Loading...
HomeMy WebLinkAboutWQ0013419_Sludge Landfill Sink Hole Work Plan_202210074 Blanchard Road, P.O. Box 85A Cumberland, ME 04021 Tel: 207.829.5016  Fax: 207.829.5692 info@sme-engineers.com sme-engineers.com 220568 20221007 sinkhole work plan.docx ENVIRONMENTAL  CIVIL  GEOTECHNICAL  WATER  COMPLIANCE WORK PLAN FOR EVALUATION AND REPAIR OF SINKHOLE IN LANDFILL DAM SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA October 7, 2022 BACKGROUND This Work Plan was prepared to address a recent sinkhole development in the embankment dam that retains Glatfelter’s closed Sludge Landfill (landfill), located in Pisgah Forest, North Carolina. On Friday, July 8, 2022 Mike Cody and Jack Garren (environmental contractors to Glatfelter) observed a sinkhole in the dam known as the Sludge Landfill Dam (dam). The dam is located on the Davidson River Village property formerly used for papermaking and treatment/disposal of papermaking residuals. The dam retains landfilled wastewater treatment sludge. The sinkhole is located on the landfill side of the dam, has an estimated diameter of approximately 25 feet, and a depth of approximately 10 feet. Upon discovering the sinkhole, Cody and Garren installed visual warning tape around the sinkhole’s perimeter and alerted Davidson River Village (DRV) (owners of the landfill property) of the sinkhole condition and recommended that DRV restrict access to the landfill and make all authorized landfill site users aware of the sinkhole and its potential danger. Figures 1-1 and 1-2 (all figures attached) show the sinkhole as photographed on July 8, 2022. Shortly after the sinkhole perimeter was secured, Cody contacted Sevee & Maher Engineers, Inc. (SME) (geotechnical and environmental contractor to Glatfelter) to discuss the sinkhole. Cody also contacted the North Carolina Department of Environmental Quality (NCDEQ) to arrange a site inspection. Brett Laverty (NCDEQ) visited the landfill on July 20, 2022 to observe the sinkhole and the dam retaining the landfilled waste. Review of existing drawings for the dam (see Figures 1-3, 1-4, and 1-5) indicate that a 48-inch-diameter reinforced concrete pipe (RCP) and a 30-inch-diameter corrugated metal pipe (CMP) are positioned in the vicinity of the sinkhole. The 48-inch RCP was constructed on the sideslope of the dam (on the landfill side) and is now covered by 10 to 70 feet of sludge. The 30-inch CMP, which was constructed across the base of the dam and outlets into an aerated stabilization basin (ASB) on the opposite side of the dam, was historically used to drain groundwater discharge (i.e., springs) occurring in the landfill area, leachate expressed from the sludge, and precipitation runoff/leachate from the landfill surface. The 48-inch RCP and the 30-inch CMP both connect to a concrete junction box located at the toe of the dam on the 220568 20221007 sinkhole work plan.docx October 2022 Page 2 landfill side. A 12-inch CMP pipe, which collects water from the base of the landfill also connects to the junction box. On July 20, 2022 Mountain Environmental Services, Inc. (MESI) mobilized a remote-controlled robotic camera to the landfill to video and photograph the interior of the 48-inch and 30-inch diameter pipes. MESI determined that no more than 10 feet of the RCP and no more than 45 feet of the CMP could be accessed by the camera. Design drawings indicate the RCP and CMP are approximately 125 feet and 330 feet long, respectively. Figures 1-6 and 1-7 show views of the pipe interiors as photographed on July 20, 2022. On July 20, 2022, SME performed an aerial survey of the landfill and dam surface topography. The grass surface covering the landfill and dam had recently been mowed allowing a vertical resolution of +/- 6 inches, or less. The purpose of the survey was to visually detect depressions in the surface topography that could be suggestive of development of other potential sinkholes. The topography developed from the survey is shown on Figure 1-8. Examination of the