HomeMy WebLinkAbout20230574 Ver 1_Riparian Buffer Authorization Request_20230419Original Submittal 4/19/2023
A. Owner/Applicant Information
General Information Q
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Primary Contact Email: * cstrawn@cravencountync.gov
Please list the contact person's email for questions or payment on this project if needed.
Who is submitting the application?* O Owner
0 Applicant other than Owner
O Agent
Is there an agent working on this application but Yes
not submitting it? No
1. Property Owner Information:
..............................................................................................................................................................................................................
1a. Name on Recorded Deed:*
John McClain
1b. Responsible Party:
(for Corporations)
1c. Mailing Address:*
Street Address
915 Butler Ford Rd.
Address Line 2
City
Vanceboro
Postal / Zip Code
28586
1 d. Telephone:* 252-636-6618
2. Applicant's Information (if different from owner):
2a. Name: Craven County
2b. Company Affiliation:
2c. Mailing Address:
2d. Telephone:
2e. Email Address:
Craven County
Street Address
2828 Neuse Blvd.
Address Line 2
City
New Bern
Postal / Zip Code
28560
252-636-6618
State / Province / Region
NC
Country
United States
le. Email Address:* cstrawn@cravencountync.gov
cstrawn@cravencountync.gov
State / Province / Region
NC
Country
United States
B. Project Information and Prior Project History
1. Project Information
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
1a. Name of Project:* Butler Ford/Little Swift Creek Boat Ramp
(Subdivision, facility, or establishment name)
1b. Is this a publicly -funded transportation project?*
Yes
No
1d. Subdivision Name: N/C
le. Nearest Municipality: Vanceboro
1f. Property Size: 6.26
acres
1 g. County (or Counties) where the project is located:*
Craven
1 h. Property ID# Date of Purchase
1-053-105 10/26/2001
Tax PIN or Parcel id
1 i. Deed Information
Type of Book Book#11 Page#
Deed F
1016
-1
Map F
222
1 j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach document
915 Butler Ford Map.pdf 3.42MB
PDF only
1 k. How would you like to provide the Latitude and Longitude information?
Address Lookup
Manually
Latitude* 35.345830 Longitude*-77.196368
11. Is the project located in any of North Carolina's twenty coastal counties?* Yes
No
1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)?
Yes
No
2. Surface Waters
2a. Name of the nearest body of water to proposed project: * Swift Creek
2b. Water Quality Classification of nearest receiving water: SC;Sw,NSW
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
62,026
(linear feet only)
3. Project Description:
.....................
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Current conditions on the property include a residential structure with a public trust access point for boat, kayak etc launch.
3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Click the upload button or drag and drop files here to attach document
915 Butler Ford Rd (Topo).pdf 324.25KB
PDF only
3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site.
Click the upload button or drag and drop files here to attach document
915 Butler Ford Rd. (Soil Survey).pdf 2.03MB
PDF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:
Activity will involve the reestablishment of the existing public trust access road that has existed for 60 years that was originally
installed to assist in the construction of the Butler Ford Bridge. The improvement will include the placement of a geogrid base to
secure the ABC stone that will be used to improve the access ramp to Swift Creek. This will assist in preventing erosion of surface
material into Swift Creek during the County's usage during our StRAP (Streamflow Rehabilitation Assistance Program) program and
the general public for future years of usage. The type of equipment to be used are as follows: Dump truck for material delivery, Skid
Steer, Smooth Drum Roller as well as necessary hand tools. No removal of sediment, vegetation or root mat disturbance will take
place.
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach document
Butler Ford —Swift Creek Access Plan.pdf 1.72MB
PDF only
5. Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project
(including all prior phases) in the past?*
Yes
No
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?
Yes
No
7. Future Project Plans
7a. Is this project a phased project?* Yes
No
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
Neuse River Basin (15A NCAC 02B.0233)
Catawba River Basin (15A NCAC 02B.0243)
Randleman Lake Watershed (15A NCAC 02B.0250)
Tar -Pamlico River Basin (15A NCAC 02B.0259)
Jordan Lake Watershed (15A NCAC 02B.0267)
Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2
Swift Creek Access Ramp
Swift Creek
Permanent (P)
Allowable
421.00
375.00
Map label (e.g. Road Crossing 1)
Perm or Temp
Square Feet
Square Feet
Total Zone 1 Impacts: 421.00
Total Zone 2 Impacts: 375.00
Total Buffer Impacts: 796.00
Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
Silt fencing will be used to address any runoff during the construction phase of the Swift Creek Access Ramp, Project will stay within
the existing impervious surface area already being utilized for access to the creek.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
All work to be done by the contractors will be managed by our consultant/project managers to maintain project consistency and in
environmentally sound manner. No heavy machinery will be used to remove, or impact adjacent soils and vegetation in the vicinity.
E. Diffuse Flow Plan
1a. What type of SCM are you providing?*
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Proposed project will not create concentrated stormwater flow through the buffer
Other SCM that removed minimum of 30% nitrogen
1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document
Swift Creek Access —Silt Fence.pdf 1.11 MB
PDF only
F. Supplementary Information
Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes
No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface
Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
Yes
No
2b. Is this an after -the -fact buffer authorization application?
Yes
No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: Click the upload button or drag and drop files here to attach document
PDF only
Additional Comments:
H. Sign and Submit
By digitally signing below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions
Act')
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the application form."
Print Name:* Chad Strawn
Signature
6J.f-wlc9t"Iw
Submission Date: 4/19/2023
(Auto populated field)
Initial Review
Is this accepted into the review process?* Yes No
Is this project a public transportation project?* � Yes
No
ID#* 20230574
Version: *
Select Reviewer: *
Select Reviewing Office*
Has payment been received?*
Robert Tankard:robert.tankard@ncdenr.gov
Washington Regional Office - (252) 946-6481
No Payment Needed
Fee Received
Need Fee - send electronic notification