Loading...
HomeMy WebLinkAbout20150456 Ver 1_Signed 401 Application_201505180 \NAT €, 0 Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? FE Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ® Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Vietnam Veterans Memorial 2b. County: Onslow 2c. Nearest municipality / town: Jacksonville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: United States of America 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): John Townson 3d. Street address: PSC Box 20004 3e. City, state, zip: Camp Lejeune, NC 28460 3f. Telephone no.: (910) 451 -5003 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Jay Keller 5b. Business name (if applicable): Keller Environmental 5c. Street address: 7921 Haymarket Lane 5d. City, state, zip: Raleigh, NC 27615 5e. Telephone no.: (919) 749 -8259 5f. Fax no.: (919) 803 -0970 5g. Email address: jay @kellerenvironmental.com Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 436000377695 1 b. Site coordinates (in decimal degrees): Latitude: 34.743690 Longitude: - 77.41280 (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 9.51 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Burnt House Branch proposed project: 2b. Water Quality Classification of nearest receiving water: SC; NSW 2c. River basin: White Oak 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The property is primarily forested. There is an existing Beirut & Vietnam Memorial with pathways, parking areas and gardens. The triangular- shaped property is surrounded by Montford Point Road (southwest), Lejeune Boulevard (north) and US -17 Bypass (southeast). There is approximately 1 -acre of 404 wetlands on the site. The general land use in the vicinity of the project consists of Montford Point Cemetary, residential subdivisions, 1- retail, forested areas and home of the legendary US Marine Corps Camp Lejeune. 3b. List the total estimated acreage of all existing wetlands on the property: 1.00 Acre 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: The purpose of the project is to construct a visitor's center for the existing Vietnam Veterans Memorial to serve current and future residents and visitors. 3e. Describe the overall project in detail, including the type of equipment to be used: The project consists of a visitors center with sidewalks, loading area, and delivery driveway. The sidewalk will connect with the existing parking lot on the east side of Montford Point Road (MPR). It will have a bridge spanning an unnamed tributary to Burnt House Branch (BHB). The delivery driveway will connect the rear loading dock area with MPR. It will cross the UT to BHB with twin culverts and have headwalls on both ends. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No El Unknown project (including all prior phases) in the past? Comments: USACE Action ID 2002 -752 & 2008 -752 4b. If the Corps made the jurisdictional determination, what type Preliminary ED Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Keller Environmental Name (if known): Jay Keller Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. February 25, 2008 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. The proposed Visitor's Center is the final phase of this project. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ®T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ®P ❑ T Fill Tributary 0.009 02 ❑ PET Excavation Tributary 0.009 03 ❑ PEI T 04 ❑ PEI T 4f. Total open water impacts 4g. Comments: 392 SF (0.009 -Acre) of permanent fill is proposed for the twin - culvert driveway crossing area. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ❑P ❑T F-1 Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The driveway crossing was strategically located in a linear section. It's perpendicular alignment and headwalls will minimize impacts to the stream and riparian buffers. The pedestrian bridge will avoid jurisdictional area impacts since it will be free- standing and footers on the upper channel banks. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 42% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Please refer to the attached September 20, 2012 stormwater permit approval. State Stormwater Management Systems Permit No. SW8060145. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Future impacts are not anticipated since this a single /complete project. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage disposal will be to the City of Jacksonville waste water treatment system. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife; NC Natural Heritage Databases. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp: // ocean .floridamarine.org /sa —efh /. Essential fish habitat is not located near the proposed project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC SHPO Database 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC Floodmaps Jay Keller May 15, 2015 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version A Ui �I ni AI Q � E C J ,28.38 24 22 20 18 16 G 14 12 24 22 20 18 16 14 12 10 +00 10 +50 SECTION A -A p Y I I i n n AI 5 �G h�l� I tnn 117 5 NoT $ffo N I� � fGjYW l iuG7S, s/i 8 /es Jts 1999 -99 �ro =T AM VETERANS MEMORIA (EXISTING) Z\ j1 { Cl.,! �n ten. . tlninaBe p{a `k FINI.H�ED 7FL�R oA. - RroposW41l¢eaan TrM amm EFAwa4 r 12 �P ARCHITECTURE FlllnwooJOaspnasswks, a. len.e ex. lenm a;� a I'�Mdk«ul e" ,k� e hPo�T �y6 yG. ®E�u�wn __ -- amereca.on —.ro— norsmcvmx ® WwvAem ®awwr,ue L— 11 F- anflvmanavu:� u. azmpuat u. BP fora �� Piwewwl+pvlwa wreaw Iw�r..wm+.m m.ratl�w.y.e+m� M VN., dSaYUWSM YbS�m�GNtl wwwmca.. mm 4011404 Permitting Exhibit Drawing C gild A a OA.UR.AOE PM W b Enr4Mm<nlal PUmX1nE C7.02 kuk e.. emxnp. pp SOe Date a�w.b scum: ovum x�wu aamn ac6'Wh m w 1.—(O.O.T.'¢) e+w^v� F.tula e5fx GRAPHIC SCALE II' 4V40' ,G' iU��BO. 12 �P ARCHITECTURE FlllnwooJOaspnasswks, a. len.e ex. lenm a;� a I'�Mdk«ul e" ,k� e hPo�T �y6 yG. ®E�u�wn __ -- amereca.on —.ro— norsmcvmx ® WwvAem ®awwr,ue L— 11 F- anflvmanavu:� u. azmpuat u. BP fora �� Piwewwl+pvlwa wreaw Iw�r..wm+.m m.ratl�w.y.e+m� M VN., dSaYUWSM YbS�m�GNtl wwwmca.. mm 4011404 Permitting Exhibit Drawing C gild A a OA.UR.AOE PM W b Enr4Mm<nlal PUmX1nE C7.02 kuk IMPACT AREA 1 ECE{v� IY 20f5 Loll Proposed 41 L Twin Culverts with Endwalis IMPACT AREA 2 Proposed Pedestrian Bridge p N TEMP IwWJAv' i Foil P,�� tNbTil��IlA'flUVt NOT NEW LEGEND = PERMANENT FILL AREA IMPACT TABLE 24 22 20 18 16 14 12 SECTION B -B 24 22 20 18 16 14 12 ARCHITECTURE ElllnwoolWflpn Affa[hh; wa[ 4011404 Permitting Exhibit Drawing E KGWEWAV V.01 M cc IMPACT AREA 1 AREA 2 PERMANENT FILL 0 SF 392 SF TEMPORARY 0 SF 392 SF EXCAVATION 24 22 20 18 16 14 12 SECTION B -B 24 22 20 18 16 14 12 ARCHITECTURE ElllnwoolWflpn Affa[hh; wa[ 4011404 Permitting Exhibit Drawing E KGWEWAV V.01 M cc