topographic contouring for Figure 1-8 showed no apparent presence of other potential sinkhole locations. On August 10, 2022, MESI mobilized water-jet pipe cleaning equipment and the robotic camera to the landfill to clean the 30-inch CMP. The pipe cleaning effort occurred over three consecutive workdays and was able to clean the first 135 feet of pipe. The cleaning ended when a boulder-like obstruction filling essentially the whole 30-inch CMP cross-section was encountered. Figure 1-9 shows a view of the obstruction. The pipe cleaning equipment could not dislodge the obstruction and cleaning was halted. The pipe cleaning washed considerable soil and rock-like debris from the pipe. Figure 1-10 shows views of some of the debris, which appears to be a combination of pipe scale and concrete. Figure 1-11 shows views of the 30-inch CMP flow taken in 2004, 2006, and 2022, and Figure 1-12 shows the soil delta that was visible at the CMP outfall point on July 12, 2022. On August 22, 2022, a landscape contractor was on-site to perform scheduled grass mowing of the landfill cover and dam surface. At approximately 2 p.m., a landscaper noticed brown-colored flow coming from the 30-inch CMP. Figure 1-13 shows the flow observed by the landscaper. Later that same day, Jack Garren observed the pipe and noted that the flow had become less. On August 25, 2022, the flow was observed again, and the flow color had returned to a near-clear condition (see Figure 1-14). Also, on August 22, 2022, the landscape contractor reported an area of soft ground/shallow standing water on the landfill cover. The location of the observed soft area is shown on Figure 1-15. Discussions with the landscaping contractor indicated no soft area in that part of the landfill cover had been noticed since the landscaping contractor started mowing the cover several years before. 220568 20221007 sinkhole work plan.docx October 2022 Page 3 Attachment 1 includes additional background information relative to the dam and its appurtenances, and additional discussion of the events described above. Attachment 2 includes electronic copies of the video of the 30-inch CMP interior taken on July 20, 2022 and August 10, 2022. CONCEPTUAL MODEL FOR SINKHOLE Preliminary engineering evaluation of the sinkhole suggests the sinkhole does not present a slope stability risk in terms of a breach forming through the dam nor present a risk of the landfilled sludge moving through a possible breach. The evaluation does indicate that control of the water in the 30-inch CMP needs to be better understood and how future water flow through the 30-inch pipe could affect long-term drainage and slope stability of the dam. The conceptual model for the sinkhole is as follows: • The sinkhole was formed by collapse of, or lateral displacement of, portions of either one or both of the pipes. Debris of various sizes from the sinkhole entered the 30-inch CMP and/or the 48-inch RCP and caused an obstruction in the pipe. Some of the debris was removed from the 30-inch CMP by cleaning efforts performed on July 20, 2022 and August 10, 2022. Flushing flows observed on August 22, 2022 and August 24, 2022 also resulted in removing debris from the 30- inch pipe. An obstruction was encountered in the 30-inch pipe that prohibited pipe cleaning beyond approximately 135 feet from the 30-inch pipe opening (on the ASB side). The obstruction apparently has caused debris to accumulate in the CMP (upstream of the obstruction) and the obstruction appears to have slowed flow through 30-inch CMP. Drainage from the landfill backs up in the 30-inch CMP as well as in the 12-inch CMP that connects to the same junction box as does the 48-inch RCP and 30-inch CMP. The water in the 12-inch CMP eventually develops sufficient pressure to influence the obstruction in the 30-inch CMP and a flushing-flow occurs, moving more of the sinkhole debris to the ASB. It is uncertain if the piezometric levels in the dam or landfill are increasing as a consequence of the flow in the 30-inch pipe. It is also uncertain if the sinkhole or potential future flushing-flows represent slope stability concerns for the dam overall; however, because the ASB side of the dam appears to be unsaturated (no water pressures affecting slope stability) and because the sludge exhibits some shear strength (to resist lateral movement), it is expected that a slope stability failure of the dam in the sinkhole area and movement of sludge through such a failure is very unlikely. 