Loading...
HomeMy WebLinkAbout20230605 Ver 1_CAMA Application_20230427DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: David & Carol Martin PROJECT NAME: Martin Private Docking Facility 2. LOCATION OF PROJECT SITE: 809 Shoreline Dr. W adjacent to the AIWW in Sunset Beach, Brunswick County Coordinates: Latitude N 33°52'42.36" Longitude W 78'32' 10.24" 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 4/5/2023 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 3/23/2023 30 Day DWR Pre -file Deadline — 4/17/2023 Application Complete — 4/19/2023 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town of Sunset Beach Land Classification from LUP — Residential (B) AEC(s) Involved: PTA, EW, CW (C) Water Dependent: Private Docking Facility — Yes (D) Intended Use: Residential (E) Water and Wastewater Treatment: Existing - Municipal Planned - NIA (F) Type of Structures: Existing - Single family residence, two -slip docking facility Planned - Two -slip docking facility extension (G) Estimated Annual Rate of Erosion: NIA 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Uplands NIA N/A 30 sq. ft. (B) Vegetated Wetlands N/A N/A 1,350 sq. ft. (Shaded) (C) Open Water NIA N/A (In'corporated) (D) Total Area Disturbed: 7,902 sq. ft. (.18 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA; HQW Open: No 8. PROJECT SUMMARY: The applicant proposes to replace and extend an existing 2-slip docking facility to the established pier -head line to access deeper water along the AIW W in Sunset Beach. Martin Private Docking Facility April 22, 2023 Page 2 9. PROJECT DESCRIPTION The proposed project is located at 809 Shoreline Dr. W in Sunset Beach, Brunswick County. Existing structures on the 1.39-acre parcel include a single-family residence and an existing two -slip docking facility. Based on DCM records, General Permit No. 39038D was issued on 7/30/04 for a two -slip docking facility that included a 6' x 339' access pier, 14' x 18' gazebo, 4' x 45' finger pier, 6' x 12' floating dock, and two 10' x 10' boathouses. Reissued General Permit No. 39855D was authorized on 1/20/05. Existing structures include a 6' x 332' access pier, 12' x 19' gazebo, 5' x 16' open platform, 6' x 9' finger pier, 8' x 16' floating dock, and two 13' x 13' open boatlifts. No permit history can be found for the existing design but based on historical imagery, it appears the current layout was built by the previous owner around the time of the 2005 reissued General Permit. The south facing property is located approximately 10' above normal high water (NHW) and is vegetated with typical coastal -plain tree species and landscaping ornamentals. The property has approximately 131 linear feet of shoreline frontage along the southern edge and is stabilized with natural vegetation. The adjacent riparian parcel to the east is 807 Shoreline Dr. W and has a residential structure and a private docking facility. The adjacent riparian parcel to the west is 811 Shoreline Dr W and has a residential structure and a private docking facility. To the north of the applicant's parcel is Shoreline Dr. W. No Section 404-type wetlands appear present within the project area. High marsh, primarily consisting of Black Needlerush (Juncus roemerianus) and Salt Meadow Cordgrass (Spartina patens): extends approximately 10' waterward of high ground and transitions to approximately 210' of Smooth Cordgrass (Spartina alterniora). The width of the waterbody measures approximately 540' from marsh to marsh in the vicinity of the project area. The waters of the AIWW are classified SA by the Division of Water Quality and ARE designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to replace and extend an existing 2-slip docking facility to the established pier -head line to access deeper water along the AIWW in Sunset Beach. The applicant proposes to remove the existing access pier and rebuild a new access pier originating from the same high -ground location. The proposed 6' x 332' access pier would start on the high ground and extend south across approximately 10' of high marsh. From the NHW line, the access pier would continue south approximately 212' over a stand of Smooth Cord Grass (Spartina alterniflora). From the waterward edge of Coastal Wetlands, the access pier would extend approximately 90' into the AIWW before reaching the existing 6' x 8' finger pier on the east side of the access pier. The access pier would continue south another 10' and terminate at the existing 17' x 16' fixed platform with a 12' x 19' roofed portion (See Sheet 2 of 4). As proposed, a 6' x 20' access pier extension would continue south beyond the existing 17' x 19' fixed platform and terminate with a proposed 12' x 12' fixed platform with a 6' x 13' roofed portion located at the established pierhead line between 709 Shoreline Dr. W and 811 Shoreline Dr. W. To the west of the proposed fixed platform, a relocated 13' x 13' open boatlift would be installed at the established pierhead line (Slip #2, See Sheet 3 of 4). To the east of the proposed fixed platform, the relocated 8' x 16' floating dock would be oriented perpendicular to the shoreline and provide access to a relocated second 13' x 13' open boatlift on the east side of the floating dock (Slip #1, See Sheet 3 of 4). The floating dock and eastern boatlift (Slip 41) would be accessed from a proposed 6' x 