HomeMy WebLinkAboutNC0020931_NOI_NOV2020PC0155_&_NOV2019OV0003_20200331Boonvd[e Crossroads of the Yadkin Valley March 31, 2020 Lon T Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-WSRO Dear, Lon T Snider NC Department of Environmental Quality Received APR 0 3 2020 Winston-Salem Regional Office Toam of Boonville PO Box 326 110 N. Carolina Avenue Boonville, North Carolina 27011 On behave of the Town of Boonville, I am writing a response to the Letter we received from your office dated March 17, 2020. Currently the Town of Boonville uses Mission Communication for our monitoring. We have only used it for High flow alarms along with power outages. Since we have had some miss calculations with our flow data, I have contacted Mission to see if we could add a totalizer. Mission is going to add a totalizer so I will receive it with my daily report. With this in place, we will have a back to double check our calculation. Us not having a backup ORC on record is an over sight. About 18 months ago, the Town sent Steve Hutchens to Waste treatment operator class. When he received his operator certification, he filled out the forms to be assigned to our backup ORC list. We assumed that is was documented with the State of North Carolina. Since this was brought to our attention, we found out he was not listed and since, we have resubmitted his paperwork to the State of North Carolina and faxed a copy to the Winston Salem Regional office. Town of Boonville received a SRF loan in 2017 for our waste treatment plant upgrades. During the construction, Plant #2 floated out of the ground. After the floating of Plant #2, the town board fired the engineer, Municipal Engineering, and hired WithersRavenal to finish the project. We also had an Attorney looking into litigation. Since January 2020, the contractor has been on site working to finish the plan set in place by WithersRavenal. The most current schedule is for the project to be completed by the end of April 2020. During Ron's first visit, we found out that our Effluent sampler was over sampling. Since his last visit, we worked on getting it calibrated and found that the hose was cut the wrong length. We replaced the hose to the right length, which got us very close (120ml = 150ml), but not 100% right. I contacted Eric with Clearwater about our problem. When he got on site, we started looking over the sampler to find that the liquid detector was not enabled. Once we turned that on, we ran 6 samples to find it 100% accurate. During the beginning of Construction, Plant #1 floated also, but nowhere near as bad as Plant #2. At the time, we put Plant #1 back into service the weirs of Plant #1 and Plant #2 were with in 100t6 of each Ph:336.367.7941 Fax:336.367.4205 boonvillenc.com Nlapor: Vaughn Benton; Commissioners: William Paul Bairy, Monica Craver, Richard Lasky, Justin Phillips, Tony Reece other. I assume that over the last couple of years the tank has settled a little more, which has gotten the weir level off. By the end of April, our plan is to have the weirs leveled up. I talked with our engineer about the rake arms on Plant #1, and what a possible means to address the efficiency seen by our inspector. After our discussion, the plant was designed to have the arms clear from the center to the skimmer box that is positioned on the other edge of the clarifier. The engineer did recommend that we replace the rubber flaps on the arms themselves. We should be able to do all that work at the same time we are making the changes to the weirs. If you have any questions, please do not hesitate to contact me at ieff.iones@boonvillenc.com or my cell 336.466.0887. Thank you for your time, j Director / ORC r _� ROy:COOPER Governor MICKNE4.5. RECZAN SecettiPy S. DAMEL SM171H Director NORTH,CAROLINA ,Ertviiomnentci QudJhr CERTIFIED MAIL #7017 1450 0001 6450 1211 RETURN RECEIPT REQUESTED Vaughn Benton, Mayor Town of Boonville P.O. Box 326 Boonville, NC 27011 (� _ 26 Zo -6o 35 SUBJECT: Notice of Continuing Violation of NOV-2019-OV-0003; & Additional Notice of Violation/Notice of Intent to Enforce: NOV-2020-PC-0155 Permit # NCO020931 Yadkin County Dear Mr. Benton: On March 5, 2020, Mr. Ron Boone, from the Division of WaterResources' Winston-Salem Regional Office (WSRO), performed a follow-up inspection regarding the Notice of Violation (NOV72019-OV-0003) sent August 23, 2019. During the inspection, WSRO staff noted several continued violations of NOV- 2019-OV-0003, as well as additional new violations. Copies of the follow-up inspection reports are included for your records. While onsite, the following additional violations were noted by WSRO staff and,may be included in any future enforcement action against,your facility: New Violations 1. Review of the October through December 2019 DMRs revealed several data collection/recordation errors forthe flow parameter. Corrective action: Immediately begin an in-depth examination of all flow data and the collection and calculation methods used to ascertain daily flow values to determine the extent and cause of the errors and then develop and implement corrective procedures to rectify the cause(s). Continued Violations/Additional Observations:. 