220568 20221007 sinkhole work plan.docx October 2022 Page 4 Observations that support the conceptual model for the sinkhole are: • There is no reason to believe the sinkhole is a function of the local geology (i.e., the native residual soil and underlying bedrock are not considered subject to sinkhole formation); • Records for the dam and landfill do not identify large void spaces (e.g., buried vessels or chambers) that were included in the dam construction other than the 48-inch RCP, the 30-inch CMP, and the 12-inch CMP; • The landfill was closed with a soil cover in 2009. The soil cover construction included operation of heavy equipment and relocation of a portion of the second (i.e., the uppermost) dike in the sinkhole area. No tell-tale signs of the sinkhole were reported when the soil cover was constructed; • Several slope stability analyses (SME, 2006; Law, 1976) have been performed for the dam and retained sludge and have resulted in acceptable factors of safety (i.e., > 1.5) for static conditions, assuming a phreatic surface in the dam reflective of the landfilled sludge being fully saturated with a water level near the dam’s crest. Static factors of safety of 1.5 or more are considered acceptable for dam slope stability; • Piezometric water levels measured in the dam remained the same or increased small amounts between the period of May 20, 2022 and September 8, 2022. The landfill area received approximately 23 inches of rain during that same period. Interpretation of the piezometric elevations in the dam continue to indicate that much of the dam’s soil mass in the vicinity of the original dam crest and in the dam portions between the crest and the ASB remain drained and unsaturated; • Prior to the sinkhole discovery, no cloudy water had been reported flowing from the 30-inch CMP since 2019, suggesting that if the sinkhole has been ongoing, the sinkhole progression has been slow to develop and has not influenced other locations within the dam; • No water flow has been observed along the exterior of the 30-inch CMP, which suggests the internal erosion associated with the sinkhole was allowed by an opening into one or both of the pipes; and • The shear strength of the sludge (retained by the dam) is adequate to resist rapid downslope movement of the landfilled sludge in the unlikely event that the sinkhole progresses to become a breach through the dam. The conceptual model for the sinkhole condition considers that measures can be implemented to assure that drainage through the 30-inch CMP continues and that backfilling of the sinkhole with a material of sufficient shear strength and physical characteristics to resist future erosion can be completed. 220568 20221007 sinkhole work plan.docx October 2022 Page 5 INVESTIGATIONS AND ANALYSES RECOMMENDED TO ACCEPT/REJECT SINKHOLE CONCEPTUAL MODEL Acceptance/rejection of the conceptual model for the sinkhole will require collection and analysis of sludge and dam geotechnical data in the sinkhole area. A summary of the data required is presented below. • Conduct additional cleaning and photographic inspection of the 30-inch CMP. The August 22, 2022 flows from the 30-inch CMP likely dislodged the obstruction encountered on August 10, 2022. Efforts will be taken to continue cleaning the 30-inch pipe to the junction box on the landfill side of the dam. In the event the obstruction in the CMP remains or has changed position in the 30-inch pipe, the cleaning effort will include steps to reduce the size of the obstruction