8' finger pier and gangway located on the east side of the proposed 6' x 20' access pier extension. The applicant states that extending the docking facility to the established pierhead line would allow him to reach navigable water depths throughout the tidal range and minimize soft -bottom impacts to the Primary Nursery Area (PNA). Martin Docking Facility Extension April 22, 2023 Page 3 The property has approximately 131 linear feet of shoreline and the proposed design appears to remain within the applicant's area of riparian access; no waivers would be required for the proposed project and no waivers were obtained by the applicant. The applicant's design extends waterward of the'/4 width limit but remains landward of both the 1 /3 width and the USACE Federal Channel Setback (See Sheet 2 of 4). The applicant proposes to extend to the pierhead line established between 709 Shoreline Dr. W (State Permit #22-18) and 811 Shoreline Dr. W (GP# 66385D). Water depths taken by DCM staff at 2:45pm on 4/5/23 in the location of the existing boatlift and floating dock ranged from -0.5' NLW (-0.2' NLW adjusted) on the landward edge of the floating dock to -0.7' NLW (-0.4' NLW adjusted) on the waterward edge of the floating dock. Water depths taken by DCM staff at the proposed location ranged from approximately -0.9' NLW (-0.6' NLW adjusted) at the landward edge of the proposed floating dock to -1.6' NLW (-1.3' NLW adjusted) at the waterward edge of the proposed floating dock. The applicant proposed to install physical stops at 18" above substrate under the relocated floating dock and to also set the boatlift limit switches to stop at 18" above the substrate. As proposed, the docking facility would extend approximately 151' from the edge of Coastal Wetlands to approximately 27% of the waterbody width. 10. ANTICIPATED IMPACTS The proposed docking facility would result in the shading of approximately 1,350 sq. ft. of Coastal Wetlands and the incorporation of approximately 6,522 sq. ft. of Estuarine Waters and Public Trust Area. As proposed, the docking facility would be located in an area with water depths ranging from -0.6' NLW to -1.3' NLW (when adjusted) within a Primary Nursery Area. The applicant has proposed to set limit switches to 18' above substrate on the relocated boatlifts and install physical stops at 18" above substrate under the relocated floating dock to reduce soft bottom impacts. The proposed development would be located outside of both adjacent 15' riparian corridor setbacks. The proposed docking facility would be constructed at the established pierhead line which is beyond the'/4 waterbody width but landward of the 1 /3 waterbody width and the USACE Federal Channel Setback. Minor increases in turbidity should be expected during piling installation. The square footage of the proposed docking facility is calculated as follows: Shoreline length = 131ft. x 8 sq. ft. =1,048 sq. ft. allowable. Existing Structures Existing Fixed Platform with Partial Roof = 17' x 16' (12'x19' Covered) = 336.5 sq. ft. Existing Finger Pier = 6' x 8' = 48 sq. ft. Existing Floating Dock (to be relocated) = 8' x 16'. = 128 sq. ft. Existing Open Boatlifts (2x) (to be relocated) =13' x 13' x 2 = 338 sq. ft. (Not Counted) Total (Existing) = 513 sa. ft. Proposed Development Access Pier = 6' x 322' =1,932 sq. ft. (Credit) Proposed Access Pier Extension = 6' x 20' =120 sq. ft. (Credit) Proposed Finger Pier = 6' x 8' = 48 sq. ft. Proposed Fixed Platform with Partial Roof = 12' x 12' (6' x 13' Covered) =156 sq. ft. Total (Proposed) = 204 sq. ft. TOTAL DOCKING FACILITY SQUARE FOOTAGE = 717 sq. ft. Submitted by: Brendan Brock Date: April 22, 2023 Office: Wilmington 809 Shoreline Dr. W (Martin Docking Facility) Brunswick County Project Narrative The applicants, David and Carol Martin are applying for a CAMA Major Permit to rebuild and extend an existing docking facility at 809 Shoreline Dr. W in Sunset Beach (Brunswick County). The existing docking facility includes: (2) 13' x 13' Boat Lifts 8' x 16' Floating Dock 6' x 9' Bump out Access 6' x 332' Pier 17' x 16' Fixed Platform with Partial Roof Coverage 12' x 19' The proposed docking facility will include the following structures: Relocate (2) 13' x 13' Boat Lifts Relocate/Replace 8' x 16' Floating Dock Add 6' x 8' Bump Out Access Replace 6' x 332' Pier and add 6' x 20' Extension Add 12' x 12' Fixed Platform with Partial Roof Coverage 6' x13' ThBpt-ojectpt-oponent hereby cerlifrex that all ittjnr cation contained herein is hue; acctavle and complete to the best of my, knowledge and belief The pojectpr-oponent hereby. mxptests that the certifying authori(v revie►v and take action on this CTIA 40I certif tcation request within the applicable reasonable period of time. MNV, IBM W 1 APPLICATION for Major Development Permit post revlssid 12127I06j I� North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ Landowner Information Business Name NIA Project Name (if applicable) Mat -tin Docking Facility Applicant 1: First Name David MI Last Name Martin Applicant 2- First Name Carol MI Last Name Martin If additional applicants, please attach an additional page(s) with names listed. Mailing Address 809 Shoreline Dr. W. PO Box NIA City State NC Su Sunset Beach ZIP Country Phone No. 919-491-5633 FAX No. 28468 USA - ext. N/A Street Address (if different from above) city State