HomeMy WebLinkAbout20150461 Ver 1_401 Application_20150515Montalvo, Sheri A
201 5046 1
From: Homewood, Sue
Sent: Saturday, May 09, 2015 9:56 AM
To: Montalvo, Sheri A ✓� 1 (J
Subject: FW: Stream project in Kernersville.
Attachments: PCN1- 4- 2009May062015- GralinSt.pdf; BYSR - Kvillesite- May2015.ppt
Hi Sheri,
Will you please put this in BIMS as a courtesy copy for me and give it a number. Thank you!!
Sue Homewood
NC DENR Winston -Salem Regional Office
Division of Water Resources — Water Quality Programs
450 W. Hanes Mill Rd, Suite 300 (Please note my new contact information)
Winston Salem NC 27105
Voice: (336) 776 -9693
Cell: (336) 813 -1863
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
From: Wendi Hartup [mailto:wwhartupCs1ncsu.edu]
Sent: Friday, May 08, 2015 5:11 PM
To: Homewood, Sue
Subject: Fwd: Stream project in Kernersville.
Sue,
Just wanted to share with you that I've sent in the PCN for the project I'm doing with the
Town of Kernersville (you'll get an ad about it soon). John Thomas wanted me to submit one
since we'll be doing a temporary stream crossing so that we can grade the other bank.
The project site is a tributary stream of Reedy Fork. The Town of Kernersville will be grading
two sides of the creek off Gralin St in Kernersville to a 3 :1 slope (town property). The entire
project stream length is 164 linear ft. In the attached you'll find a map of the area and some
pictures of the creek.
Owner Name: Town Of Kernersville
Property Address: 406 Gralin ST 36.122428, - 80.061724
The area will then be seeded, strawed, matted and planted with volunteers during a workshop,
Backyard Stream Repair. This is very similar to the workshop I did a few years ago in Clemmons,
NC.
Wendi •
Wendi Hartup, Natural Resources Extension Agent
wwhartupgncsu.edu
North Carolina Cooperative Extension, Forsyth County, 1450 Fairchild Rd, Winston - Salem, NC 27105
Phone: 336- 703 -2858, Cell: 336 -529 -0238, Fax: 336 - 767 -3557
http: / /forsyth.ces.nesu.edu and http: / /forsyth.cc /ces
Stain Jn —py
Add State Unn�etei;y
±* * COOPERATIVE
EXTENSION
s� eTO—fi ng re;,urd
North Carolina Cooperative Extension brings the resources of our land -grant
universities, NC State University and NC A &T State University, to citizens of the State. I invite you to stop by
or call our office to learn more about the many ways your Extension office can serve you.
NOTE: ALL e -mail communication is subject to be accessed by the news media and the public pursuant to the
Public Records Law of North Carolina.
�� qtr a'rgfi�
tai
y
n ^r
Office Use Only:
Corps action ID no
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 33 or General Permit (GP) number:
1 c.
Has the NWP or GP number been verified by the Corps?
❑X Yes ❑ No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑X Yes ❑ No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ❑X No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
406 Gralin St, Kernersville Streambank Stabilization
2b.
County:
Forsyth
2c.
Nearest municipality / town:
Kernersville
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Town of Kernersville
3b.
Deed Book and Page No.
2299 -748
3c.
Responsible Party (for LLC if
applicable):
Curtis Swisher
3d.
Street address:
PO Box 728
3e.
City, state, zip:
Kernersville, NC 27285
3f.
Telephone no.:
336- 992 -0305
3g.
Fax no.:
3h.
Email address:
cswisher @toknc.com
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
B.
Project Information and Prior Project History ,
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
6886 -65 -5227
1 b.
Site coordinates (in decimal degrees):
I Latitude: 36.122428 Longitude: -80.061724
1 c.
Property size:
3.28 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
Reedy Fork
2b.
Water Quality Classification of nearest receiving water:
na
2c.
River basin:
Cape Fear
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Banks are incised by 5' -8' and vegetation is currently grass with several' trees. Approximately 74.13 ac drains into the tributary.
3b.
List the total estimated acreage of all existing wetlands on the property:
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200
3d. Explain the purpose of the proposed project:
Gain access to other side of streambank to grade banks for stabilization with better vegetation.
3e. Describe the overall project in detail, including the type of equipment to be used:
Using low ground pressure vehicles. Ford will contain fabric covered by 2 " -3" of washed 57 stone. Wood will be laid on top for tracks.
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes No ❑ Unknown .
Comments:
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
E] Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑Yes ❑X No ❑ Unknown
5b.
If yes, explain in detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑X No
6b.
If yes, explain.
J
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
—Temporary
W1
Choose one
Choose one
Yes /No
-
W2
Choose one
Choose one
Yes /No
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
Yes /No
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 T
Stabilization
tributary stream of Reed
PER
Corps
5
20
S2
Choose one
S3
Choose one
S4
Choose one
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
20
3i. Comments:
20' temporary ford for construction access
Page 4 of 10
PCN Form —Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivii ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
—Temporary
01
Choose one
Choose
O2
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number–
Permanent (P) or
T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet )
6g.
Zone 2
impact
(square
feet
—Temporary
B1
Yes /No
B2
Yes /No
B3
Yes /No
B4
Yes /No
B5
Yes /No
B6
Yes /No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Stabilizing a degraded bank. Utilizing a ford to access other bank that is degraded as well. It will be restored back pre - project conditions (where ford is
laid).
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Using low ground pressure vehicles. Ford will contain fabric covered by 2 " -3" of washed 57 stone. Wood will be laid on top for tracks. It will be placed
50' from the Gralin St headwall.
Bank grading will not disturb channel depth or location but will occur above ordinary high water mark. Temporary
seeding and matting until permanent vegetation is established.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑X No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
la.
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b.
If yes, then is a diffuse flow plan included? If no, explain why.
Water will sheetflow across landscape.
❑ Yes ❑X No
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
oho
2b.
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why:
No
stormwater management because we are improving. infiltration as a result of adding a buffer and the entire property is only 0.56 ac.
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e.
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government Stormwater Review
3a.
In which local government's jurisdiction is this project?
❑X Phase II
❑ NSW
3b.
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
❑Yes ❑X No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a.
Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply):
❑ Session Law 2006 -246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal /state /local) funds or the
❑X Yes ❑ No
use of public (federal /state) land?
1 b.
If you answered "yes' to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes [Z No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes' to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.) NC Forest Service, Urban and Community Forestry
Comments: Grant Program
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑Yes ❑X No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after - the -fact permit application?
El Yes ❑X No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? ❑ Yes ❑X No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts? ❑ Yes M No
5 yes, indicate the USFWS Field Office you have contacted. Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
http://www.fws-goviraleigh/species/cntylist/forsyth.htm)
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes XQ No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
http://www.habitat.noaa.gov/protection/efh/habitatmapper.htmI
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation Yes QX No
status (e,g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
http:// www.hpo.ncdcr.gov /NR- PDFs.htMi. http: / /gis.ncder.gov /hpoweb/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑X No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Forsyth County Geodata (http: // maps .co.forsyth.nc.us /forsythjs /)
Applicant/Agent's Printed Name .Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
L, I ec, -0 a E)
_LS uilej!E) 9017 -ssE)jppV A�jadojcj
@jj!ASJ9uJaA JO UMO.L.@WEN JE)UAAO
Sfi'�Ij LIJASJOJ -,w
welo gor
Looking downstream
-Will grade both sides
3:1 slope
-Left side all needs
grading ( -164') 6" -1'
above water)
-Right side about half
needs grading (1'
above water is ordinary
high water)