Loading...
HomeMy WebLinkAboutNCC201837_NOT Closeout Documents_20230420 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714,Fayetteville,NC 28301-5094 (910)433-3300 County: Robeson Project: Robeson LNG Facility-Phase 2 River basin: Lumber Person financially responsible:Piedmont Natural Gas Company,Inc.-Bradley Project#: ROBES-2020-002 Patterson,Delegate Address: P.O.Box 33068,Charlotte,NC 28233 1. Project Location: Reverend Bill Road,Wakulla Pictures: No 2. Weather and soil conditions: Sunny,dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes 5. Violations: None 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: See comments. 7. Has sedimentation damage occurred since last inspection? No 8. Contact made with(name): Stephen Williams Title: Lead EHS Inspection report: Sent Report Date given/sent: April 18,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self monitoring or self inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG010000)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01 Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mike Lewis Others present: Nick Mills Date of inspection: April 12,2023 Time arriving on site: 1 l:00 AM Time leaving site: 11:25 AM cc: FRO DEMLR files