ZIP SAME S ABOVE Email lieyddnc@yahoo.corn 2. AgenUContractor Information Business Name CPG, LLC Agent/ Contractor 1: First Name MI Last Name Ben B Brink Agent/ Contractor 2: First Name N/A MI NIA Last Name N/A Mailing Address PO Box City State N/A 1661 Carolina Beach NC ZIP Phone No. 1 91 0-302-5725 Phone No. 2 NIA 28428 USA - - e: ex1. FAX No. N/A Contractor # N/A Street Address (if different from above) NIA city N/A State NIA ZIP - N/A Email ben@coastalpermitguy.com Form continues on back> RpVf-VVED 25'l•tipb•28QES 9-8$tg •1i;GL7AS1 www.nccoastalarizr=agrrt:w rtrtq°j +��M WILMlNGTON, Nr Fonn DCM MP-1 (Page 2 of 4) APPLICATION for Nlajor Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 809 Shoreline Dr. W. NIA Subdivision Name City State Zip NIA Sunset Beach NC 28468 Phone No. _ 919-491-563e� Lot No. (it many, attach additional page with fist) L-13 a. In which NO river basin is the project located? b. Name of body of water nearest to proposed project Lumber AI W W c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site, KNatural ❑Manmade ❑Unknown AIWW e. Is proposed work within city limits or planning junsdiction? f. If applicable, list the planning jurisdiction or city limit the proposed XYes []No work falls within. Sunset Beach 4. Site Description a. Total length of shoreline on the tract (h.) 13 1 t b. Size of entire tract (sr).ft.) 60548.4 e c. Size of individual lot(s) 1.39 60,548.4 sq. ft. d- Approximate elevation of tract above NHW (norrnal high water) or acres or NWL (normal water level) (If many tot sizes, please attach additional page with a list) 10t E)NHW or ❑NWL e. Vegetation on tract Upland trees, shrubs and manicured lawn. Coastal Wetlands including spartina alterniflora f. Man-made features and uses now on tract Single Family Home and Docking Facility g. Identify and describe the existing land uses adjacent to the proposed project site. Singles family homes with existing docking facilities h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) MR2 ❑Yes ❑No ]QNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes XjNo k- Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No RNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No RNA National Register listed or eligible property? <Form continues on next pager RECEIVED %MWILMiNGTONr No Form DCM MP-9 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? 1QYes ❑No (W Are there coastal wetlands on the site? Ryes ❑No (iii) If yes to either (i) or (ij) above, has a delineation been conducted? ❑Yes CqNo (Attach doc(imentation, if available) n. Describe existing wastewater treatment facilities. Brunswick County o. Describe existing drinking water supply source. Brunswick County p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovernment NPrivateiCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. Recreational boating and fishing c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard marine construction for piling installation. Work from barge in open water and light foot traffic in marsh for work on pier. d. List all development activities you propose. Relocate boat lifts and floating dock further waterward to meet neighboring pier headline. Add 12' x 12' fixed platform with partial roof coverage. Repair/replace pier and existing structure as necessary. e. Are the proposed activities maintenance of an existing project, new work, or both? Both I. What is the approximate total disturbed land area resulting from the proposed project? KSq.Ft or ❑Acres g- Will the proposed project encroach on any public easement, public accessway or other area ❑Yes (ANo ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NIA i, Will wastewater or stormwater be discharged into a wetland? []Yes D4No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No MNA j. Is there any mitigation proposed? ❑Yes ❑No JjNA If yes, attach a mitigation proposal, <Form continues on backs RECEIVED . . . .. , , APRA 9 2023 VCM WILMINGTON, NC Form DCA4 MP-1 (Page 4 of 4) APPLICATION for Major Development Pennit 6. Additional Information In addition to this completed application form, fMP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (n are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c- A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastat Management. Name Mark and Heather Coley Phone No. Address 811 Shoreline Dr. W. Sunset Beach, NC 28468_ Name James and Martha Schofield Phone No. Address PO'BOX 13559 Florence, SC 29504 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA No. 39855D - William Hunt - Issued January 2005 (Complete Reissue) CAMA No. 39038D - William Hunt - Issued July 2004 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j- A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. i certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Mar 10, 2023 Print Name David Martin Mk'1W AaH11!1 Signature 1"11,1 Mar l0,002317.43 EST, Please indicate application attachments pertaining to your proposed project. [DCA4 MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM NIP-3 Upland Development NDCM NIP-4 Structures Information RECIE111. 1 g ml 7' 5 2 -8 0 8 - 2 8 0 6 ,. 