HomeMy WebLinkAboutSW3220803_Supplement-EZ Form_20230425SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name
Cresswind - Phase 4
2 Project Area ac
49.19
3 Coastal Wetland Area ac
0
4 Surface Water Area ac
1.6
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of ve etated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1 0034 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
lRainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
IStormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Matthew S. Kiker
28
Organization:
Thomas & Hutton
29
Street address:
1020 Euclid Avenue
30
City, State, Zip:
Charlotte, NC 28203
31
Phone numbers :
980-201-5507
32
Email:
kiker.m@tandh.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
Seal
Signature of Designer
Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so, number of drainage areas/SCMs 1
Is all/part of this project subject to previous rule
3 versions? No
CLICK TO LOAD FORM
DRAINAGE
AREA INFORMATION
ENTIRE SITE
POND 05
4
Type of SCM
N/A
WET POND
5
Total BUA in project (sq ft)
1177540 sf
1177540 sf
6
New BUA on subdivided lots (subject to
permitting) (sq ft)
735000 sf
735000 sf
7
New BUA outside of subdivided lots (subject to
permitting) (so
442540 sf
442540 sf
8
Offsite - total area (sq ft)
sf
sf
9
Offsite BUA (sq ft)
sf
sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft)
183750 sf
183750 sf
Sidewalk (sq ft)
62291 sf
62291 sf
Roof (sq ft)
Roadway (sq ft)
Future (sq ft)
Other, please specify in the comment box
below (sq ft)
196499 sf
196499 sf
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft)
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
Exisitng BUA that will remain (not subject to
permitting) (sq ft)
sf
sf
13
sf
sf
14
Existing BUA that is already permitted (sq ft)
sf
sf
15
Existing BUA that will be removed (sq ft)
sf
sf
16
Percent BUA
55%
55%
17
Design storm (inches)
1 in.
1 in.
18
Design volume of SCM (cu ft)
95975 cf
95975 cf
19
Calculation method for design volume
Simple
Simple
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
1drainage area(s):
WET POND
1
Drainage area number Pond 05
2
GE
Design volume of SCM (cu ft) 95975 cf
L MDC FROM 02H .1050
Is the SCM sized to treat the SW from all surfaces at build -out? 4es
3
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
31
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
DRAWDOWN
ORIFICE
101
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17 Was the SCM designed by an NC licensed professional?
WET POND MDC FROM 02H .1053
Yes
SA/DA
18
Method used
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
569.50
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
570.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
574.00
23
Elevation of the permanent pool (fmsl)
574.50
24
Elevation of the top of the vegetated shelf (fmsl)
575.00
25
Elevation of the temporary pool (fmsl)
576.22
26
Surface area of the main permanent pool (square feet)
37629
27
Volume of the main permanent pool (cubic feet)
136114 cf
28
Average depth of the main pool (feet)
3.95 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
1141.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
32
Volume of the forebay (cubic feet)
26058 cf
33
Is this 15-20 % of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
54 in
35
Design volume of SCM (cu ft)
95975 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
4. in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
-
40
Drawdown time for the temporary pool (days)
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
66 in
44
Depth of forebay at exit (inches)
60 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
61
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda
541
Has a planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):