Loading...
HomeMy WebLinkAbout20150461 Ver 1_401 Application_20150515Montalvo, Sheri A 201 5046 1 From: Homewood, Sue Sent: Saturday, May 09, 2015 9:56 AM To: Montalvo, Sheri A ✓� 1 (J Subject: FW: Stream project in Kernersville. Attachments: PCN1- 4- 2009May062015- GralinSt.pdf; BYSR - Kvillesite- May2015.ppt Hi Sheri, Will you please put this in BIMS as a courtesy copy for me and give it a number. Thank you!! Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Resources — Water Quality Programs 450 W. Hanes Mill Rd, Suite 300 (Please note my new contact information) Winston Salem NC 27105 Voice: (336) 776 -9693 Cell: (336) 813 -1863 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wendi Hartup [mailto:wwhartupCs1ncsu.edu] Sent: Friday, May 08, 2015 5:11 PM To: Homewood, Sue Subject: Fwd: Stream project in Kernersville. Sue, Just wanted to share with you that I've sent in the PCN for the project I'm doing with the Town of Kernersville (you'll get an ad about it soon). John Thomas wanted me to submit one since we'll be doing a temporary stream crossing so that we can grade the other bank. The project site is a tributary stream of Reedy Fork. The Town of Kernersville will be grading two sides of the creek off Gralin St in Kernersville to a 3 :1 slope (town property). The entire project stream length is 164 linear ft. In the attached you'll find a map of the area and some pictures of the creek. Owner Name: Town Of Kernersville Property Address: 406 Gralin ST 36.122428, - 80.061724 The area will then be seeded, strawed, matted and planted with volunteers during a workshop, Backyard Stream Repair. This is very similar to the workshop I did a few years ago in Clemmons, NC. Wendi • Wendi Hartup, Natural Resources Extension Agent wwhartupgncsu.edu North Carolina Cooperative Extension, Forsyth County, 1450 Fairchild Rd, Winston - Salem, NC 27105 Phone: 336- 703 -2858, Cell: 336 -529 -0238, Fax: 336 - 767 -3557 http: / /forsyth.ces.nesu.edu and http: / /forsyth.cc /ces Stain Jn —py Add State Unn�etei;y ±* * COOPERATIVE EXTENSION s� eTO—fi ng re;,urd North Carolina Cooperative Extension brings the resources of our land -grant universities, NC State University and NC A &T State University, to citizens of the State. I invite you to stop by or call our office to learn more about the many ways your Extension office can serve you. NOTE: ALL e -mail communication is subject to be accessed by the news media and the public pursuant to the Public Records Law of North Carolina. �� qtr a'rgfi� tai y n ^r Office Use Only: Corps action ID no DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 33 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑X Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: 406 Gralin St, Kernersville Streambank Stabilization 2b. County: Forsyth 2c. Nearest municipality / town: Kernersville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Town of Kernersville 3b. Deed Book and Page No. 2299 -748 3c. Responsible Party (for LLC if applicable): Curtis Swisher 3d. Street address: PO Box 728 3e. City, state, zip: Kernersville, NC 27285 3f. Telephone no.: 336- 992 -0305 3g. Fax no.: 3h. Email address: cswisher @toknc.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History , 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 6886 -65 -5227 1 b. Site coordinates (in decimal degrees): I Latitude: 36.122428 Longitude: -80.061724 1 c. Property size: 3.28 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Reedy Fork 2b. Water Quality Classification of nearest receiving water: na 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Banks are incised by 5' -8' and vegetation is currently grass with several' trees. Approximately 74.13 ac drains into the tributary. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200 3d. Explain the purpose of the proposed project: Gain access to other side of streambank to grade banks for stabilization with better vegetation. 3e. Describe the overall project in detail, including the type of equipment to be used: Using low ground pressure vehicles. Ford will contain fabric covered by 2 " -3" of washed 57 stone. Wood will be laid on top for tracks. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes No ❑ Unknown . Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? E] Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. J Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) —Temporary W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Stabilization tributary stream of Reed PER Corps 5 20 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 20 3i. Comments: 20' temporary ford for construction access Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. 4a. Open water impact number Permanent (P) or T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) —Temporary 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number– Permanent (P) or T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet —Temporary B1 Yes /No B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stabilizing a degraded bank. Utilizing a ford to access other bank that is degraded as well. It will be restored back pre - project conditions (where ford is laid). 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Using low ground pressure vehicles. Ford will contain fabric covered by 2 " -3" of washed 57 stone. Wood will be laid on top for tracks. It will be placed 50' from the Gralin St headwall. Bank grading will not disturb channel depth or location but will occur above ordinary high water mark. Temporary seeding and matting until permanent vegetation is established. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Water will sheetflow across landscape. ❑ Yes ❑X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? oho 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No stormwater management because we are improving. infiltration as a result of adding a buffer and the entire property is only 0.56 ac. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑X Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑X Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes [Z No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) NC Forest Service, Urban and Community Forestry Comments: Grant Program 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? El Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑X No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes M No 5 yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://www.fws-goviraleigh/species/cntylist/forsyth.htm) 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes XQ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://www.habitat.noaa.gov/protection/efh/habitatmapper.htmI 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes QX No status (e,g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http:// www.hpo.ncdcr.gov /NR- PDFs.htMi. http: / /gis.ncder.gov /hpoweb/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Forsyth County Geodata (http: // maps .co.forsyth.nc.us /forsythjs /) Applicant/Agent's Printed Name .Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 L, I ec, -0 a E) _LS uilej!E) 9017 -ssE)jppV A�jadojcj @jj!ASJ9uJaA JO UMO.L.@WEN JE)UAAO Sfi'�Ij LIJASJOJ -,w welo gor Looking downstream -Will grade both sides 3:1 slope -Left side all needs grading ( -164') 6" -1' above water) -Right side about half needs grading (1' above water is ordinary high water)