HomeMy WebLinkAboutSW3210301_Supplement-EZ Form_20230406 SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
PROJECT INFORMATION
1 Project Name Cresswind-Phase 2 and 3
2 Project Area(ac) 107.1
3 Coastal Wetland Area(ac) 0
4 Surface Water Area(ac) 1.06
5 Is this project High or Low Density? High
6 1 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 Is BUA other that as listed in.1003(4)(c-d)out of the setback? Yes
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System 0
12 Bioretention Cell 0
13 Wet Pond 2
14 Stormwater Wetland 0
15 Permeable Pavement 0
16 Sand Filter 0
17 Rainwater Harvesting(RWH) 0
18 Green Roof 0
19 Level Spreader-Filter Strip(LS-FS) 0
20 Disconnected Impervious Surface(DIS) 0
21 Treatment Swale 0
22 1 Dry Pond 0
23 StormFilter 0
24 Silva Cell 0
25 Bayfilter 0
26 Filterra 0
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27 Name and Title: Matthew S.Kiker
28 Organization: Thomas&Hutton
29 Street address: 1020 Euclid Avenue
30 City,State,Zip: Charlotte,NC 28203
31 Phone number(s): 980-201-5507
32 Email: kiker.m@tandh.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and
that the engineering plans,specifications,operation and maintenance agreements and other supporting information are consistent
with the information provided here.
Designer
�1Y1111111flIr ICI I H 11 1.a16 116.
.........OC rN��•�. .�``'',,��1 CAR() ,
` THOMAS
AL & HUTTON _ Signature of Designer
0j+9480 ENGINEERING y
co
No. F-0871
iW't 4'r,
OF
4 2 ,I
Seal Date
DRAINAGE AREAS
1 Is this a high density project? Yes
F3versions?
If so,number of drainage areas/SCMs 2
Is all/part of this project subject to previous rule
No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site P ND 03 P ND 04
4 Type of SCM N/A Wet Pond Wet Pond
5 Total BUA in project(sq ft) 1845405 sf 1228238 sf 617167 sf
New BUA on subdivided lots(subject to
6 permitting)(sq ft) 1150000 sf 802500 sf 347500 sf
New BUA outside of subdivided lots(subject to
7 permitting)(sf) 695405 sf 425738 sf 269667 sf
8 Offsite-total area(sq ft) sf sf sf
9 Offsite BUA(sq ft) sf sf sf
10 Breakdown of new BUA outside subdivided lots:
-Parking(sq ft) 273750 sf 186250 sf 87500 sf
-Sidewalk(sq ft) 84889 sf 55631 sf 29258 sf
-Roof(sq ft) sf sf sf
-Roadway(sq ft) 280471 sf 183857 sf 96614 sf
-Future(sq ft) 56295 sf N/A 56295 sf
-Other,please specify in the comment box
below(sq ft) sf sf sf
New infiltrating permeable pavement on
11 subdivided lots(sq ft) sf sf sf
New infiltrating permeable pavement outside of
12 subdivided lots(sq ft) sf sf sf
Exisitng BUA that will remain(not subject to
13 permitting)(sq ft) sf sf sf
14 Existing BUA that is already permitted(sq ft) sf sf sf
15 Existing BUA that will be removed(sq ft) sf sf sf
16 Percent BUA 40% 62% 81%
17 Design storm(inches) N/A 1 in 1 in
18 Design volume of SCM(cu ft) N/A 105187 cf 49451 cf
19 Calculation method for design volume N/A Simple Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
20 drainage area(s):
WET POND
1 Drainage area number Pond 03 Pond 04
2 Design volume of SCM(cu ft) 100007 cf 49451 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? yes Yes
4 Is the SCM located away from contaminated soils? Yes Yes
5 What are the side slopes of the SCM(H:V)? 3:1 3:1
Does the SCM have retaining walls,gabion walls or other engineered
6 side slopes? No No
Are the inlets,outlets,and receiving stream protected from erosion
7(10-year storm)? Yes Yes
Is there an overflow or bypass for inflow volume in excess of the
8 design volume? Yes Yes
DRAWDOWN
9 What is the method for dewatering the SCM for maintenance? ORIFICE PUMP
10 If applicable,will the SCM be cleaned out after construction? Yes Yes
11 Does the maintenance access comply with General MDC(8)? Yes Yes
12 Does the drainage easement comply with General MDC(9)? Yes Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 General MDC(10)? No No
14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes
16 Does the SCM follow the device specific MDC? Yes Yes
17 Was the SCM designed by an NC licensed professional? Yes as
OND MDC FROM 02H.1053
18 Method used SA/DA SA/DA
19 Has a stage/storage table been provided in the calculations? Yes Yes
Elevation of the excavated main pool depth(bottom of sediment
20 removal)(fmsl) 559.00 562.50
21 Elevation of the main pool bottom-(top of sediment removal)(fmsl) 559.50 563.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 564.50 566.50
23 Elevation of the permanent pool(fmsl) 565.00 567.00
24 Elevation of the top of the vegetated shelf(fmsl) 565.50 567.50
25 Elevation of the temporary pool(fmsl) 566.95 568.69
26 Surface area of the main permanent pool(square feet) 39712 20359
27 Volume of the main permanent pool(cubic feet) 177334 cf 68758 cf
28 Average depth of the main pool(feet) 4.78 ft 3.64 ft
29 Average depth equation used Equation 3 Equation 3
30 If using equation 3,main pool perimeter(feet) 1160.0 ft 666.0 ft
31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft
32 Volume of the forebay(cubic feet) 28875 cf 11430 cf
33 Is this 15-20%of the volume in the main pool? Yes Yes
34 Clean-out depth for forebay(inches) 66 in 48 in
35 Design volume of SCM(cu ft) 100007 cf 49451 cf
36 Is the outlet an orifice or a weir? Orifice Orifice
37 If orifice,orifice diameter(inches) 4.in 3.in
38 If weir,weir height(inches)
39 If weir,weir length(inches) - -
40 Drawdown time for the temporary pool(days) 3 3
Are the inlet(i)and outlet located in a manner that avoids short-
41 circuiting? Yes Yes
42 Are berms or baffles provided to improve the flow path? No No
43 Depth of forebay at entrance(inches) 78 in 60 in
44 Depth of forebay at exit(inches) 72 in 54 in
45 Does water flow out of the forebay in a non-erosive manner? Yes Yes
46 Width of the vegetated shelf(feet) 6 ft 6 ft
47 Slope of vegetated shelf(H:V) 6:1 6:1
Does the orifice drawdown from below the top surface of the
48 permanent pool? Yes Yes
Does the pond minimize impacts to the receiving channel from the 1-
49 yr,24-hr storm? Yes Yes
Are fountains proposed?(If Y,please provide documentation that
50 MDC(9)is met.) No No
51 Is a trash rack or other device provided to protect the outlet system? Yes Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes
53 Species of turf that will be used on the dam and embankment Bermuda Bermuda
541 Has a planting plan been provided for the vegetated shelf? Yes Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
55 wet pond(s):