HomeMy WebLinkAboutWQCS00312_NOI_NOV2021DV0041_Response_20210210 (5)S CITY OF KING
*J&CSoo 356
Jack Warren, Mayor
Homer Dearmin, City Manager
Scott Barrow, City Engineer
P.O. Drawer 1132
King, NC 27021-1132
Lon T. Snider, Regional Supervisor
Environmental
Receive
FEB 16 2021
Winston-Salem
NCDEQ DWR Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Re.: eleti
OV-2021-67-0044
229 S. Main Street
Telephone (336) 983-8265
Lon T. Snider:
The purpose of this letter is to respond to your letter for Permit # WQCS00350 dated 1-25-21 and
received on 2-1-21. Your letter requested that we address the causes of the SSO, remedial actions, and all
other actions taken to prevent the recurrence of this SSO.
Causes: Hurricane Zeta created a power outage, the automatic transfer switch functioned correctly and
we ran on generator power. The generator ran until one of the two belts broke. This generator is
exercised weekly and it was just bad luck that the next time it ran we had belt failure.
Remedial Actions: we had no generator replacement belts at that time for this generator, so we got a
closed business to open for us to get a standard belt. The difficult belt replacement was performed and
we got back on generator power. The generator ran again until the other belt broke. We then got the
generator company to supply us with a matching belt set for generators and the difficult belt
replacement was performed again.
Prevent recurrence actions: we now have additional matching generator belts on hand at our
maintenance shop. In the future, both belts will always be replaced at the same time and on a
schedule.
Please let me know if you have any issues or concerns with our resolutions listed above.
Sincerely, J
T. Scott8arrow, PE, PLS
City Engineer
Mayor Pro -Tern Rick McCraw Charles Allen Wesley Carter Terri Fowler