Loading...
HomeMy WebLinkAbout20230598 Ver 1_ePCN Application_20230421DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 4/19/2023 BIMS # Assigned 20230598 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Holley Snider:Holley.Snider@ncdenr.gov Information for Initial Review la. Name of project: COURTESY COPY 4337 Appleton Way 1a. Who is the Primary Contact?* Dana Lutheran 1b. Primary Contact Email: * dlutheran@segi.us Date Submitted 4/21/2023 Nearest Body of Water Bernard's Creek Basin Cape Fear Water Classification C;sw Site Coordinates Latitude: 34.161536 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: New Hanover Is this a NCDMS Project Yes No Longitude: -77.917104 Version#* 1 Reviewing Office` Wilmington Regional Office - (910) 796-7215 1c. Primary Contact Phone: * (910)228-1841 O Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 18 - Minor Discharges NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Madison Smith 2b. Deed book and page no.: BK 006570 PG 000504 2c. Contact Person: Same 2d. Address Street Address 160 Beaumont Oaks Address Line 2 Apt. 226 city Wilmington Postal / Zip Code 28412 2e. Telephone Number: (910)465-3768 2g. Email Address:" msmith3414@gmail.com 4. Agent/Consultant (if applicable) 4a. Name: Dana Lutheran 4b. Business Name: Southern Environmental Group, Inc. (SEGi) 4c.Address Street Address 5315 South College Road Address Line 2 Suite E city Wilmington Postal / Zip Code 28412 4d. Telephone Number: (910)228-1841 4f. Email Address: dlutheran@segi.us C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) Echo Farms 1c. Nearest municipality / town: Wilmington 2. Project Identification 2a. Property Identification Number: R07012-001-042-000 2c. Project Address Street Address 4337 Appleton Way Address Line 2 city Wilmington Postal / Zip Code 28412 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Bernard's Creek 3b. Water Resources Classification of nearest receiving water:" C;SW State / Province / Region NC Country us 2f. Fax Number: State / Province / Region NC Country us 4e. Fax Number: 2b. Property size: 0.49 State / Province / Region NC Country us L 3c. What river basin(s) is your project located in?" Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300050504 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: " Currently the project site is wooded, and Section 404 wetlands (i.e., Headwater Forest) encompass all but the southeast corner of the subject property, which is located within the existing Echo Farms Subdivision. A 15' drainage easement extends along the northern property line and conveys stormwater runoff, from the subdivision, to an unnamed tributary that drains to Barnards Creek. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.337 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:' The purpose of this project is to construct a single family dwelling with adequate maintenance corridor. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The project will entail removing woody vegetation and root mat from the limits of disturbance, after which the area will be backfilled with clean earthen soil. Lastly, a retaining wall will be installed to contain the fall and final grading will take place. The area will be stabilized with seed or sod when construction has been completed. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?" Yes No Comments: The Applicant is not seeking a JD with this action. 5b. If the Corps made a jurisdictional determination, what type of determination was made?" Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): David Scibetta Agency/Consultant Company: SEGi Other: 6. Future Project Plans O Unknown 6a. Is this a phased project?" Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This project is part of an existing subdivision, where a road system is already in place, and sewer and water are available for connection, at the street. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries O Buffers Open Waters Pond Construction 2. Wetland Impacts Reason (?) 2b. Impact type" (?) 2c. Type of W." 2d. W. name 2e. Forested" 2f. Type of Jurisdicition * (?) 2g• Impact area * ll Ft P Headwater Forest A Yes Corps 0.048 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.048 2g. Total Wetland Impact 0.048 2i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The applicant had a wetland delineation conducted prior to designing the project. Once wetlands were identified and became apparent that avoiding impacting the resource was not possible, the Applicant positioned the structure within the only available uplands (i.e., that area behind the city's building setbacks) and incorporated a retaining wall around the fill, which removed the slope of the fill. The retaining wall will minimize impacts to wetlands by approximately 700 SF (0.016 AC). 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Prior to land disturbing activities, the approved wetland impact line will be marked in the field with construction fencing and silt fence will be installed, to ensure unauthorized impacts do not take place. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Lower Cape Fear Umbrella Mitigation Bank (LCFUMB) 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.10 3c. Comments A credit reservation letter has bee requested, from the LCFUMB, and will be forwarded upon receipt, to the Corps. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: This project is not within one of NC's Riparian Buffer River Basins. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: This project will not generate more than 10,000 SF of built upon area. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No O 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. The project will not provide access to currently landlocked property, and the incorporation of sediment and erosion control measures should ensure sediment is not discharged into downstream receiving waters. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. CFPUA which is available at the street, for connection. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC and SLOPES information (see attached). Two species are of concern with this project: the Northern Long -Eared Bat (NLEB) and the Red Cockaded Woodpecker (RCW). There will be no percussive or blasting activities during the construction, and it appears the project site is not with a RCW consultation area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? This project does not contain a waterbody that would support EFH. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NC HPOWEB2.0 (see attached). The project site is neither within an area designated as National Historic Place nor are there any existing structures within the project limits. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?" Yes No 8b. If yes, explain how project meets FEMA requirements: The project will take place within the 0.2 PCT ANNUAL CHANCE FLOOD HAZARD flood zone. Floodplain approval will be secured when applying for a building permit, which will not take place for some time. However, the site is not located within a flood zone that regulates increasing existing ground elevations, such as the VE (High Velocity/Energy) or the LiMWA (Limit of Moderate Wave Action) flood zones. The structure will be elevated to a height where the heated floor area is at least 2' above the base flood elevation. 8c. What source(s) did you use to make the floodplain determination?" New Hanover County GIS Flood Map (see attached). Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 4337 Appleton Way PCN Attachments 4-21-23 Final.pdf 90.54KB File must be PDF or KMZ Comments Signature O By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Dana A. Lutheran Signature z6W00" Date 4/21 /2023