Loading...
HomeMy WebLinkAbout20221796 Ver 1_Correspondence_20230426ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director MEETING DATE NORTH CAROLINA Environmental Quality April 24, 2023 Project Ocean —Sound Timber Management LLC DWR Project # 20221796 DWR January 6, 2021 Buffer Call NBRRO #20-391 Field Review of previously documented GPS Coordinates for Start Point 1 for Stream Feature B April 11, 2023 ATTENDEES: Sue Homewood, DWR Chris Smith, DWR Jeff Harbor, Terracon David Parker, DC Insight LLC Mike Kane, Capital Civil DWR issued a Buffer Determination Letter to Sound Timber Management LLC on January 6, 2021. The letter identified two portions of Feature B which were subject to the Neuse River Buffer Rules. It was brought to the Division's attention that there appeared to be an error in the coordinates listed for Stop Point 1 of Feature B in the Buffer Determination Letter. The purpose of the site visit was to ensure that all parties were clear on what portion of Feature B was determined to be subject to the Neuse River Buffer Rules by DWR during the site visit conducted on December 23, 2020. The attendees walked to the US Army Corps of Engineers Jurisdictional Determination start point of Feature B. The attendees then walked upstream to the start point 1 of the Neuse Buffer subjectivity as previously identified by DWR staff. Although there was an error in GPS coordinates for the stop point 1 of Feature B in the January 6, 2021 DWR buffer determination letter, the site visit confirmed that the coordinates for start point 1 of Feature B was accurately identified in DWR January 6, 2021 buffer determination letter. North Carolina Department of Environmental Quality I Division of Water Resources 4NORT�HCv 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTHCAROUNA 919.707.9000 Department ofEnvlronmantal Duali