and remove it from the pipe. • Better define the lateral limits of the sinkhole. As shown in Figure 1-2, a buildup of soil and geosynthetics underlie the two dike(s) that were added to the dam’s crest more than 20 years ago. The buildup of soil and geosynthetics could be masking the lateral extent of the sinkhole. To address the extent of the sinkhole, four borings will be drilled in the vicinity of the sinkhole to detect voids and softness with respect to depth, which could be suggestive of the lateral limits of the sinkhole. The borings will allow in-situ shear strength testing, penetration testing, and undisturbed soil sampling (for subsequent laboratory strength evaluation) to be completed with respect to depth. Multi-level standpipe piezometers will be installed in the borings to better understand water levels in the sludge and dam in the vicinity of the sinkhole. The results of the in-situ testing and laboratory testing will be used to perform additional slope stability analyses for the dam when subjected to various hydraulic conditions. • Better define the shear strength and water level of the sludge in the vicinity of the sinkhole. The sludge in the landfill has been capped since 2009. Settlement (i.e., consolidation) of the sludge has occurred since the landfill was covered. The consolidation has likely resulted in increased sludge shear strength, which is beneficial relative to dam slope stability. Two borings will be drilled into the sludge in the vicinity of the sinkhole. The borings will be located sufficiently away from the toe of the dam (on the landfill side) to minimize any effect the dam slope could potentially have had on consolidation of the sludge. The borings will be used to measure the sludge thickness, in-situ shear strength and piezometric conditions. • Perform dam slope stability analyses relative to the sinkhole. Slope stability of the dam in the sinkhole area will be evaluated using the water levels measured in the (new and existing) piezometers and the sludge and soil shear strengths measured in the borings. Attention will be given to evaluating slope stability of the dam (on the ASB side) with the 30-inch CMP free- flowing and fully plugged. 220568 20221007 sinkhole work plan.docx October 2022 Page 6 • Prepare a report summarizing the investigations made for the sinkhole. The report will provide conclusions relative to slope stability of the dam and the basis for those conclusions. Pending acceptable findings, the report will also make recommendations for backfilling the sinkhole and mitigation of the 30-inch CMP, if considered to be necessary. SCHEDULE Based on discussion with regional pipe cleaning and drilling subcontractors in the vicinity of the landfill, it is expected that additional cleaning of the pipeline and drilling boreholes in the dam and landfill can be completed in late fall-early winter 2022. Laboratory testing of soil and sludge samples collected from the boreholes is expected to require three to four weeks to complete. The evaluation/analysis of the data with a summary report is expected to be available three to four weeks following completion of the laboratory testing. FIGURES DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-1 SINKHOLE PHOTOGRAPH #1 GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON JULY 20, 2022 \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 , 8 / 2 2 / 2 0 2 2 1 1 : 4 5 : 2 9 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-2 SINKHOLE PHOTOGRAPH #2 GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON JULY 20, 2022 \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 2 , 8 / 2 2 / 2 0 2 2 1 1 : 4 5 : 3 9 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.comNASME-STD FIGURE 1-3 DESIGN RECORD DRAWING #R-200-E GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA 8/22/202220220720-UAV-SME-BASE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 3 , 8 / 2 2 / 2 0 2 2 1 1 : 4 5 : 4 6 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.comNASME-STD