HomeMy WebLinkAbout20230608 Ver 1_Corps email conf of JD_20230426Kevin Martin
From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Sent: Thursday, January 6, 2022 3:30 PM
To: Kevin Martin
Subject: SAW-2021-02536 (Chavis St. Soccer Fields) PJD Concurrence
Attachments: PJD Sketch revised - Chavis St Soccer Fields - 12-29-2021.pdf
Dear Kevin Martin,
Reference is made to Corps Action ID: SAW-2021-02536. Please reference this number on any correspondence regarding
this action.
We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e-mail, are
confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and
reliable representation of the location and extent of aquatic resources within the identified review area. The location
and extent of these aquatic resources are shown on the delineation map entitled, "Figure 3 — Sketch Map" and dated
12/29/2021.
Regulatory Guidance Letter RGL 16-01 Ihtt s: usace.contentdixn.ocllc.oir. utiills .etfiille collllectiion t.602t.collll9 iid 1.256
g Y ( ) p...........................................................................................................................! A...................�m.......................L..............................................12...........................................................�.......................
provides guidance for Jurisdictional Determinations (JD) and states, "The Corps generally does not issue a JD of any type
where no JD has been requested." Currently, we are only verifying the delineation. This delineation may be relied upon
for use in the permit evaluation process, including determining compensatory mitigation. This verification does not
address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as
such.
This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under
the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an AJD, which is ar
appealable action.
If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD)
please respond accordingly, otherwise nothing further is required and we will not provide any additional
documentation.
Due to workload volume, it may take 90 - 120 days or more for the issuance of a standalone JD; however, you may use
the delineation for planning and permitting purposes.
Thank you,
April Norton
April R. Norton
Regulatory Division
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 441-3637
Fax: (919) 562-0421
Email: Irii.Il.[1..l( Orton. .uu.s�.�� �irinny ..lnnilll