1.888-4RCOAST .. www.nccaastatmaif +^y[eAmwant'.Ane�jt�+T *t !40 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for LAMA Major Permit, Form DCK1 MP-1. Be stfre to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINACHARACTERISTICS a- (i) Is the docking facility/marina, ❑Commercial ❑Public/Govemment MPrivatelCommunity c. (1) Dock(s) and/or pier(s) (ii) Number I (iii) Length 352 (iv) Width 6' (v) Floating []Yes EjNo ❑ This section not oppllcoble b. (i) Will the facility be open to the general public? ❑Yes NNo d. (i) Are Finger Piers included? ❑Yes (KNo If yes: (I!) Number (iii) Length (iv) Width (v ing ❑Yes ❑Na e. (I) Are Platforms included? DQYes ❑No f. (i) Are Boatlifts included? NYes ❑No If yes: If yes: 2 Fixed Platforms (ii) Number S 6' x 9' (ii) Number (iii) Length -T6r 17' x 16' (iii) Length 13' (iv) width 8' 6' x 8' (Iv) Width 13' (v) Floating NYes ❑No 12' x 12' Note. Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing 2 Relocated i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ]QOpen water; no dredging required ❑Other; please describe: k- Typical boat length: 22' m- (i) Will the facility have tie pilings? [-]Yes 1KNo (ii) If yes number of be pilings? h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies 2 N Dockage ("wet slips") only, number of slips: ❑ Dry storage, number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the faciliV be open to the general public? ❑Yes INNo LCiti' ;:S.�G.'.#it7ti 1•BfiU-`!1{i",ti�r1 ,.j. , Lt'�'ti'WJtii1 . .. i5ta1i tdjl ifjcfi,4�t12wnet Ny 1; '' `{-',XAG �cM� Form D CM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons, Number: - Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: RMIS section not applicable b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge" signs proposed. (ii) Give the location and number of'Fumpout Available" signs propose . f. Describe the special design, it applicable, for containing indu rial iype pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be dis sed of? h- Give the number of channel ma/.rdWake' signs proposed- i. Give the location of fuel-handlindescribe the safety measures planned to protect area water quality. j. What will be the marin71V on overnight and live -aboard dockage? k. Describe de n measures that promote boat basin Flushing? I. /this project is an expansion of an existing marina, what types of services are currently provided? PR 9 9nM 252.808.2808 :: 1.588-4RCOAST net ®CM W1�M1NG`��N r Form DCM MP-4 (Structures, Prscge 3 of 4) rn Is the marinaidocking facility proposed within a primary or secondary nursery area? Yes ❑No n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlandslmorsh submerged aquatic vegetation (SAV), shell bottom (SO), or other wetlands (WL)? If any boxes are checked, provide the numb square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaldocking faci , sated within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and ess of the leaseholder(s), and give the proximity to the lease. 3, BOA THOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s), ❑Commercial ❑PubliclGovernment ❑Private/Comm unity (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dapline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. it a rock groin, use UP-2, Excavation and Fill.) / 14This section not applicable o, (i) Nuisibei (i i) Length / (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) a. Length c. Maximum distance beyond NHW, NWL or wetlands NThis section not applicable Average distance from NHW, NWL, or wetlands 6, MOORING PILINGS and AUOYSThis section not applicable a. Is the structure($)' b. Number ❑Commercial ❑Publie/Governme ❑PrivatelCommunity C. distance to be placed beyond oreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be me red from marsh edge, if present_ e. ArcXthe swing 252-808-2808::1-tSBE3-4RCOAai" vfww.nccoasl---nn;rmmilnt,net jalsevie® pVR 19 nZ3 DOM Farm DCM MP-4 (structures, Page 4 of 4) 7. GENERAL a. Pfoximityof structures) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. Approx. 19' and 42' Approx. 77' and 56' Note: For buoy or mooting pffing, use arc of swing including length of vessel. c. Width of water body 522' e. (i) Will navigational aids be required as a result of the project? ❑Yes NNo ❑NA (ti) If yes, explain what type and how they will be implemented. NIA s. OTHER d. Water depth at waterward end of structure at NLW or NWL -2.67' @ NL W ❑This section not applicable a. Give complete description: The applicants, David and Carol Martin are applying for a CAMA Major Permit to rebuild and extend an existing docking facility at 809 Shoreline Dr, W in Sunset Beach (Brunswick County). no xi in dockinp facility includm (2) 13' x 13' Boat Lifts S' x 16' Floating pock 6' x 9' Bump out Access 6' x 332' Pier 17' x 16' Fixed Platfonp wilh Partial Roof Coverage 12' x 19' The proposed docking facility wilt include the followinagtructuro: Relocate (2) 13' x 13' Boat Lifts Date Add 6' x g' Bump Out Access Replace 6' x 332' Pier and add 6' x 20' Extension Add 12' x 12' Fixed Platform with Partial Roof Coverage 6' x 13' Mar 10, 2023 Martin Docking Facility Project Name David Martin Applicant NameY',/ David Nar6fn (MMaarri%2D23 37:43 E5T) Applicant Signature ,�"-- 252.808.2t3Ut3 :: 4-QAt3-4iiCt7AST ;: Plt]'Y.d�1�44s"+��iLtlzn�' S�cSl}.€�f]e� revised: 92!27:'4G 3/17/23, 9:39 AM Coastal Permit Guy LLC Mail - 809 Shoreline Dr. W. Sunset Beach Martin Docking Facility DWR Prefile 17March2023 Gma i l Ben Brink <ben@coastalperrnitguy.com> 809 Shoreline Dr. W. Sunset Beach Martin Docking Facility DWR Prefile 17March2023 1 message Ben Brink ben@coastalpermitguy.com> Fri, Mar 17. 