Loading...
HomeMy WebLinkAbout20150289 Ver 1_Approval Letter_20150514 (2)Smith, Cherri L From: Smith, Cherri L Sent: Monday, May 18, 2015 1:52 PM To: 'Ronald Fuentes' Subject: RE: AOI -Hwy 42 (DWR #15 -0289) I'm just going with what you've sent. Thanks. Cherri From: Ronald Fuentes [mailto:ronaldfCa bartletten .com] Sent: Monday, May 18, 2015 1:27 PM To: Smith, Cherri L Subject: RE: AOI -Hwy 42 (DWR #15 -0289) Cherri, You are correct, the road area and temporary work area have been reversed. I updated page 5 of the application switching the Work area with the Road fill with culvert. I apologize for the confusion. Let me know which copies I have to send you. Thanks. "1. Smith, Cherri L [ mailto:cherri.smith @ncdenr.gov] Sent: Monday, May 18, 2015 12:48 PM To: Ronald Fuentes Subject: RE: AOI -Hwy 42 (DWR #15 -0289) '• 1. • -.•• mc"TIPPOITTrf •. - 11 • -. ^• •^ •. L . • - •.• . - •• 1111 impact. • • these be reversed? • I would need the site plan to be updated. Cherri From: Ronald Fuentes [mailto:ronaldfCa bartletten .com] Sent: Monday, May 18, 2015 12:06 PM To: Smith, Cherri L Subject: RE: AOI -Hwy 42 (DWR #15 -0289) Hi Cherri, The areas listed on the revised page 5 of the application are the correct values. They are the same as what is shown on the table on the lower right corner of the site plan. The buffer impact callout was not updated. I can send you an updated one if needed. For the Temporary work area, we have extended impacts before and after the pipes as shown on the site plan to allow some space for the construction of temporary coffer dams for bypass pumping while the pipe culvert is being replaced as required for the erosion and sediment control permit. The dam will be removed and the slopes restored upon completion. I hope I have explained everything clearly and if there is anything else that you need some clarification with, just let me know. From: Smith, CheniL Sent: Monday, May 1O,Z01S11:3OAM To: Ronald Fuentes; Robinson, Jason Subject: RE: AOI-Hwy 42 (DWR#15-0289) We received the additional information here at the Regional Office on May 14. The only remaining questions that | have relate to the buffer impacts. The buffer impacts listed on the revised page 5 of the application don't match the impacts shown on the plans. Also, in the application you have the road crossing listed as a temporary impact and usually road crossings require permanent buffer impacts. The work area is listed asa temporary impact, and I'm not sure what that means. |f you could help me clarify this information, | would appreciate it. Thank you. [herh From: Ronald Fuentes Sent: Monday, May 18, 2015 9:06 AM To: Smith, CheniL; Robinson, ]ason Subject: AOI-Hwy 42 (DWR#15-0289) HiCheni&']ason, | just vxantedto check on the AO|'Hvxy4Zpn�ect VVerece�eda copy of the VVaterDetenninadonLetter last K�ay»�, then it was sent out together with the requested additional information the same day. Thanks RONALD G.FUENTE3P.E. BARTLETT ENGINEERING & SURVEYING, PC 1906 Nash Street North Wilson, NCZ7O93 252'399'0704Ext235 ernancormspmnumncmto arid onrri this m^numr/wsub�iwct to thmm.u. Public Records Law arid may bmmwc|ospd M Hi/rdpammw. Ernail corrpspondpnce to and ftorn this spndpr is subJpct to thp N.C. Public Records Law and may bp disclospd M Hwd patps.