FIGURE 1-4 DESIGN RECORD DRAWING #R-216-E GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA 8/22/202220220720-UAV-SME-BASE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 4 , 8 / 2 2 / 2 0 2 2 1 1 : 4 5 : 5 8 A M , j r l 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5+60 5+80 6+00 2100 2120 2140 2160 2180 2200 2220 2100 2120 2140 2160 2180 2200 2220 2 1 9 5 2 1 9 4 21 9 3 2 1 9 6 2199 21 9 8 21 9 7 21 9 6 219 5 21 9 5 21 9 4 21 9 3 21 9 2 2 1 9 1 21 9 0 2 1 8 9 2 1 8 8 2 1 8 7 2 1 8 6 21 9 6 21 9 5 21 9 5 21 9 4 21 9 3 21 9 2 21 9 1 21 9 0 21 8 9 21 8 8 21 8 7 21 9 4 219 4 21 8 7 21 8 6 21 8 7 21 8 6 21 8 5 21 8 0 21 7 5 21 7 0 21 6 5 21 6 0 21 5 5 21 5 0 21 4 5 21 4 0 21 3 5 21 3 0 21 2 5 21 2 0 21 1 5 21 1 2 2 1 9 4 2195 2 1 9 7 21 9 6 2 1 9 9 2 1 9 8 2 1 9 7 2 1 9 6 2195 2194 2193 2199 2198 2197 2196 2195 220 6220 5 22 0 4 22 0 3 22 0 2 22 0 1 22 0 0 21 9 5 21 8 8 0+00 1+00 2+00 3+00 4+00 5+00 6+00 DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com8/22/202220220720-UAV-SME-BASE PLAN-PROF SME-STD FIGURE 1-5 APPROXIMATE LOCATION OF PIPES RELATIVE TO SINKHOLE GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA 48" DIA INLET PIPE 30" DIA OUTLET PIPE 12" DIA DRAINAGE PIPE FROM LANDFILL CONCRETE STRUCTURE 010 20 40 FEET PLAN PROFILE 010 20 40 FEET 48" DIA INLET PIPE 30" DIA OUTLET PIPE 12" DIA DRAINAGE PIPE FROM LANDFILL CONCRETE STRUCTURE DIKE NO. 2 (PRE SETTLEMENT)DIKE NO. 1 (PRE SETTLEMENT) EXISTING GRADE (TYP) SINKHOLE SINKHOLE EXPECTED COLLAPSED SOIL PIPE LENGTH UNKNOWN PIPE LENGTH UNKNOWN NOTES: EXISTING AERIAL IMAGE FROM LOW ALTITUDE AERIAL PHOTOGRAMMETRIC MAPPING PERFORMED BY SEVEE & MAHER ENGINEERS, INC. (SME) OF CUMBERLAND, MAINE, DATED JULY 20, 2022. GROUND CONTROL ESTABLISHED USING AEROPOINTS. N GRI D \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 5 , 8 / 2 2 / 2 0 2 2 1 1 : 4 7 : 0 2 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-6 INTERIOR OF 48-INCH RCP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON JULY 20, 2022 \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 6 , 8 / 2 2 / 2 0 2 2 1 1 : 4 7 : 1 8 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-7 INTERIOR OF 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTOS TAKEN ON JULY 20, 2022 30" DIA PIPE INTERIOR FROM PIPE INSPECTION30" DIA PIPE INTERIOR FROM END OF PIPE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 7 , 8 / 2 2 / 2 0 2 2 1 1 : 4 7 : 2 9 A M , j r l 219 5 219 0 2186 2 2 0 3 2 2 0 2 2 2 0 1 2 2 0 0 21 9 9 2 1 9 8 2 1 9 7 2 1 9 6 2 1 9 5 21 9 4 2 2 0 5 221 0 2200 219 9219 8219 7 2196 2195 2240 2235 2230 2225 22202219221822172216 2215 2214 2213 2212 2211 2210 2209 2208 2207 2206 2205 2204 2203 2202 2201 22 1 1 22 1 0 22 0 9 22 0 8 220 7 2206 2205220 4 22 0 3 22 0 2 2 2 0 1 2200 2199219 8 21 9 7 21 9 6 21 9 5 21 9 4 21 9 3 2 2 3 0 2 2 2 5 2 2 2 4 2 2 2 3 2 2 2 2 2 2 2 1 2 2 2 0 2 2 1 9 2 2 1 8 22 1 7 22 1 6 22 1 5 22 1 4 22 1 3 22 1 2 218 5 218 0 217 5 217 0 216 5 216 0 215 5 215 0 214 5 214 0 213 5 213 0 212 5 212 0 211 5 22 3 0 222 5 222 0 2 2 3 0 2 2 2 5 22 2 0 22 1 5 22 1 0 2 2 0 5 DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com 025 50 100 FEET EX-TOPO SME-STD FIGURE 1-8 EXISTING TOPOGRAPHY GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA NOTES: EXISTING AERIAL IMAGE FROM LOW ALTITUDE AERIAL PHOTOGRAMMETRIC MAPPING PERFORMED BY SEVEE & MAHER ENGINEERS, INC. (SME) OF CUMBERLAND, MAINE, DATED JULY 20, 2022. GROUND CONTROL ESTABLISHED USING AEROPOINTS.8/22/202220220720-UAV-SME-BASE NGRID 48" DIA INLET PIPE 30" DIA OUTLET PIPE 12" DIA DRAINAGE PIPE FROM LANDFILL CONCRETE STRUCTURE SINK HOLE PIPE LENGTH UNKNOWN \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 8 , 8 / 2 2 / 2 0 2 2 1 1 : 4 7 : 4 8 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-9 VIEW OF OBSTRUCTION IN 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON AUGUST 11, 2022OBSTRUCTION IN 30" DIA PIPE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 9 , 8 / 2 2 / 2 0 2 2 2 : 3 1 : 4 5 P