2023 at 9:37 AM To: 401 PreFile@ncdenr.gov See attached. Coastal Permit Guy, LLC (910)302-5725 Helping you get your work done! COASTAL P E R M I T GUY MF' 809 Shoreline Dr. W_DWR Profile rch2023.pdf 217Ma 741K R.cmVEID APR 19 Zoz3 oCMV�1��ti��iA�r https:llmai Lgoogle. comlmaillull !?ik=80d48a8Od 2&view=pt&search=all&permthid=th read-a:r-4065179648593339822&simpl=msg-a:r-71927217340055... 111 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director SENT VIA EMAIL CPG, LLC c/o Ben Brink PO Box 1661 Carolina Beach, NC 28428 SENT VIA EMAIL NORTH CAROLINA Environmental Quality April 24, 2023 RE: CAMA Major Development Permit Application — Martin Private Docking Facility Dear Mr. Brink: The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for David and Carol Martin, for State approval for the construction of a two -slip docking facility, located 809 Shoreline Dr. W, Sunset Beach, Brunswick County, NC. It was received complete April 19, 2023 and appears to be adequate for processing at this time. The projected deadline for making a decision is July 3r1, 2023. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from April 191h, 2023 you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, '-1 Brendan Brock Field Representative cc: Cameron Luck, MHC Katie Atkins, LPO WIRO DCM USACE Holly Snider, DWR David and Carol Martin, Applicants .Q>� er :r , s:Mer:t : rtrrn�trie r , 4 s n �� }N7mrrgTDr. O+. cr 127 Cardinal 7r;,e e-!1 ROY COOPER Governor ,..rr NORTH CAROLINA ;lll'1rUFllI7P7}f(7I Ulf[7IIIy' April 26, 2023 StarNewsLegals@Gannett.com 2 Pages Star News Legal Advertisement Section Re: Major Public Notice for: • Jordan & Courtneay Overbee • David & Carol Martin Hello: Please publish the attached Notice in the Sunday, April 30, 2023 issue. ELIZABTH BISER Secretary BRAXTON DAVIS Dweelor, Division ojCoamai Management The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226 (Customer No, 489895). Thank you for your assistance in this matter. 4an cerely, U�q yat tila Permitting Support & Customer Assistance cc: MHC Files Cameron Luck — MHC USACE State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following applications were submitted for a development permit in Areas of Environmental Concern as designated under the CAMA: On April 22, 2023, Jordan and Courtneay Overbee proposed to install a three (3) slip docking facility at the established pier head line at 2581 Seashore Dr. SW., adj. to the AIWW in Supply, Brunswick County; And on April 23, 2023, David and Carol Martin proposed to replace & extend an existing two (2) slip docking facility to the established pier head line at 809 Shoreline Dr. W, adj. to the AIWW in Sunset Beach, Brunswick County. Copies of these applications can be examined or copied at the office of Brendan Brock N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910) 796-7226 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to May 21, 2023 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. (AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: David and Carol Martin Mailing Address: Phone Number: Email Address: 809 Shoreline Dr. W. Sunset Beach, NC 28468 919-491-5633 heyddnc§yahoo.com I certify that I have authorized CPG, LLC Agent 1 Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: at my property located at $09 Shoreline Dr. W. in Brunswick County. Docking Facility 1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: P1111RAWYi11 David Martin (Mar 10, 2023 17A3 r57) Signature David Martin Print or Type Name Property Owner Title 3 110 12023 Date This certification is valid through 3 110 12024 VISCO V) MNR23IZ13 3/23123, 8:58 AM USPS.comO - USPS Tracking® Results USPS Tracking' Tracking Number: 70202450000063089873 i Copy Add to Informed Delivery (https://informeddelivery.usps,com/) Latest Update g FAQs aECIEI `, fH LSD APR 19 2023 ®cM WIC-MINWON' NG Your item was picked up at the post office at 9:55 am on March 22, 2023 in FLORENCE, SC 29505. Get More Out of USPS Tracking: USPS Tracking Pluse Delivered Delivered, Individual Picked Up at Post Office FLORENCE, SC 29505 March 22, 2023, 9:55 am Available for Pickup FLORENCE, SC 29505 March 22, 2023, 9:05 am Arrived at Post Office FLORENCE, SC 29501 March 22, 2023, 7:34 am Departed USPS Regional Destination Facility COLUMBIA SC PROCESSING CENTER March 21, 2023, 1:52 pm Arrived at USPS Regional Destination Facility COLUMBIA SC PROCESSING CENTER March 21, 2023, 10:24 am Arrived at USPS Regional Facility CHARLOTTE NC DISTRIBUTION CENTER March 21, 2023, 1:33 am Departed Post Office CAROLINA BEACH, NC 28428 March 20, 2023, 4:40 pm postal Ir Emm r� "wpm h- l t n...a W-,aw tM IT ru LA. fAR Remove X 13ftWA � �blow�s prr a ww. av+ I V 590 9402 656010?0 D200 W r USPS in possession of item 7020 2+ISg Of}DO 6308� 09973_'"CAROLINA BEACH, NC 28428 ,,3611.�ty2 *O0o-00� �^ March 20, 2023, 3:18 pm https://tools.usps.com/go/TrackContirmAr-tion?_gl=1*1 nru6ll*_ga*MTQ2MDQ5NjQ3MS4xNjM5ND14MTcz'_ga_3NXP3C8S9V*MTY30TU3Njl50C4y0... 