Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC231180_ESC Approval Submitted_20230425
DocuSign Envelope ID:6401 D9A2-C89D-44B6-B4F6-13E6C48AC5E4 ROY COOPER Governor l� EUZABETH a BISER 4 ^ n Secretor BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 28, 2022 LETTER OF APPROVAL WITH MODIFICATIONS South Oak Partners, LLC Attention: David Tibbals, Manager 8111 Sealey Court Charlotte,North Carolina 28277 RE: Project Name: Heath and Main Mass Grading Project ID: STANL-2023-008 Acres Approved: 4.4 County: Stanly City: Albemarle Location: Heath Street River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: V3 Southeast Date Received by LQS: November 16, 2022 Plan Type: Revised Dear Mr. Tibbals: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) faun requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Direct questions about the eNOI faun to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources aIII,-S) Mooresville Regional Office I 610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 t(U,,!t:.tEfl _.__:_'s*-nuttrl41a9:{ 704.663,1699 DocuSign Envelope ID:6401 D9A2-C89D-44B6-B4F6-13E6C48AC5E4 Letter of Approval with Modifications South Oak Partners, LLC November 28, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is deteuuined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended foiui if there is any change in the information included on the foam. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, DocuSigned by: 8B37DAC4A10E49A... Kenny S. Llywelyn Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: V3 Southeast Attn: Nicholas Vesley 2923 South Tryon Street, Suite 320 Charlotte,NC 28203 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Resources 11 Mooresville Reginal Office I 610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 gCZtai E:::-1 usr4 wit"\/101, 704.663,1699 DocuSign Envelope ID:6401 D9A2-C89D-44B6-B4F6-13E6C48AC5E4 • Letter of Approval with Modifications South Oak Partners, LLC November 28, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Health and Main Mass Grading Project ID: STANL-2023-008 County: Stanly Reviewed by: Kenny S. Llywelyn 1. Clean water bypass channels need to be stabilized immediately after installation. Sod or rip rap with lining can be used to achieve this requirement. 2. Registered Agent information on the FRO form needs to be filled out with the appropriate required infolination. • North Carolina Department of Environmental Quality I Division of Energy,Mineral and Resources `' Mooresville Reginal Office I 6l0 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 p rtofEc r_ I(1' 704.663.1699 i , -e n N N ra 2. , " ® N 4 . 11/ AD P *1 CD fP (1 2 i c ® ® Cr F4` *6181 : © 1. � m ® P° cin ,..o.. zr Iv .?),- Pi— =.' tiffil �. W n E 7:1 et .1 -3 f ..s. ,.., :4 VAT, o St. t4.4 ra. .—t = *1 t—A PaD 4. ''.\ I. `Iry '-f ca el ° ® co Ili >r- Cie) k< >*" CD CD= ® ® con - °�° ® ® # _ c01 � tea. `� CD 6 rD