M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-10 DEBRIS REMOVED FROM 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON AUGUST 11, 2022DEBRIS REMOVED FROM 30" DIA PIPE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 0 , 8 / 2 2 / 2 0 2 2 2 : 3 1 : 5 0 P M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-11 VIEW OF FLOW 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE WATER FLOW FROM 30" DIA PIPE - JULY 20, 2022 WATER FLOW FROM 30" DIA PIPE - OCTOBER 1, 2004 WATER FLOW FROM 30" DIA PIPE - AUGUST 25, 2006 \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 1 , 8 / 2 2 / 2 0 2 2 2 : 4 8 : 2 5 P M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS8/22/2022 FIGURE 1-12 VIEW OF SOIL DELTA AT 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTOS TAKEN ON JULY 20, 2022 SOIL DELTA AT OUTLET OF 30" DIA PIPEDEBRIS AT OUTLET OF 30" DIA PIPE \\ N S E R V E R \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 2 , 8 / 2 2 / 2 0 2 2 1 1 : 4 8 : 3 4 A M , j r l DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS9/16/2022 FIGURE 1-13 VIEW OF FLOW 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON AUGUST 22, 2022 \\ n s e r v e r \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 3 , 9 / 1 6 / 2 0 2 2 1 : 5 9 : 2 8 P M , b w b DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS9/16/2022 FIGURE 1-14 VIEW OF FLOW 30-INCH CMP GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON AUGUST 25, 2022 \\ n s e r v e r \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 4 , 9 / 1 6 / 2 0 2 2 2 : 0 6 : 2 7 P M , b w b 219 5 219 0 2186 2 2 0 3 2 2 0 2 2 2 0 1 2 2 0 0 21 9 9 2 1 9 8 2 1 9 7 2 1 9 6 2 1 9 5 21 9 4 2 2 0 5 221 0 2200 219 9219 8219 7 2196 2195 2240 2235 2230 2225 22202219221822172216 2215 2214 2213 2212 2211 2210 2209 2208 2207 2206 2205 2204 2203 2202 2201 22 1 1 22 1 0 22 0 9 22 0 8 220 7 2206 2205220 4 22 0 3 22 0 2 2 2 0 1 2200 2199219 8 21 9 7 21 9 6 21 9 5 21 9 4 21 9 3 2 2 3 0 2 2 2 5 2 2 2 4 2 2 2 3 2 2 2 2 2 2 2 1 2 2 2 0 2 2 1 9 2 2 1 8 22 1 7 22 1 6 22 1 5 22 1 4 22 1 3 22 1 2 218 5 218 0 217 5 217 0 216 5 216 0 215 5 215 0 214 5 214 0 213 5 213 0 212 5 212 0 211 5 22 3 0 222 5 222 0 2 2 3 0 2 2 2 5 22 2 0 22 1 5 22 1 0 2 2 0 5 DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com SME SEVEE & MAHER ENGINEERS ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 smemaine.com 025 50 100 FEET EX-TOPO SME-STD FIGURE 1-15 SOFT AREA ON LANDFILL SURFACE GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA NOTES: EXISTING AERIAL IMAGE FROM LOW ALTITUDE AERIAL PHOTOGRAMMETRIC MAPPING PERFORMED BY SEVEE & MAHER ENGINEERS, INC. (SME) OF CUMBERLAND, MAINE, DATED JULY 20, 2022. GROUND CONTROL ESTABLISHED USING AEROPOINTS.8/22/202220220720-UAV-SME-BASE NGRID APPROXIMATE LOCATION OF OBSERVED SOFT SPOT ON LANDFILL SURFACE \\ n s e r v e r \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 5 , 9 / 1 6 / 2 0 2 2 3 : 0 9 : 0 9 P M , b w b DWG:REV:LMN:CTB: SME SEVEE & MAHER ENGINEERS9/16/2022 FIGURE 1-16 CLOUDY WATER AT 30-INCH OUTFALL GLATFELTER SLUDGE LANDFILL PISGAH FOREST, NORTH CAROLINA SME-STDLMN20220720-UAV-SME-BASE PHOTO TAKEN ON MARCH 19, 2019 \\ n s e r v e r \ c f s \ P h g \ S l u d g e L a n d f i l l \ A c a d \ 2 0 2 2 0 7 2 0 - U A V - S M E - B A S E . d w g , F I G 1 - 1 6 , 9 / 1 6 / 2 0 2 2 1 : 4 2 : 1 2 P M , b w b ATTACHMENT 1 BACKGROUND INFORMATION AND PRELIMINARY OBSERVATIONS Attachment 1 Page 1 BACKGROUND INFORMATION AND PRELIMINARY OBSERVATIONS The dam was constructed in 1976. Soil materials used to construct the dam were excavated from a ravine (area to the north) that now forms the landfill. A report by Law Engineering Testing Company (LETCo.) dated November 23, 1976, documents the dam’s construction, and includes the following information: Dam Maximum Height (Main Dam) Approx. 75 ft Dam Crest Length Approx. 