Loading...
HomeMy WebLinkAbout20071559 Ver 1_More Info Received_20071005N ~-~ hi~n ~~ OWn ~~ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, NC 27889-1000 October 5, 2007 o-~ i s55 Mr. David Baker NCDOT Coordinator LYNDO TIPPETT SECRETARY 0 L~ V L5 LI V ~ C T ~ 9 2007 DENR - WATER QUALITY YUETIANLl° s+~?~ ST!?:?~f"r~?~ gPA!~IGH Subject: Amendment to the Application for a Regional General Permit 198200031 and Section 401 Water Quality Certification for TIP R-2408A, the proposed improvements of SR 1323 (Riverview Street) from the intersection of Iotla Street to NC28 in Macon County. NCDOT Division 14. Federal Project No. STP-28(1), State Project No. 8.1970801. Reference: NCDOT Permit Application dated September 10, 2007. Dear Sir: Please reference previous application along with the attached revised drawings. Since the submittal of the permit application, clarification of sites on the project have been requested from NCDWQ. Modifications to the permit drawings for Sites 1 and 3 have occurred to address concerns with the construction of these sites. Permanent Impacts Site 1 (28+ OS-L-Rt) Due to re-evaluation of the removal of the attached 18-inch pipe connected to the junction box, NCDOT will remove only 37-feet of the existing 18-inch pipe at this time, to accommodate the new, longer 64-inch metal arch pipe. The new 64-inch pipe will be connected to the 18-inch pipe at a junction box. Hydraulic information concerning the junction box is contained on Sheet 7 of the plan drawings. No additional impacts will occur due to the revision of this site. Due to time constraints, NCDOT will remove the junction box and the remaining 18-inch pipe and restore the stream using natural stream design techniques at a later date. NCDOT will propose to use mitigation credit from this site for the B section, which is a separate permit application. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-733-3141 FAX: 919-715-1501 WEBSITE: bVWW.DOH.DOTSTATE.NC.US LOCATION: PARKER LINCOLN BUILDING 2728 CAPITAL BLVD., SUITE 240 RALEIGH NC Site 3 (13 +23-Y1-) Previous plan drawings of the cross section of the placement of the new 75-inch x 55-inch metal arch pipe erroneously showed that the pipe would not be buried below the stream bottom. Revised drawings of this site show the new pipe being buried at least 12-inches below the stream bottom (Sheet 13). This will allow natural stream bottom materials to become established following installation and provide aquatic passage during periods of low flow. Because of the slope of the new pipe (<6%), a dissipater pad will be installed on the downstream side of the pipe (Sheet 11). The addition of the dissipater pad will cause an increase of 24 feet of permanent impacts to this site. Permanent impacts at this Site 3 will increase to 124 feet. Permanent impacts for the entire project will increase to a total of 167 feet (See Permit Drawings Sheet 3). Miti ation The Ecosystem Enhancement Program will provide mitigation for 167 feet of permanent