HomeMy WebLinkAbout20120737 Ver 1_Certification of Completion_201505151 � 0
qr^tir^
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
DWR Project No:
Applicant:
Zc� t Z v 7 3�
�Dol
Donald R. van der Vaart
County: l.� (G/l �,` I l e
Secretary
Project Name: 1�{w, (9,p�. `� � vU �2.r' �a �\�-I U`�i' p,^ S R— � �3 �
401 Water Quality Certification Issued Date: `3 � � � � 1 2-
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer `
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these. .
3 ,3 �3 �f
Applicant's Certification n
I, �� R� H � p k�� 5 , 1' �' , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specif� ions and t er supporting materials.
Signature: • � . . � Date: Z / ( �j' � j
Agent's Certification ,
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Date:
Division of bVater Resources — 401 & Buffer Perrnitting Unit
1617 f�4ail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N Salisbury St, Raleigh, North Caralina 27604
Phone: �1G-807-6300 i FAX: 91G-807-6492
Internet: www.ncwaterquality.org
An Equal Op,�orturity 1 Afir^�ative Ac�on Employer- tdada in pat by recycleC paper
D ����d�
D
MAY 1 5 2015
DENR -VJATER RESOURCES
TRANSPORTATION PERMITTING UNIT