1/2 ■ c PWA Kona 1, 2, tM Haase )( r RK4 yd+ r-4" end oddre sa M ari Vad pro uy, r�t:�n t>a terd 19 y[7u. � r Atfach M wd t0 to perk d tree n� • or c "wire ' A*O* s pox 135 5 noj,e tcje C Sod III'11`114:Illl�l�lliilllll:!11111i11i �� 3/23123, 8:59 AM USPS.com® - USPS Tracking® Results USPS Tracking° Tracking Number: 70202450000063089880 i Copy Add to Informed Delivery (https://informeddelivery.usps.com/) Latest Update FAQs > RECENFn AIR 19 ZOV ®CIA WILMINGTON, i4C Remove X Your item was delivered to an individual at the address at 1:20 pm on March 22, 2023 in SUNSET BEACH, NO 28468. Get More Out of USPS Tracking: USPS Tracking Plus® Delivered Delivered, Left with Individual SUNSET BEACH, NO 28468 March 22, 2023, 1:20 pm Out for Delivery SUNSET BEACH, NO 28468 March 22, 2023, &36 am Arrived at Post Office OCEAN ISLE BEACH, NO 28469 March 22. 2023. 8:25 am Departed USPS Regional Facility FAYETTEVILLE NO DISTRIBUTION CENTER ANNEX March 22, 2023, 3:39 am Arrived at USPS Regional Facility FAYETTEVILLE NO DISTRIBUTION CENTER ANNEX March 21, 2023, 8:30 am Arrived at USPS Regional Facility CHARLOTTE NO DISTRIBUTION CENTER March 21, 2023, 1:33 am Departed Post Office CAROLINA BEACH, NO 28428 March 20, 2023, 4:40 pm USPS in possession of item CAROLINA BEACH, NC 28428 March 20, 2023, 3:17 pm U.S. Foetal rnriGC. _ https://tools.usps.com/go[TrackConfirmAction?_gl=l*srmrxu'_ga*MTQ2MDQ5NjQ3MS4xNjM5ND14MTcz*_ga_3NXP3C8S9V*MTY30TU3Njl5OC4yO... 1/2 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: David and Carol Martin Address of Property: 809 Shoreline Dr. W. Sunset Beach, NC 28468 Mailing Address of Owner: Same as above Owner's email: heyddnc@yahoo.com Owner's Phone#: 919-491-5633 Agent's Name: Ben Brink (CPG, LLC) Agent Phone#: 910-302-5725 Agent's Email: ben@coastalpermitguy.com ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions, must be provided „with this letter. j/ I DO NOT have objections to this proposal. I DO have objections to this proposal !f you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. DCM representatives can also be contacted at (910) 796-7215. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setback Signature of Adjacent Riparian Property Owner I do not wish to waive the 15' setback requirement (initial the blank) f}-!�_ Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: James or Martha SC ofield Mailing Address of ARPO: PO Box 13559 Florence, SC 29504 ARPO's emai/jl/�(J�i��iGirIUPO's Phone#: Date: t ` () V giver is valid for up to one year from ARP 's Signature* Revised July 2021 APR 0 3. 202'} OCM Wli.MINGTON., NG lllllllllll �I 1II IIII��IIIIIl I Brend ��VWMons PROP Brunswcc tY. NC Repistor of Duds page 1 of 3 Brenda M. Clesmons Reglstar of Deeds 04-20-2018 15:21:58.002 Brunswick County, NC NC REVEWE STAPFP: $1340.00 0578970) aetum to 'tYve Total Int. Ck j _ J4,,3Q Ck 1 _4g2 aCuh d Aetund Cash 1________YManoa ..a Portions of document are illegible due to conditlon of oiginei. 9oocument contains seals verified by arlghM rnstn,ment that cannot be reproduced or copied. This instrument prepared by BaxleySmithwick PLLC, licensed North Carolina attorneys. Delinquent taxes, if any, to be paid by the closing attorney to the Brunswick County Tax Collector upon disbursement of closing proceeds. NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $1,340.00 Tax Parcel #255 LA 017 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK THIS DEED, made this the day of April, 2018, by and between J. WILLIAM HUNT and wife, ANN HUNT, of Post Office Box 1636, Irmo, SC 29063, parties of the first part, hereinafter referred to as Grantors, and DAVID MARTIN and wife, CAROL MARTIN, of Post Office Box 1266, Hillsborough, NC 27278, parties of the second part, hereinafter referred to as Grantees; WITNESSETH: THAT Grantors, for a valuable consideration paid by Grantees, the receipt of which is hereby acknowledged, have and by these presents do grant, bargain, sell and convey unto Grantees, their heirs and assigns, in fee simple, those certain tracts or parcels of land situated in the Town of Sunset Beach, Shallotte Township, Brunswick County, North Carolina, and being more particularly described as follows: FIRST TRACT: BEING all of Lot 13, Western Section E, Twin Lakes Subdivision, according to a map retarded in Map Book 6 at Page 20 of the Brunswick County Registry. SECOND TRACT: Beginning at a point in the northern line of the Intra-Coastal Waterway, said point being North 84 degrees 40 minutes East 846.29 feet from the intersection of the western line of Lot 1, extended with the northern line of said waterway (Lot 1, as shown on a map recorded in Map Book 6 at Page 20, Records of Brunswick County); thence from said beginning point North 3 degrees 22 minutes East 291.36 feet to the Southwest corner of Lot 13; thence North 50 degrees 22 minutes East 129.78 feet to the Southeast corner of Lot 13; thence South 5 degrees 51 minutes West 368.7 feet to the northern line of said waterway; thence with the said waterway South 84 degrees 40 minutes West 79.79 feet to the point of beginning; the distance from the lot to the waterway were calculated. The area described is the marshland lying South of the southern line of Lot 13, Western Section E in Twin Lakes, and extending in a southerly direction to the northern line of the Intra-coastal Waterway. RECEIVED An 19 ?0?3 DrM WILMINGTON, NG 11II I III I IIII I I1IM� E III �I II �I�I �II gM � M. fC'ewmons'68'PROP Brunswick County, NC Register of Deeds page 2 of 3 THIRD TRACT: Beginning at an iron pipe in the southern line of Shore Line Drive, and at the northwest corner of Lot 13 as shown on a map entitled "Revision and Extension of Western Section E Twin Lakes Development" and