Loading...
HomeMy WebLinkAboutNCC201074_Modification Review (Contact Changes)_20230427 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 4/17/2023 11:11:21 AM (ADD TO FILE Submittal) Approve by bethany.georgoulias 4/27/2023 1:18:33 PM (Construction COC ADD TO FILE Review-NCC201074) •Legally responsible individual change form provided via email on 4/27/2023. • The task was assigned to bethany.georgoulias.The due date is:April 20,2023 5:00 PM 4/17/2023 11:11:22 AM Ago DEQMODIFICATION Construction Permit for 0i00 0000 Certificate of NCC201074 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Information associated with this permit: Project Name Pfizer Pharmaceuticals GTx2 Contractor Parking Address Oak Park Road,Sanford, NC County Lee Latitude 35.5301 Longitude -79.1826 Permittee Listed Wyeth Holdings LLC Legally Responsible Tony Mulcahy Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2020-1074 E&SC Plan ID LEE-2020-028 Original NOI Tracking 23115 No.* Date COC Issued* 03/19/2020 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) 3 requested modifications: (1)Legally Responsible Individual changed(2)Site Contact changed(3)Annual fee due date extention Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Three permit modifications are requested for this respective stormwater permit: (1 &2)Since the permit's initiation in 2020 the site contact and responsible individual have both changed.The new contacts are listed below: Legally Responsible Person:Jon Tucker/919-566-4310/Jon.Tucker@pfizer.com Site Contact(Authorized Responsible Person): Connor Jarvis/919-566-5210/Connor.Jarvis@pfizer.com (3)Due to the changing in responsibility of this permit's ownership the payment communications for its 4/1/2023 due date was not directly escalated from the division to the current site contact and a Notice of Deficiency was issued due to late payment.A timely payment is now being coordinated. It is respectfully requested that a due date extension is provided to lift the Notice of Deficiency. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) NCC201074 Annual Fee Invoice_20230301 (002).pdf 788.25KB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOI on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person" 'This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature �`��ar�rot IU�f t�rr Type Name* Connor W Jarvis Title* Environmental Manager Organization* Pfizer Date* 04/17/2023 Email Address* Connor.Jarvis@pfizer.com Email for confirmation Telephone Number* 919-566-5210 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee tony.mulcahy@pfizer.com Email Original Site Contact charles.powell@pfizer.com Email Review Date 04/27/2023 Rescinded Since Submitted?