HomeMy WebLinkAboutreport.ashxNorth Carolina Department of Transportation OF NORTH CgRO`� 9 Roadside Environmental Unit o z 0 Erosion & Sedimentation / Stormwater Report yF�JOF TRANSFO� Project Information Inspection Date: 04/25/2023 Evaluator: Thomas Smith Project #: 38356.3.2 TIP #: B-4407 Contract #: C204469 Division #: 10 County: Stanly Project Type: Contract Engineer: Monroe Resident Project Length: 0.65 Disturbed Acres: 2 River Basin: Yadkin HQW Zone: NO Trout Zone: NO Location Bridge 70 Over Rocky River on US-52 Description: Project Evaluation Report Type: ❑✓ Routine ❑ ICA ❑ ICA Ex 1st ❑ ICA Ex 2nd ❑CICA - SWO ❑ PCN ❑ ECPAR Length Section 0.65 The Entire Project Installation Maintenance Effectiveness of BMPs of BMPs of BMPs 8 8 8 Plan Overall Project Implementation Evaluation 8 8 Grading Scale: 0 - 6 = Immediate Corrective Action Required, 7 = Fair, 8 = Good, 9 = Very Good, 10 = Excellent Remarks and Recommendations: Met on site with Paul (NCDOT), William (Div 10 DEO), Dave (DWR), Ben (Reeves), and Nick (Reeves) for compliance inspection in reference to ICA issued on 4/18/23. -Causeway has been relocated to Anson County side of Rocky River to complete bridge demo. -Turbidity curtain has been installed around causeway and exposed banks on both sides of Rocky River. -Access to causeway on Anson County side of Rocky River has been stabilized with stone. -Bypass pipe has been installed for JS under bridge on Anson County side during bridge demo. -Met on site this morning to discuss bank stabilization to start on Stanly County side of Rocky River. Crews to start grading and stabilize bank with rip -rap. Once bank stabilized flood plain areas to be permanently seeded with native seed. **ICA issued on 4/18/23 has been lifted. Corrective actions from ICA have been completed. -Monitor site weekly and after each 1 inch rainfall event. -Maintain erosion control measures per weekly inspection. -Maintain turbidity curtains until banks stabilized and bridge demo is complete. 4/26/2023 3:45 PM Page 1 of 1