recorded in Map Book 6 at Page 20; thence from said beginning point North 17 degrees 40 minutes West a projection of the western line of said lot 113.81 feet to an iron pipe in the southern line of said road's new location; thence with said line North 69 degrees 41 minutes East 46.25 feet to an iron pipe; thence South 33 degrees 22 minutes East 110.66 feet to an iron pipe in the southern line of said road as appears on said map; thence South 65 degrees 59 minutes West a chord of 70.7 feet to the point of beginning, and being all of the land between the old location of said road and the new location by projection of the two side -lines to intersect the southern line of the newly located Shore Line Drive. For back reference see Book 1986 at Page 984, Brunswick County Registry. In accordance with NCGS Section 105-317.2, the mailing address of Grantors and Grantees are as stated above. The property herein conveyed does not include the primary residence of Grantors. TO HAVE AND TO HOLD the aforesaid tracts or parcels of land and all privileges and appurtenances thereunto belonging to Grantees in fee simple. AND Grantors do hereby covenant with Grantees that Grantors are seized of the premises in fee simple, that they have the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantors will warrant and defend the title against the lawful claims of all persons, whomsoever, subject to the following exceptions: utility easements of record, street rights -of -way, restrictive covenants of record, applicable zoning or other ordinances, and 2018 and subsequent years' ad valorem property taxes. IN WITNESS WHEREOF, Grantors have caused this instrument to be duly executed, the day and year first above written. ,PWILLIAM HUNT ANN HUNT NIINIIIIII�IIIIIIIIIII nIIIIN�I� s4!44 t8798 ons PROP STATE OF NORTH CAROLINA B`"'a"'°k °oi"'t''' R`°f° e' °f oe.da P°9a 3 of 3 COUNTY OF BRUNSWICK I certify that the following persons appeared before me this day, each acknowledging to me that they voluntarily signed the foregoing document for the purposes therein stated and in the capacity therein indicated: J. William Hunt and wife, Ann Hunt. Date: April —L—, 2018 Jf�yt*aa Regina . Jenkins, N ry Public . NOrpRY.rE My Commission Expires: July 11, 2018 p;11300 d cf a` a,�a�CK Cgt1�!;ra* APR 19 20D DCM WILMINGTON, NC 809 Shoreline Dr. W (Martin Docking Facility) Brunswick County Location Map t hr 5 min (54.3 miles) .� $ via H:ry 17 Sr Ocean riw'y r fa'ate l route now due to traffic conditions 127 Cardinal Dr Exn 'r'r �:rnu7ylurt friLki6� ) Fallow N Cardinal Dr/Cardinal Or Em to Markel St 1 ,. r., .n, ) Take US-74 WIMarlin Luther King Jr Pkwy and Hwy 17 SJOcean Hwy F to Ocean Isle Beach Rd SW in Brunswick County :, ,Z.: -, ) Continue on Ocean Isle Beach Ftd SW Take Old Georgetown Rd SW and Sunset Blvd N to Shoreline Or W in Sunset Beach I.I! , 809 Shoreline Dr W 01 11) NZ3 t)CM W,L-M1%G-T0", Nr- vtscf PI Q` � M N M N M N M , � CA h 00 00 00 O O O O OO O d + + + + + + + a w A b v .n A ." N EA �a �a Vl n 00 N c� U U U U H A 0 Q Q Q Q Q Q O .-i APR 19 20D C)CM 1N4L.MINCi®N, NO ON `NOl9N "WO® Ezu 6 I My UiWBOB (AH-100) M'�OaugaiNs Iis £Z/VI/£ (Pagu—) kop—g P-IlaA £Z/bI/£ (PaguaA( £Z74I/£ (P-3uanun) f-p-.El P-PP .61 xlzl ;ooH FBPnd /m uuopeld pa)q jai ssaaoV Ino dw voa 8upeo1 51P. I MOO .£I :SaIIn=n MMIYJO tPP!M E/I (GISHOHOS) A . G aml—gS L08 ,faAlnS O IO,Vx T mml�d 09:1 aleoS N lr4unoD ala}Msun El £ZOZ `L I Pdd 891,8Z DN `gaeag las—S 'M "G au!laso4S 608 lgq�oed dmx�oQ u!7ae (soxruonuS &nls!xg) a ed o}„ iVvi:Jl�llU`f11�1� ga 6 j �dtl ®3N30*1 (Aagw) .M � auguo4S 1 [8 £Z/bi/£ (Paguanun) liepunog P1epaM £Z/bl/£(Paguanm £Z/bI/£ (Paguanun),Crzpunog P0e110M 101 d Z££ x .9 ssaaay Ino dwng ,6 x .9 61 x,ZI a8e -D 3oog 1-9-d /m uu-JM l Paxsd ,91 x ,Li :s wnrs Buysa3 ,£1 x ,9 osm-OD 300t1 PIP-d /m uuoJWT P0x!d.ZI x.ZI PPV uo!suolxg ,OZ x .9 41!m ia!d .Z££ x ,9 aoeldag ssaaoy Ino dum8.8 x .9 PPV alensgns anoqu „g I � sdws leo!skgd /m Ilao0 8u!leold 9l x ,8Idaa/aleaolall ai mps anoge „gl'[]n sdols olne /m sg!31eog ,£l x,£l (Z) aleoolay :v,.pn4S pasodo,d T N (O'I3I30HOS) M'RI au!Iwo4S LOS (1—!Idd,v—m.LdV D A sG 0m9104S 608 .i. .ZZS :41P!M ApogjaleM WE : s 4- lS 30 Pu3 01 MHN ,1 S 1 :amplulS posodoid;o pug of Mo g'bs 90L ,xojddV :mdwl popegS pQsodoid .8 bs o66 xoaddy :j.W.I pT qS 9u!Is!x3 g bs gbo`l :aauemoIry gadwl paPm1S d6I :augaiogs 'NIb'30 IRP!M b/I MMItl30 4lP!M PI£/1 u!.g mn!ll sNg I dadrnS D o saA :vNd T Nx nrnnnly os.T alEus ,Cluno� xo!Msunag £ZOZ`LI q—w 89nz oN `q-oq lass .M .'a acnlazogS 608 ililtoed 8111313oa ugas (saanlon s posodotd a�ad ,61 x,ZI aiM-OD 3oog lulln'd /m uuopeld Paxld 91 x ,LI auUs!xg ,£I x,9 a8u�anoz) 30ol1 MUM /M uuopeld Pax!d ,ZI x In PPy uo!suo;xa ,OZ x ,9 ql!m ia!d ,Z££ x ,9 aaslday ssmy 1n0 dumg ,8 x ,9 PPd al>;Asgns anoge „gI sdmzs 1ea!s,Sgd /m slooQ 8ugnol3.91 x ,8 ._Idag/aleoolag a=Sgns oANu „81 gaPms Pwg /m sg!