Loading...
HomeMy WebLinkAboutWQCS00025_NOI_NOV2020DV0216_Response_20200520wtt (. 10Ob1%�3 Water Resources Division 146 N Church Street PO Box iio6 Asheboro, NC 27204-iio6 May 20, 2020 CITY OF *# AsKERofu NORTH CARO LINA Tel: 336-626-1201 Ext. 258 Mr. Lon T. Snider DjI�Q 0n V e NC Department of Environmental Quality Division of Water Resources 450 Hanes Mill Rd Suite 300 Winston-Salem, North Carolina 27105 Re: Response to Notice of Violation & Intent to Issue Civil Penalty Tracking No.: NOV 2020-DV-0216 Dear Mr. Snider: Fax: 336-626-1218 NC Department of Environmental Quality Received KAY 2 6 2020 Winston-Salem Regional Office Zo21G1U7 This letter is written in response to the above referenced letter of correspondence from your office for the sanitary sewer overflows (SSO's), Incident Numbers 20200162, 2020163, and 20200164 experienced on January 24, 2020 at lift station numbers 3, 4 and 6 as a result of inflow and infiltration. Asheboro experienced extremely heavy rainfall resulting in a total amount of rainfall of 1.8 inches. Maintenance staff responded to the alarms and evaluated the sites to monitor the flows. Laboratory sampling was conducted upstream and downstream of the sites and no environmental impacts were measured. Temperature, pH, DO, Conductivity, and Ammonia sampling of the stream reveal no real environmental impact on Dissolved Oxygen (DO), pH, Ammonia (NH3), and Conductivity (Con) as illustrated in the following table for upstream (US), at the site (S) and downstream (DS) monitoring. Station DO US DO S DO DS pH US pH S pH DS NH3 US NH3 S NH3 DS Con US Con S Con DS LS # 3 10 9.9 9.8 5.6 5.7 5.7 <.15 <.15 <.15 70 69.4 61.8 LS # 4 10.1 9.9 10.2 5.8 5.8 5.8 <.15 <.15 <.15 107 93.3 94.4 LS # 6 10.4 10.4 10.4 5.6 5.6 5.7 <.15 <.15 <.15 77.2 75.3 74.8 The City has applied multiple times for CWSRF funding for an upgrade project for Lift Station # 3 and been denied An application has been submitted for the spring 2020 cycle. An engineering firm has been selected and contracted to design an upgrade for this station and preliminary surveying and planning is under way. Other funding sources will be sought if state funding isn't available. This lift station has eight sub basins that all eventually pump to this site. Each sub basin has been investigated to identify inflow/infiltration but no major sources have been identified. Home of the NC Zoological Park Response to Notice of Violation & Intent to Issue CivilPenalty 10/10/2019 Page 2 of 2 The City of Asheboro is committed to protecting the environment and improving wastewater collection service to customers. We are working from many angles to address issues that will improve the operation of our collection system. Staff is continuing flow monitoring and will be aggressive in locating potential I & I sources and making repairs. Flow monitoring in the LS # 4 basin revealed a few non -major sources of I & I that have been repaired. Flow monitoring in the LS # 6 basin has not revealed any major sources of I & I yet but the study is ongoing. The Capital Improvement Plan provides future resources for studies, repairs and replacements to the wastewater collection and treatment systems. Including these SSO's, the overall performance of our system is exemplary. The 2019 System Performance reveals .that of the more than 1.4 billion gallons of wastewater treated at the City of Asheboro W WTP; less than 0.01% was spilled at the plant or in the collection system. Laboratory personnel sample after every SSO as soon as it is safe to do so. None of the laboratory results from this SSO.event revealed significant_ environmental impact. Please take these efforts into consideration as you deliberate these matters. The City requests NCDEQ refrain from taking enforcement action as a result of these incidents. The City of Asheboro takes pride in being good stewards of the environment and is taking measures to ensure water quality in our community. Thank you for your consideration in this matter. If you have any questions, please contact me at (336) 626-1201 ext. 258. Sincerely, � Michael D..Rhoney; P.E. Water Resources Director QTY OF ASHEBOF\O WATER RESOURCES