1 2. None of the currently designated six backup operators work at the facility. There is therefore no backup operator properly designated as required by the permit. i y°I r b75rD Corrective action: Immediately designate at least one properly certified backup operator for the plant. 3. The second treatment train, which floated out of the ground about 2'to 3 years ago when it was drained to facilitate maintenance and resurfacing, has still not been reset and placed back in service. 10"Department ofEnvirmunental Ne:! DlvLs an r r.iD_ E Q�P win5to�lmRegonafOffel 45pw stfansmlltR6ad5oHa3OGI WhisLoti-SaieUyNortCCa[npna 27105 336.716.9000 Corrective action: Immediately make all necessary repairs to this treatment train and place it back in service. or 4. The effluent sampler is not properly programmed or set up to collect the proper size iquots for the 24-hour flow proportional composite sampling regime for which it is being used. Accordin o the operator, it draws approximately twice the amount needed for each aliquot it pulls. Corrective action: Immediately reprogram the sampler and/or make all necessary changes to it installation to enable it to begin pulling the correct size aliquots.s o� 5. The overflow weir on the secondary clarifier of the first treatment train is not level and the scum \ skimmer arm in ineffective, or at best, minimally effective. Corrective action: Immediately take the necessary steps to begin repairs to the first treatme t train's secondary clarifier to level the weir and repair the scum skimmer arm./ on - Written Please respond in writing to our office within 10 days of your receipt of this Notice describing the actions you have already taken, or propose to take, to address the violations described 'above. Your response should be sent to my attention at the address listed in the footer on page one. If you have questions or concerns regarding this Notice, please contact Ron Boone by phone at (336) 776-9690 or by email at ron.boone@ncdenr.gov. You may also contact me by phone at (336) 776-9700 or by email at lon.snider@ncdenr.gov. Sincerely, Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-WSRO Attachments: 1. BIMS Water Compliance Inspection Report cc: Laserfiche United. States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS)- Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type I 1 IN ( , 2 IS I 3 I N00020931 I11 12 20/03/05 17 18 LCj 191 c I 201 I 21II11II IIlIIIIlIlI IIIIIII I IIIIII IIIIIIIIIII I6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA -------Reserved------ I 72 I N 73II I 174 75� I I I I I I I80 67L .......... j 701 LJ I 711 liL JI I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Dale POND name and NPDES permit Number) 09:OOAM 20/03/05 19/01/01 Boonville WWTP ' Exit Time/Dale Permit Expiration Date 110 Carolina Ave - Boonville NC 27011 12:00PM 20/03/05 23/12/31 Name(s) of Onsite Representative(s)lTtles(s)/Phone and Fax Number(s) Other Facility Data Jeffrey Eugene Jones/ORC/252-639-7544/ Name, Address of Responsible OffcialRtle/Phone and Fax Number Robert Gardner,PO Box 326 Boonville NC 270110326//336-367-7941/3363674205 Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Prograr Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Ron Boone DWRNVSRO WQ1336-776-9690/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) 31 NCO020931 I11 1 20/03/05 17 18 i C i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) This is a follow up inspection from the August 2019 inspection which resulted in a Notice of Violation with Intent to Enforce. Data collection, reporting, and maintenance appears to have improved somewhat with the assistance the Town has received from the DWR Laboratory certification unit However, during this inspection Mr. Boone noted several erroneous flow meter readings on the DMRs from October thru December 2019. The erroneous data appears to be either calculation or transcription errors. This is a vioilation. The ORC reported to Mr. Boone during this inspection that the effluent sampler is still not pulling the required amount of sample for each aliquot. The ORC stated the sampler still pulls about twice as much sample as needed for each aliquot. The ORC indicated he just has not been able to get it fixed yet. Given the fact that this was also a violation noted during the August 2019 inspection, this is a continuing vioilation. The plant description lists a comminutor but there isn't one installed. The plant description should be updated to correct this mistake. The Division will not reopen a permit to update one minor errant component in the plant description, but the Town should make sure this change is made during the next permit rewrite. As was also noted during the August 