Loading...
HomeMy WebLinkAbout20120830 Ver 1_Certification of Completion_201505150��� W A T�9QG � r , � —i o : �c DWQ Project No.: Z o IZ- 0 3 3 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources co�ncy: �.Jw�-� Coleen Sullins, Director Division of Water Quality Applicant: N C p.�i Project Name: Q��uctw..-� a� l�� �R�t. yyY c�uQf u i'�� �o.S..l CK on 5�- 1�l3 ( 1� PaP. S�R.2o� Date of Issuance of'401 Water Quality Certit►cation: q(���L Certi�cate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifcations, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This farm may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not , necessary to send certificates from all of these. Applicant's Certification I, �, (�, � QPj�►,7�j , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and int t of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, d oth sup ing terials. Signature: � Date: � ��7�1 �� ' Agent's Certification � ' I, � � , hereby state that, to the best of my abiliries, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. � Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Pernuttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substaritial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Intemet: httq://h2o.enr.state.nc.uslncwetiands ,� `��� V 15 D N�AY I 5 ?_ 015 An Equal OpportunitylAffirmative Action Employer — 50% Recycled110% Post Consumer Paper DENR - WATER RESUURCES 7RANSPORTATION PERMI7TING UNIT