impacts (acceptance letter pending). Thank you for your assistance with this project. If you have any questions or need additional information, please contact Mr. Jason Dilday at jldilda~(cr~,dot.state.nc.us or (919) 715-5535. A copy of this application will also be posted at http://www.ncdot.org/doh/preconstructlpe/neu/Permit.html. Sincerel , ~. Gregory J. horpe, Ph.D., Environmental Management Director Project Development and Environmental Analysis Branch cc: W/attachment Mr. John Hennessy, NCDWQ (5 Copies) Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Mr. Harold Draper, TVA Dr. David Chang, P.E., Hydraulics Mr. Victor Barbour, P.E., Project Services Unit Mr. Greg Perfetti, P.E., Structure Design Mr. Mark Staley, Roadside Environmental Mr. J. B. Setzer, P.E. (Div. 14), Division Engineer Mr. Mark Davis (Div. 14), DEO W/o attachment Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USAGE, Wilmington Ms. Beth Harmon, EEP Mr. Todd Jones, NCDOT External Audit Branch Mr. Steven Brown, P.E., PDEA Project Planning Engineer Page 2 of 2 IMPACT SUMMARY WETLAND IM PACTS SURFACE WATER IMPACTS Site NO. StatlOn From/To StrUCtUfe SIZe Permanent FIII In Wetlands ac Temp. Fill In Wetlands ac Excavation In Wetlands ac Mechanized Clearing in Wetlands ac Hand Clearing in Wetlands ac Permanent SW Impacts ac Temp. SW Impacts ac Exist. Chan. Impacts Permanent ft Exist. Chan Impacts Temp. ft Natural Stream Design ft 1 L 28+05 64" X 43" CMPA <0.01 <0.01 3 4 N/A 2 L 41+58 142" X 91" CMPA 0.01 <0.01 40 48 N/A 3 Y1 13+23 73" X 55" CMPA 0.03 <0.01 124 25 N/A TOTALS: 0.00 0.00 0.00 0.03 0.01 167 77 0 Bold text denotes revised impact numbers. F~+~ift;ll DraWitl~ NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Shy _~~ pt r'~ f MACON COUNTY ~tv~S,a ~ 1~'$'Z.oD7 W BS - 34427.1.1 SHEET 05/31 /06 R-2408A Site 1 Station 28+05 Place coir fiber matting below bankfull elevation at the pipe inlet and outlet. Establish vegetation above bankfull elevation. KATHRINE E. PENNINGTON ET. AL. 14 .F-~E e ' °-"~.,E ~~ k 5~ ~'~;~,rut UrawinQ ~~``'~~ 60.E sheet ~.,. of 13 . ~ . _ _ _ _ _ _ _ ~,,, ```~-'E`-~. .~ 26~'7b'~4 -. ~ 5~ ~ R/W N ~'! EX~S N~ R/W ,. p .~ ~- ~ ~,, .- _~o~-r W m d 7 T-F .Z ._.. ~- -'f- x Scale 1" = 30' 30' 0 30' 60' DENOTES TEMPORARY FILL IN SURFACE WATER DENOTES FILL IN SURFACE WATER -r2408a ddc14 pt2permit.dgn 09/28/2007 01:07:32 +~0 N ~ j~ M ~~n ~~F F .--''~~ 26~.~b cs ~% ~~ ~~ ~+`~' ,~F / ' i~ ~ F T ~ INV= 2015. I n E ^$ 28+i .d1 PDE ++JB W/GI 60.00 RT 7' 1" X 7'i~9" X 6' 9" W !~ 11 ~ II ~~ 28+13.9 11 aq.15~~ 11 P 4,~ NORTN CARQLINA GE A~+MENT QF TRANSPORTATION «,~~ D6 S-29 PG 2132 ~- ~~ i2 ~~ ~~ R-2408A Site 1 Station 28+05 CL Elev.: ~.~1ft Zeffype Pipe: rAe Enterence~ r~Gon of Flaw: Idrological Method: W. Gontra! Elevetian 1-8 ~_ ~ o~u~y Inlet ~ [nvertHfev.: Fi J r.w Outset Inv. Elev. Znf5.