2019 inspection, none of the currently assigned six backup operators work at the plant. Mr. Jones stated that Mr. Steve Hutchins is his backup operator but he is not so designated in DWR's database. Therefore the plant does NOT have a designated backup operator. This constitutes a continuing violation. It was noted during the August 2019 inspection that the overflow weir on the first treatment train's clarifier is not level and the scum skimmer arm appears ineffective, or minimally effective. The ORC stated during this inspection that nothing has been done to address these issues as of yet, which constitutes a continuing violation. This plant consists of three individual treatment trains; one circular (100K GPD), and two rectangular (50K GPD,each). One of the rectangular units floated approximately 2 to 3 years ago when it was emptied to facilitate maintenance and resurfacing. Unfortunately, the unit has not been reset and placed back in service yet, in part due to difficulties the town has experienced with the first contractor that was hired to do the work. A new contractor has now been hired. This is a continuing violation. Many components throughout the treatment process are old and quite dilapidated, and possibly as a result, ineffective, or partially so. For example the clarifier's skimmer on treatment train #1, appears minimally effective, but it's effect on the plant's overall effectiveness is unknown. As such the skimmer should be repaired to attain its maximum effectiveness as it was intended when first installed. Otherwise the unit should be removed from the treatment process, following the procedures and protocol established by DWR in approving NPDES permits. Facility dependability is questionable at this point Page# Permit: NCO020931 Inspection Date: 03/05/2020 Owner -Facility: BoonvillevwvTP Inspection Type: Compliance Evaluation Record Keeping Are records'kept and.maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing'the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operato on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified atone grade less or greater than the facility classification' Is a copy of the current NPDES permit available on site? - Facility has copy of previous year's Annual Report on file for review? Yes No NA NE ❑ M ❑ ❑ ❑ M ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ ' ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: Data collection and recordation of field laboratory data seems to have improved since the August 2019 inspection. However, review of the October thru December 2019 DMRs during this inspection revealed several errors on the data collection and recordation of flow. This process should be reviewed and refined to prevent such flow reporting errors. This is a violation. Also, none of the six currently designated backup operators work at the facility. There is currently no backup operator officially designated, as was also noted during the August 2019 inspection This is a continuing violation. Permit Yes No NA NE (If the present permit expires, in 6 months or less). Has the pennittee submitted a new ❑ ❑ 0 E application? Is the facility as described in the permit? ❑ 0 ❑ ❑ # Are there any special conditions for the permit? ❑ M ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Page# 3 I Y Permit: NCO020931 Owner -Facility: BoonvillewWTP Inspection Date: 03105/2020 Inspection Type: compliance Evaluation Permit Yes No NA NE Is the inspector granted access to all areas for inspection? ❑ ❑ ❑ Comment: Permit says there's a comminutor but there isn't. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? M ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ ❑ N Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees? ❑ ❑ ❑ Comment: None Influent Sampling Yes No NA NE # Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected above side streams? 0 ❑ ❑ ❑ Is proper volume collected? ❑ 0 ❑ ❑ Is the tubing clean? N ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ ❑ Celsius)? Is sampling performed according to the permit? 0 ❑ ❑ ❑ Comment: Influentlflow proportional composite samples are taken paced on effluent flow. Effluent sampler is not taking the correct size aliquots since at least the last inspection in August 2019. It is therefore also likely that the influent sampler is not taking the correct size aliquots Effluent Sampling Yes No NA NE Is composite sampling flow, proportional? M ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ❑ 0 ❑ ❑ Is the tubing clean? M ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ ❑ M Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type M ❑ ❑ ❑ representative)? Page# 4 Permit: NCO020931 Owner -Facility: Boonville Vw\ rP r Inspection Date: 0310512020 Inspection type: Compliance Evaluation Effluent Sampling Yes No NA NE Comment: Effluent sampler is not takinq correct size aliquots since at least the last inspection in Auaust 2019. Operator stated he has gotten the effluent sampler to collect less sample per aliquot but it still collects about twice the amount it should per aliquot. He is still working on the issue. This is a continuing violation. Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, anc N ❑ ❑ ❑ sampling location)? Comment: None Flow Measurement - Influent Yes No NA NE # Is flow meter used for reporting? E ❑ ❑ ❑ Is flow meter calibrated annually? N ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ E ❑ Comment: None Bar Screens Yes No NA -NE Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is -the unit in good condition? 0 ❑ ❑ ❑ Comment: Manual barscreen in use at time of inspection due to power being disconnected.from mechanical bar rake to facilitate ongoing construction to reset treatment train #2. Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Yes No NA NE Ext. Air Diffused ❑ E ❑ ❑ ❑ E ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ Page# 5 I Permit: NCO020931 - Owner -Facility: Inspection Date: 0310512020 Inspection Type: eocnville VWVTP Compliance Evaluation Aeration Basins Yes No NA NE Does the foam cover less than 25% of the basin's surface? ❑ 0 ❑ ❑ Is the DO level acceptable? ❑ M ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ 0 ❑ ❑ Comment: As was also noted during the Auqust 2019 inspection, the second treatment train is still out of the ground (it floated approximately 2 to 3 years ago when it was drained for maintenance). According to the ORC resetting the treatment train and placing it back in service has been delayed by difficulties with contractors and lawyers. This is a continuing violation. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? ❑ M ❑ ❑ Is the site free of weir blockage? ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ❑ 0 ❑ ❑ Is scum removal adequate? ❑ 0 ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? M ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately Y. of the sidewall depth) 0 ❑ ❑ ❑ Comment: As was also noted during the August 2019 inspection, the weirs on the clarifier of the 1 st treatment train are not level and the scum scraper arm is minimally effective. This is a continuing violation. Pumps-RAS-WAS Yes No NA NE Are pumps in place? 0 ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? 0 ❑ ❑ ❑ Comment: None Flow Measurement- Effluent Yes No NA NE # Is flow meter used for reporting? M ❑ ❑ ❑ Is flow meter calibrated annually? M ❑ ❑ ❑ Is the flow meter operational? M ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ Page# 6 Permit: NC0020931 Owner -Facility: Boonville wvvTP Inspection Date: 03/0512020 Inspection Type: Compliance Evaluation Flow Measurement 'Effluent Yes No NA NE Comment: Calibrated 11/2019. Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? ❑ ❑ ❑ Are UV bulbs clean? ❑ ❑ ❑ M i Is UV intensity adequate? ❑ ❑ ❑ Is transmittance at or above designed level? ❑ ❑ ❑ 0 Is there a backup system on site? 0 ❑ ❑ ❑ Is effluent clear and free of solids? 0 ❑ ❑ ❑ Comment: Effluent appears clear and free of solids. The permittee should indicate in their written response to this report what the backup disinfection system is in case the UV lights fail. Effluent Pipe Yes No NA NE Is right ofway to the outfall properly maintained? ❑' ❑ ❑ 0. Are the receiving water free of foam other than trace amounts and other debris? 1-1 El El If effluent (diffuser pipesare required) are they operating properly? ❑ ❑ M ❑ Comment: None Drying Beds Yes No NA NE Is there adequate drying bed space? 0 ❑ ❑ ❑ Is the sludge distribution on drying' beds appropriate? M' ❑ ❑ ❑ Are the drying beds free of vegetation? M ❑ ❑ ❑ # is the site free of dry sludge remaining in beds? ❑ M ❑ ❑ Is the site free of stockpiled sludge? 0 ❑ ❑ ❑ Is the filtrate from sludge drying beds returned to the front of the plant? E ❑ ❑ ❑ # Is the sludge disposed of through county landfill? M ❑ ❑ ❑ # Is the sludge land applied? ❑ M ❑ ❑ (Vacuum filters) Is polymer mixing adequate? ❑ ❑ M ❑ Comment: None Operations & Maintenance Yes No NA NE Page# 7 I i Permit: NCO020931 Inspection Date: 03/05/2020 Owner -Facility: Boonville WJVTP Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ❑ 0 ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable M ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are.applicable? Comment: The plant is currently under construction to reset the second treatment train in the ground. of time. The Division is concerned about the plant's future ability to effectively treat the town's wastewater to within permit limits. Standby Power Yes No NA NE Is automatically activated standby power available? 0 ❑ ❑ ❑ Is the generator tested by interrupting primary power source? 0 ❑ ❑ ❑ Is the generator tested under load? 0 ❑ ❑ ❑ Was generator tested & operational during the inspection? ❑ 0 ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? M ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? 0 ❑ ❑ ❑ Is the generator fuel level monitored? 0 ❑ ❑ ❑ Comment: None Page# 8