425 ft Dam Crest Elevation1, 2 2,186 ft Dam Crest Width 15 ft Dam Upstream Slope Angle (i.e., ASB side) 3 Horizontal: 1 Vertical Dam Downstream Slope Angle (i.e., landfill side) 2 Horizontal: 1 Vertical Note 1. LETCo. Report did not state an Elevation Datum, however 2005 survey of the dam by Hafler Land Surveying of Brevard, North Carolina indicates the dam crest is at approximately Elevation 2187 feet using a 1983 NGVD datum 2. The above information does not include two add on dikes constructed in approximately 1998 and 2000. To help control seepage through and beneath the dam (from the landfill side), the toe of the dam on the ASB side includes a blanket drain which collects and discharges seepage before emerging at the dam’s toe. In 1998, a 10-foot-high soil dike was added to the top of the dam on the landfill side and in 2000, a second similar dike was added to the top of the first dike. The dikes were added to increase capacity of the landfill. Each dike was constructed on a buildup of geosynthetics and stone, which overlaid previously placed sludge. Examination of Figure 1-2 (see Work Plan) shows exposed geotextile, geogrid, and stone that were used to support the base of the second dike added to the crest of the dam. Both dikes continue to undergo settlement due to consolidation of the underlying sludge. Note that a portion of the second dike (i.e., the 2000 dike) was removed when the landfill was covered in 2009. In 2005, a number of standpipe piezometers were installed in the dam and landfill. Eight of the piezometers in the dam indicate no or little water is present at the bottom of the piezometer’s screened interval. Interpretation of the water elevations calculated from the piezometers indicates much of the dam on the ASB side is unsaturated, possibly due to effective performance of the dam’s toe drain system or possibly due to lack of free-water on the landfill side of the dam to sustain seepage within the dam. The water level elevations in the piezometers were measured on August 15, 2022 and September 8, 2022 and compared to each other and also to water level elevations measured on May 20, 2022. Comparison of the August 15, 2022 and September 8, 2022 elevations showed little water level change in the piezometers. Comparison of the September 8, 2022 elevations with the May 20, 2022 elevations showed that many of the water levels in the piezometers went down during summer 2022. Piezometers measuring Attachment 1 Page 2 water levels with respect to depth within the dam generally indicated presence of a possible phreatic surface at the base of the dam; whereas several piezometers located within the upper half of the dam showed several feet of water in or above the piezometer-screened intervals. The piezometric conditions measured indicate a possible perched water table within a portion of the dam and vertical seepage gradients in the dam close to unity. Between the period of May 20, 2022 and August 15, 2022, the landfill area received approximately 15 inches of rain; the landfill area typically receives 67 inches of rain annually. The landfill was closed in 2009 with a soil cover. The closure construction included regrading most of the landfill surface to promote drainage of surface water to a catch basin and outlet pipe located near the southwestern corner of the landfill. Part of the regrading involved removing approximately 6 feet of the second (uppermost) dike at the approximate sinkhole location. A 30-inch-diameter CMP and a 48-inch-diameter RCP are located near the center of the dam where the sinkhole occurred. • The 30-inch CMP is located at the base of the dam and connects the inward toe of the dam to the outward toe of the dam. The 30-inch CMP is encased in concrete and is sloped to convey stormwater and leachate from a concrete junction box located at the toe of the dam on the landfill side to the ASB on the opposite side of the dam. At its approximate mid-point, the CMP is estimated to be overlain by approximately 65 feet of compacted soil. The concrete junction box is buried beneath approximately 70 feet of sludge. Figure 1-11 (see Work Plan) shows various views of the pipe since 2004. • The 48-inch RCP pipe is located on the landfill side of the dam and is situated on a concrete slab that was placed on the face of the dam’s sideslope. The lower end of the 48-inch RCP terminates in the same concrete junction box as does the 30-inch CMP. The aboveground inlet to the 48-inch RCP is visible in a stone-lined drainage area that runs perpendicular to the dam crest. The inlet to the 48-inch RCP occasionally receives precipitation drainage from the surrounding ground surface. The upper end of the 48-inch RCP is overlain by the two dikes added in 1998 and 2000. The combined thickness of dike soil and sludge overlying the 48-inch RCP is estimated to range from approximately 10 to 70 feet. • A 12-inch-diameter perforated CMP extends from the junction box into the landfill area (below the sludge) over a distance of more than 400 feet. The 12-inch CMP was part of the original landfill construction and was installed to collect and divert water occurring in the work area. The collected water in the 12-inch CMP flows into the junction box and then through the 30-inch CMP to the ASB. Attachment 1 Page 3 PRELIMINARY OBSERVATIONS The following efforts have been made to investigate the sinkhole and it potential cause. • Design drawings and construction documents have been reviewed and showed the 48-inch RCP, the 30-inch CMP, and a 12-inch CMP (from the landfill area) all converging into a concrete junction box, which is located at the toe of the dam on the landfill side. Water enters the junction box from the 48-inch RCP and the 12-inch CMP and flows out of the junction box through the 30-inch CMP. Review of the drawings and documents did not reveal any apparent construction flaws with the dam or its drainage features. • The July 20, 2022 photography and videoing of the pipe interiors showed that 1) the 48-inch RCP appears to be plugged with precipitated minerals and debris. The 48-inch RCP also appears to be disconnected (offset) or collapsed at a point approximately 10 feet below the RCP’s ground surface opening, and 2) the 30-inch CMP was too full of debris for the camera to advance beyond 45 feet into the pipe (from the ASB side). • The topographic survey of the dam surface and the sinkhole on July 20, 2022 did not show any signs of other potential sinkholes in the dam. • The CMP cleaning and photographing on August 10, 2022 showed 1) the presence of a large (immovable) obstruction at distance of approximately 135 feet from the pipe’s opening (on the ASB side), 2) the invert of the CMP appears to have settled several inches at a distance of approximately 38 feet from the pipe’s opening, and 3) the first 135 feet of the 30-inch CMP (less approximately 30 feet of water-filled pipe) appears to be in good condition visually and is free of openings/defects that could allow soil to enter the pipe. The settled portion of the pipe appears to be near full of water for a distance of approximately 38 to 65 feet, at which point the pipe’s invert becomes sufficiently sloped to be above the water level in the pipe. The CMP cleaning also showed that there is no discernable flow occurring along the exterior of the 30-inch CMP. In some cases, material being removed from the 30-inch CMP (during cleaning) was estimated to be approximately 8 inches in size or more. The observed pipe flow on August 22, 2022 suggests the obstruction in the pipe may have been dislodged to allow soil and sludge to be washed through the 30-inch CMP. In addition to the recent investigation findings, on one occasion in spring 2019, cloudy water was observed flowing from the discharge end of the 30-inch CMP, suggesting soil may have been eroding into any one of three pipes at that time. A photo of cloudy water observed in 2019 is shown on Figure 1-16 to the Work Plan. ATTACHMENT 2 PIPE VIDEO INSPECTION JULY 20, 2022 https://spaces.hightail.com/receive/8WoEjQh8Tv AUGUST 10, 2022 https://spaces.hightail.com/receive/TEALW7KYk3 AUGUST 11, 2022 https://spaces.hightail.com/receive/xMP7caZhaf