-pnog,£I x,£I (Z) woolay :smwrLuS Pasodoad (luea!Iddy—I\tl.0 VW) M iQ au!la'ogS 608 8'bs 90L'xoiddy aoedwl PaPBgS Pasod.d 'g'bs 061, "xwddv:loed-I PaPRIS 8u!ls!xa ,g bs 8g0`l :wm olly lasdml PaPEgS d£i :ou!lalogS ]IaeglaS aDvsfl MMIy3o TRM P£/I .!.a —j-d iaqum-j SaA :yNd A\-jW1TT V daAmS D 10A(,x OZ:I OIEDS /4Unoj ;tolmsunag £ZOZ `Ll IIDJEW 89178Z DN `q-ag las—S -m -iQ OEI!I-ogS 608 /(I!I!mj 3ulvoa m (1-dlul PaprgS P- sglda(I /m sazn10MS Pasododd) £ QSVd O � U o y U o m Ca ozN Q atO. ono W :5 Fs 3 9z N b0 W o U o U a d Eti�ti 6t�d Gavoli'll, IXCAMA / ❑ DREDGE & FILL GENERAL PERMIT Previous permit # WQNew ❑Modification (('Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission "i`n,a �a'rpa of environmental concern pursuant to 15A NCAC Tx�r Q Rules attached. Applicant Name Project Location: County Address c _. Street Address/ State Road/ Lot #(s) City f'- ' State ZIP Phone # {) _': ;f ; : Fax # (—) Subdivision Authorized Agent;' ,, +.. f L ',,'G V: City ZIP Affected [A CW MEW 0 PTA [I ES ❑ PTS Phone # { } River Basin AEC(s). ❑ OEA HHF ❑ IH ❑USA NIA Adj. Wtr. Body (nat lman lunknl 0 PWS: OFC: ORW: yes / no PNA yes / no Crit. Hab. yes 1 no Closest Mal. Wtr. Body Type of Project/ Activity (Scale: } Pier (dock) length Platform(s) Finger pler(s) Groin length number — Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel -" cubic yards Boat ramp Boathouse/ Boatlift Beach Bulidozing Other Shoreline Length II SAM not sure yes no t--- — __.� L )--- -� _.vi.-- -- Ci'► - -- Sandbags: not sure yes iZpE� j` GV . Moratorium: n/a yes Photos: no es 2423 y ApR;14 Walver Attached. yes �lioJ - -_-_- -_I__ _ _--. _ .._._WOlr'�------ A building permit may be required by: ❑ See act A a ang er Basin rules. Notes/ Special Conditions ' .a Agen Mrlicant Printed Name c;-/ 1r^- Signature Please read compiiance scat enton back of permit'i"t' Application Fee(s) Check # Permit Officer's Signature Issuin Date ` Expiration Date Loral PianningJurisdiction Rover File Name %CAMA / ❑ DREDGE & FILL GENERAL PERMIT Previous permit # ONew FlModification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rules attached. Applicant Name_ ,,,t _ c_Ir I - r s 1 ft r; i-7 1�4 G' k J.•.? e Project Location: County . Address f- / ? ' " ` Street Address/ State Road/ Lot #(s) / City . State Jti; f= ZIP 1 i Phone # Fax # ( _) Subdivision Authorized AgentJ +f•ti /; ! i City . ZIP Affected Q Cw KIEW KPTA C] ES C 1 PTS Phone # ( ) River Basin AEC(s): ❑OEA ❑ HHF ❑lH ❑ URA ❑N/A Adj. Wtr. Body f'; _ - (nat /nian-,/unkn) ❑ PWS: ❑ FC: CIRW: yes 1, no PNA yes 1 no. Crit. Hab. yes 1 no Closest Maj. Wtr. Body Type of Project) Activity (Scale: Pier (dock) length- Platform(s) �`7 f •: F 7 - - r - �T �— ' Finger pier(s) Groin length number Bulkhead/ Nprap length f; tCf avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp � - , _ __. - Boathouse/• Boatli(t _ .. - -- •--- --- - ,�_-___,� i --�---tom _— } j :�� }i �' �. , ,ter T t• � � ,� r, Beach Bulldozing :' I - ;'• Other L. -. Shoreline Length SAV not sure yes Sandbags: not sure yes9' E ,� = PR + Moratorium: n!a yes rho Photos: yes o r . ' _ nV' �[ • . ! . V Waiver Attached: yes , no `' -��—.._-------'----=------ __-_-__ A building permit maybe required by: ❑ See note on back regarding River Basin rules. Notess/ Special Conditions t_l1t f C i tr." ,`! : ! ,fir . 1 i , i(.. % [ J 1_+ (elf f , l l IJt• rlL,�r Agent r%� Icant int ame { M atur•e ' ' Please read compliance statement on back of permit" J•_ -r Application Fee(s) Check # 7 f Permit Officer's Signature f Issuing Date Expiration Date _ripcal Planning,lurisdiction RoverFlleName f 6.0 4.0 2.0 0.0 NOAAINOSICO.OPS _ Observed Water Levels at 8661070, Springmaid Pier SC From 2023/04105 00:00 LSTILDT to 2023/04/05 23:59 LSTILDT — 6.0 4.0 Wednesday, Apr 5 2023, t4 36 LST LDT Predictions 0.031 ft. NOAA NOS Center for Operational Oceanographic Products and Services 0000 03 00 0600 Prelimindry: 0.33ft. 1 °, 00 1800 2. 1 00 4 5 4,5 4,5 4 S 4;5 4 5 — Predictions — Verified — Preliminary PPR 06 2023 DOM N00NGTON ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director April 27, 2023 MEMORANDUM: �nEQ NORTH CAROLINA Environmental Quality FROM: Cameron Luck, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) cameron.lucka-NCDENR.gov SUBJECT: CAMA Applicant: David and Carol Martin Project Location: 809 Shoreline Dr. W, adj. to the AIWW in Sunset Beach, Brunswick County. Proposed Project: The applicant proposes to replace and extend an existing two (2) slip docking facility to the established pier -head line to access deeper water. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Cameron Luck at the address above by May 21, 2023. If you have any questions regarding the proposed project, contact Brendan Brock at (910) 796-7226 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE E Q North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 NORTH CAROLINA - .e ..e t of en.troome W mail /� 910.796.7215 Major Permit Fee Schedule Project Name: NI(A, County: 8(,J^,), Check No &Amount: 4-mo � za( Development Type Fee DCM % DWQ % (143D0160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or $250 100% ($250) 0% ($0) excavation of any wetlands or open water areas: ll. Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality $250 100% ($250) 0% ($0) Certification No. 4175 can be applied: III(B). Public or commercial development, if General Water Quality Certification $400 100% ($400) 0% ($0) No. 4175 can be applied: Ill(C). If General Water Qua(tedto Certification No. 4175 could be a but DCM staff determined that ad $400 60% ($240) 40% ($160) review and written DWQ concurr needed because of concerns relwater quality or aquatic life III(0) If General Water Quality $400 60% ($240) 40% ($160) Certification No. 4175 cannot be applied: IV Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands and/or open water areas: