe. The new 64-inch pipe will be
connected to the 18-inch pipe at a junction box. Hydraulic information concerning the
junction box is contained on Sheet 7 of the plan drawings. No additional impacts will occur
due to the revision of this site. Due to time constraints, NCDOT will remove the junction
box and the remaining 18-inch pipe and restore the stream using natural stream design
techniques at a later date. NCDOT will propose to use mitigation credit from this site for the
B section, which is a separate permit application.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-733-3141
FAX: 919-715-1501
WEBSITE: bVWW.DOH.DOTSTATE.NC.US
LOCATION:
PARKER LINCOLN BUILDING
2728 CAPITAL BLVD., SUITE 240
RALEIGH NC
Site 3 (13 +23-Y1-)
Previous plan drawings of the cross section of the placement of the new 75-inch x 55-inch
metal arch pipe erroneously showed that the pipe would not be buried below the stream
bottom. Revised drawings of this site show the new pipe being buried at least 12-inches
below the stream bottom (Sheet 13). This will allow natural stream bottom materials to
become established following installation and provide aquatic passage during periods of low
flow. Because of the slope of the new pipe (<6%), a dissipater pad will be installed on the
downstream side of the pipe (Sheet 11). The addition of the dissipater pad will cause an
increase of 24 feet of permanent impacts to this site. Permanent impacts at this Site 3 will
increase to 124 feet.
Permanent impacts for the entire project will increase to a total of 167 feet (See Permit
Drawings Sheet 3).
Miti ation
The Ecosystem Enhancement Program will provide mitigation for 167 feet of permanent
impacts (acceptance letter pending).
Thank you for your assistance with this project. If you have any questions or need additional
information, please contact Mr. Jason Dilday at jldilda~(cr~,dot.state.nc.us or (919) 715-5535.
A copy of this application will also be posted at
http://www.ncdot.org/doh/preconstructlpe/neu/Permit.html.
Sincerel ,
~.
Gregory J. horpe, Ph.D., Environmental Management Director
Project Development and Environmental Analysis Branch
cc:
W/attachment
Mr. John Hennessy, NCDWQ (5 Copies)
Ms. Marella Buncick, USFWS
Ms. Marla Chambers, NCWRC
Mr. Harold Draper, TVA
Dr. David Chang, P.E., Hydraulics
Mr. Victor Barbour, P.E., Project Services Unit
Mr. Greg Perfetti, P.E., Structure Design
Mr. Mark Staley, Roadside Environmental
Mr. J. B. Setzer, P.E. (Div. 14), Division Engineer
Mr. Mark Davis (Div. 14), DEO
W/o attachment
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USAGE, Wilmington
Ms. Beth Harmon, EEP
Mr. Todd Jones, NCDOT External Audit Branch
Mr. Steven Brown, P.E., PDEA Project Planning Engineer
Page 2 of 2
IMPACT SUMMARY
WETLAND IM PACTS SURFACE WATER IMPACTS
Site
NO.
StatlOn
From/To
StrUCtUfe
SIZe Permanent
FIII In
Wetlands
ac
Temp. Fill
In Wetlands
ac
Excavation
In Wetlands
ac Mechanized
Clearing
in Wetlands
ac Hand
Clearing
in Wetlands
ac Permanent
SW
Impacts
ac Temp.
SW
Impacts
ac Exist. Chan.
Impacts
Permanent
ft Exist. Chan
Impacts
Temp.
ft Natural
Stream
Design
ft
1 L 28+05 64" X 43" CMPA <0.01 <0.01 3 4 N/A
2 L 41+58 142" X 91" CMPA 0.01 <0.01 40 48 N/A
3 Y1 13+23 73" X 55" CMPA 0.03 <0.01 124 25 N/A
TOTALS: 0.00 0.00 0.00 0.03 0.01 167 77 0
Bold text denotes revised impact numbers.
F~+~ift;ll DraWitl~ NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
Shy _~~ pt r'~ f MACON COUNTY
~tv~S,a ~ 1~'$'Z.oD7 W BS - 34427.1.1
SHEET 05/31 /06
R-2408A
Site 1 Station 28+05
Place coir fiber matting below bankfull
elevation at the pipe inlet and outlet.
Establish vegetation above bankfull elevation.
KATHRINE E. PENNINGTON ET. AL.
14
.F-~E e ' °-"~.,E ~~ k 5~
~'~;~,rut UrawinQ ~~``'~~ 60.E
sheet ~.,. of 13 . ~ . _ _ _ _ _ _ _ ~,,, ```~-'E`-~.
.~
26~'7b'~4 -. ~
5~ ~ R/W
N
~'!
EX~S N~ R/W
,. p
.~
~-
~ ~,, .-
_~o~-r
W
m
d
7 T-F .Z ._.. ~- -'f-
x
Scale 1" = 30'
30' 0 30' 60'
DENOTES TEMPORARY
FILL IN SURFACE
WATER
DENOTES FILL IN
SURFACE WATER
-r2408a ddc14 pt2permit.dgn 09/28/2007 01:07:32
+~0
N ~ j~
M
~~n
~~F
F
.--''~~ 26~.~b cs
~%
~~
~~
~+`~'
,~F
/ '
i~ ~
F
T ~ INV=
2015. I
n
E ^$ 28+i .d1
PDE ++JB W/GI 60.00 RT
7' 1" X 7'i~9" X 6' 9" W
!~
11 ~
II
~~ 28+13.9
11 aq.15~~
11
P 4,~ NORTN CARQLINA
GE A~+MENT QF TRANSPORTATION
«,~~ D6 S-29 PG 2132
~-
~~ i2
~~
~~
R-2408A
Site 1 Station 28+05
CL Elev.: ~.~1ft
Zeffype Pipe:
rAe Enterence~
r~Gon of Flaw:
Idrological Method:
W. Gontra! Elevetian
1-8
~_
~ o~u~y Inlet
~ [nvertHfev.:
Fi
J r.w
Outset Inv. Elev. Znf5.~
,24,Z5.7~
li.W.
LS,
50- •p2 re
7 f~ 't.77 ft L= p~ p _f}
Permi# Drawirt~
Sheet_7 of 13
Rebls~ I~fs/t„~
STATI O N
28 + 04.97
RORDWRY
~PPROXIMRTE UPSTREAM
5 0 5 10
Feet
SECTION ~',,
l
,
i
EXIST~~1G 24" PIPE
Plan Summary Data
Drainage Area; ~~
Design I=raq.; ~~ ~,
Design DJsch.: 7'>* cis
Dosign H.W. Elev.: ~,~~'
g10Q Discharg.: ~G cg's
Qf00 Elea: 2021. ~'~
Overtopping Ereq.: ~ ~QQ ~r
Overlapping ~lsch.: i ? 0
Overtopping Elav.: zd25. b7
POSITION,,~RT UPSTRERM END
~ ~
7 ~
~ ~
1
PROPOSED 64" X 43' CMPR
~T UPSTRERM END
INUERT BURIED 2 FOOT
TIE IN TO PROPOSED JUNCTION BOX
R-2408A
Site 3 Station 13+23 -Y1-
Place coir fiber matting below bankfull
elevation at the pipe inlet and outlet.
Establish vegetation above bankfull elevation.
snit ~j' ~ 13 \
~~+et _ ._ _.....~
Rfu(sed ~0~S~1oei
S~.le 1" = 30'
30' 0 30' 60'
DENOTES TEMPORARY
FILL IN SURFACE
WATER
DENOTES FILL IN
SURFACE WATER
~ ~'
15 +0$.D~
} 50.00 ~ J~
~ w
~ ~a
u J I pop, 0
\ ~ ' ~ptiyew°y~
~~ , ,
' 13+b3,1$
old equipment/junk 1 ~ ~ ~6.og
1 .. ~~
~ ~
J ,
~ ""`- --- ~_.--- ~. Cdr ~ _~ ~ ~ ra. " ~~ -r2_:.~
,.--~_
ENERGY OISSPAiOR
te'~x 6'x r3~
ass ~ ~ r~r
~ EST. T TpN ^~ ~qg~
~ ~~ QsTFF ,E,y/
_~a.~
r
/ bg.05 if
73
/ 49.
i
S,~e~
`~ S
)POSED. ~r~l~ W
12+ A ~
.'/,
-y~~~ ~ ,
R-2408A
Site 1 Station 28+05
Place coir fiber matting below bankfull
elevation at the pipe inlet and outlet.
Establish vegetation above bankfull elevation.
~rrmit D~awinp
it~t_1L of 13
~d,;se~ Wf S~~"1
Scale 1" = 30'
30' 0 30' 60'
C/LLl///a DENOTES TEMPORARY
FILL IN SURFACE
WATER
DENOTES FILL IN
SURFACE WATER
-r2408a ddc14 pt2permit.dgn 09!28!2007 01:14:11 P
R-2408A
Site 3 Station 13+23 Y1
Proposed 126' 73" x 55" CSPA
I;~nnit fkawitlp
.~-+~et ~ 3 of l3 ~~
'std Io~S/7oD7
5 0 5 10
Feet
PROPOSED GRADE LINE AT CENTER LINE OF EXISTING NC 2$
~~rlx.~i+.~i'~i:'~il~ ~~~'r:'~r:~a:~ ~.,.~,.:-~:.-ii---~;; i'..:~":'~u.~•.~' ~~ ~'.".~A ~':! ~::~v,. ~-~~d~; ~Y>~;~r.~~..1:>tniA~i_ ~u.~,.i~.~+ s ~.. ~:`..ii;~.i..~C:~q:~_:~tl: ~".~} ~,. t:':lt~.,",~1sas+l ~e~:'~: ~k~`.!~
EXISTING 30 IN. PIPE _~•'•
_____ __ _ _ AT ROAD CENTER LINE •' APPROXIMATE DOWNSTREAM SECTION
_ r ~.
,'~, TO BE REMOVED /.~'..'
~ , ~.
•
PROPOSED~PIPE°. ~~ ~\~ ~' ~•'•~ APPROXIMATE UPSTREAM SECTION
AT ROAD CENTER~LINE~ ` ' ,'~,~~~
INVERTS BURIED 1~'~~.,\~~ \~ ~,',~'~
~, • ,.-
SLOPE = .064 FT,/FT, ~~ --- ~---_
-r2408a ddc14 pt2permit.dgn 09128/2007 01:12:57
R-2408A
Site 1 Station 28+05
Place coir fiber matting below bankfull 2m63 zm6`
elevation at the pipe inlet and outlet.
Establish vegetation above bankfull elevation. ~. .
Pem>It ~f81MIt1Q E `.
sneer 6 of i3 ~ha
2
R,ev(ud In/S~7ae~ ~ / ~
Scale 1" = 30'
30' 0 30' 60' i
~~
r~~~LLd DENOTES TEMPORARY ~~~/
FILL IN SURFACE ~
WATER ~ ,m~'
DENOTES FILL IN
SURFACE WATER
-r2408a ddc14 ptzpermit.dgn 09/2812007 01:09;17
~~~ ~~ ~~
hp ~ ~~ ti@m ~
;U0 Oh N
//ti A
f_ ~OP~ ~
~ N~
~~
time ry~m~'ry~^`' m
~~~ m IS ` C
ti
~~11
-,
.,, ,
i027-
e My N
~~ f ~,
¢ N
E
1 '"
// ti~
N _ m /
a? /f
~ ~ 2®2~
J~
STIN~ti ~W
`,.._ ~ ._
-~o~.
~. o
a
`~ 0_ p~
i
~~~~
~~
z®14
7' 1" X 7'~I" X 6' 9" o
2013 I~ 1
/~
i
~ +I ~$~~~5~ z011---
S
.~
~~ 2 9q A5R'i
~ NORTH INA
DEPA~~M Zm TRANSP ATI
~~- DB S-29 P 2
~zeaz I~ ~2
~~ ~
~ \\~\~~\
~`~~~
i ---
~20~9
~ ~
~ N
0
N
cs~
a