Loading...
HomeMy WebLinkAbout20230608 Ver 1_Corps email conf of JD_20230426Kevin Martin From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Sent: Thursday, January 6, 2022 3:30 PM To: Kevin Martin Subject: SAW-2021-02536 (Chavis St. Soccer Fields) PJD Concurrence Attachments: PJD Sketch revised - Chavis St Soccer Fields - 12-29-2021.pdf Dear Kevin Martin, Reference is made to Corps Action ID: SAW-2021-02536. Please reference this number on any correspondence regarding this action. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e-mail, are confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and reliable representation of the location and extent of aquatic resources within the identified review area. The location and extent of these aquatic resources are shown on the delineation map entitled, "Figure 3 — Sketch Map" and dated 12/29/2021. Regulatory Guidance Letter RGL 16-01 Ihtt s: usace.contentdixn.ocllc.oir. utiills .etfiille collllectiion t.602t.collll9 iid 1.256 g Y ( ) p...........................................................................................................................! A...................�m.......................L..............................................12...........................................................�....................... provides guidance for Jurisdictional Determinations (JD) and states, "The Corps generally does not issue a JD of any type where no JD has been requested." Currently, we are only verifying the delineation. This delineation may be relied upon for use in the permit evaluation process, including determining compensatory mitigation. This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an AJD, which is ar appealable action. If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD) please respond accordingly, otherwise nothing further is required and we will not provide any additional documentation. Due to workload volume, it may take 90 - 120 days or more for the issuance of a standalone JD; however, you may use the delineation for planning and permitting purposes. Thank you, April Norton April R. Norton Regulatory Division US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 441-3637 Fax: (919) 562-0421 Email: Irii.Il.[1..l( Orton. .uu.s�.�� �irinny ..lnnilll