~ ,24,Z5.7~ li.W. LS, 50- •p2 re 7 f~ 't.77 ft L= p~ p _f} Permi# Drawirt~ Sheet_7 of 13 Rebls~ I~fs/t„~ STATI O N 28 + 04.97 RORDWRY ~PPROXIMRTE UPSTREAM 5 0 5 10 Feet SECTION ~',, l , i EXIST~~1G 24" PIPE Plan Summary Data Drainage Area; ~~ Design I=raq.; ~~ ~, Design DJsch.: 7'>* cis Dosign H.W. Elev.: ~,~~' g10Q Discharg.: ~G cg's Qf00 Elea: 2021. ~'~ Overtopping Ereq.: ~ ~QQ ~r Overlapping ~lsch.: i ? 0 Overtopping Elav.: zd25. b7 POSITION,,~RT UPSTRERM END ~ ~ 7 ~ ~ ~ 1 PROPOSED 64" X 43' CMPR ~T UPSTRERM END INUERT BURIED 2 FOOT TIE IN TO PROPOSED JUNCTION BOX R-2408A Site 3 Station 13+23 -Y1- Place coir fiber matting below bankfull elevation at the pipe inlet and outlet. Establish vegetation above bankfull elevation. snit ~j' ~ 13 \ ~~+et _ ._ _.....~ Rfu(sed ~0~S~1oei S~.le 1" = 30' 30' 0 30' 60' DENOTES TEMPORARY FILL IN SURFACE WATER DENOTES FILL IN SURFACE WATER ~ ~' 15 +0$.D~ } 50.00 ~ J~ ~ w ~ ~a u J I pop, 0 \ ~ ' ~ptiyew°y~ ~~ , , ' 13+b3,1$ old equipment/junk 1 ~ ~ ~6.og 1 .. ~~ ~ ~ J , ~ ""`- --- ~_.--- ~. Cdr ~ _~ ~ ~ ra. " ~~ -r2_:.~ ,.--~_ ENERGY OISSPAiOR te'~x 6'x r3~ ass ~ ~ r~r ~ EST. T TpN ^~ ~qg~ ~ ~~ QsTFF ,E,y/ _~a.~ r / bg.05 if 73 / 49. i S,~e~ `~ S )POSED. ~r~l~ W 12+ A ~ .'/, -y~~~ ~ , R-2408A Site 1 Station 28+05 Place coir fiber matting below bankfull elevation at the pipe inlet and outlet. Establish vegetation above bankfull elevation. ~rrmit D~awinp it~t_1L of 13 ~d,;se~ Wf S~~"1 Scale 1" = 30' 30' 0 30' 60' C/LLl///a DENOTES TEMPORARY FILL IN SURFACE WATER DENOTES FILL IN SURFACE WATER -r2408a ddc14 pt2permit.dgn 09!28!2007 01:14:11 P R-2408A Site 3 Station 13+23 Y1 Proposed 126' 73" x 55" CSPA I;~nnit fkawitlp .~-+~et ~ 3 of l3 ~~ 'std Io~S/7oD7 5 0 5 10 Feet PROPOSED GRADE LINE AT CENTER LINE OF EXISTING NC 2$ ~~rlx.~i+.~i'~i:'~il~ ~~~'r:'~r:~a:~ ~.,.~,.:-~:.-ii---~;; i'..:~":'~u.~•.~' ~~ ~'.".~A ~':! ~::~v,. ~-~~d~; ~Y>~;~r.~~..1:>tniA~i_ ~u.~,.i~.~+ s ~.. ~:`..ii;~.i..~C:~q:~_:~tl: ~".~} ~,. t:':lt~.,",~1sas+l ~e~:'~: ~k~`.!~ EXISTING 30 IN. PIPE _~•'• _____ __ _ _ AT ROAD CENTER LINE •' APPROXIMATE DOWNSTREAM SECTION _ r ~. ,'~, TO BE REMOVED /.~'..' ~ , ~. • PROPOSED~PIPE°. ~~ ~\~ ~' ~•'•~ APPROXIMATE UPSTREAM SECTION AT ROAD CENTER~LINE~ ` ' ,'~,~~~ INVERTS BURIED 1~'~~.,\~~ \~ ~,',~'~ ~, • ,.- SLOPE = .064 FT,/FT, ~~ --- ~---_ -r2408a ddc14 pt2permit.dgn 09128/2007 01:12:57 R-2408A Site 1 Station 28+05 Place coir fiber matting below bankfull 2m63 zm6` elevation at the pipe inlet and outlet. Establish vegetation above bankfull elevation. ~. . Pem>It ~f81MIt1Q E `. sneer 6 of i3 ~ha 2 R,ev(ud In/S~7ae~ ~ / ~ Scale 1" = 30' 30' 0 30' 60' i ~~ r~~~LLd DENOTES TEMPORARY ~~~/ FILL IN SURFACE ~ WATER ~ ,m~' DENOTES FILL IN SURFACE WATER -r2408a ddc14 ptzpermit.dgn 09/2812007 01:09;17 ~~~ ~~ ~~ hp ~ ~~ ti@m ~ ;U0 Oh N //ti A f_ ~OP~ ~ ~ N~ ~~ time ry~m~'ry~^`' m ~~~ m IS ` C ti ~~11 -, .,, , i027- e My N ~~ f ~, ¢ N E 1 '" // ti~ N _ m / a? /f ~ ~ 2®2~ J~ STIN~ti ~W `,.._ ~ ._ -~o~. ~. o a `~ 0_ p~ i ~~~~ ~~ z®14 7' 1" X 7'~I" X 6' 9" o 2013 I~ 1 /~ i ~ +I ~$~~~5~ z011--- S .~ ~~ 2 9q A5R'i ~ NORTH INA DEPA~~M Zm TRANSP ATI ~~- DB S-29 P 2 ~zeaz I~ ~2 ~~ ~ ~ \\~\~~\ ~`~~~ i --- ~20~9 ~ ~ ~ N 0 N cs~ a