Loading...
HomeMy WebLinkAbout20120737 Ver 1_Certification of Completion_201505151 � 0 qr^tir^ North Carolina Department of Environment and Natural Resources Pat McCrory Governor DWR Project No: Applicant: Zc� t Z v 7 3� �Dol Donald R. van der Vaart County: l.� (G/l �,` I l e Secretary Project Name: 1�{w, (9,p�. `� � vU �2.r' �a �\�-I U`�i' p,^ S R— � �3 � 401 Water Quality Certification Issued Date: `3 � � � � 1 2- Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer ` Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. . 3 ,3 �3 �f Applicant's Certification n I, �� R� H � p k�� 5 , 1' �' , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specif� ions and t er supporting materials. Signature: • � . . � Date: Z / ( �j' � j Agent's Certification , I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Division of bVater Resources — 401 & Buffer Perrnitting Unit 1617 f�4ail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N Salisbury St, Raleigh, North Caralina 27604 Phone: �1G-807-6300 i FAX: 91G-807-6492 Internet: www.ncwaterquality.org An Equal Op,�orturity 1 Afir^�ative Ac�on Employer- tdada in pat by recycleC paper D ����d� D MAY 1 5 2015 DENR -VJATER RESOURCES TRANSPORTATION PERMITTING UNIT