Loading...
HomeMy WebLinkAboutNC0026123_2023_04_PCI_20230420NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Wafter Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l 1. Control Authority (POTW) Name: Asheboro WWTP 2. Control Authority Representative(s): Sarah Laughlin 3. Title(s): Technical Services Manager 4. Last Inspection Date: 5/10/2022 Inspection Type (Check One): N PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? N YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? N YES ❑ NO Order Type, Number, Parameters:... Are Milestone Dates Being Met? ❑ YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY NC 0026123 04/20/20 7. Current Number Of Significant Industrial Users (SIUs)? 14 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 1-Metlab #4 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 7 16. Number of CIUs in SNC? L 6 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? N YES ❑ NO 1,4-Dioxane ❑ YES N NO SNC for Limits: NA SNC for Reporting: NA Not Published: NA NA ❑ YES N NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? NYES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? NYES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? NYES ❑ NO Is Table Adequate? NYES ❑ NO NC DWR Pretreatment Compliance Inspection (PCI) Form Updated August 2022 Page 1 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? MYES ❑ NO (Division Inspector, please verify yourself) LTMP is conducted in March, June, September and December. 26. If NO to 23 - 26, list violations ... 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES M NO If yes, which ones? Eliminated:... Added:.. . 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 5/13/2022 M Yes ❑ No Awaiting approval ❑ Yes ❑ No ... Industrial Waste Survey (IWS) 4/6/2023 M Yes ❑ No Awaiting approval ❑ Yes ❑ No ... Sewer Use Ordinance (SUO) 10/23/2012 M Yes ❑ No 11/15/2012 M Yes [:]No_ Enforcement Response Plan (ERP) 1/13/2020 M Yes ❑ No 2/5/2020 M Yes ❑ No Long Term Monitoring Plan (LTMP) 2/18/2020 M Yes ❑ No 5/7/2020 M Yes ❑ No ... POTW Interview Notes: POTW received a NOV for 1,4-dioxane 3/9/2023. Ms. Laughlin reports no problems related to industrial discharges and has had no industries in SNC over the past two semi-annual periods. One dental practice is under construction and once complete, a compliance report (dental amalgam rule) will be completed. LTMP is being conducted properly. Proposed changes in POTWpermit renewal (currently in DRAFT): • IWC—Ammonia nitrogen limits have been revised. • RPA show no potential for total chromium & total zinc, so they have been removed. RPA shows potential to violate standards for total silver, bromodichloromethane and 1,4-Dioxane. These parameters have been added. Quarterly monitoring of total selenium has been added due to RPA • SOC has been added to permit for total silver (WER study) or (CAP) 5-year phased SOC for 1, 4-Dioxane • Instream monitoring for dioxane has been added. • PFAS quarterly monitoring has been added starting 6 months when EPA has a final ww method MMP has been added (Hg) • Instream monitoring of nutrients added. The 1, 4-dioxane SOC directs that all IUPs are modified or re -issued; new IUPs are issued; and/or other pretreatment program mechanisms are completed to ensure compliance with the interim or final 1,4-dioxane limits. The permittee may provide a pretreatment SOC for a given IUP that does not exceed the time to match the NPDES permit compliance schedule. 10#: Metlab #4 has not been in operation — not in production. NC DWR Pretreatment Compliance Inspection (PCI) Form Updated August 2022 Page 2 INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name Pacific 2. Randolph #5 �FGeorgia IF �FTMetlab Packing 30. IUP Number 2026 0320 3634 31. Does File Contain Current Permit? M Yes ❑ No M Yes ❑ No M Yes ❑ No 32. Permit Expiration Date 7/29/27 7/29/27 7/29/27 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or NA NA F 433 N/A I 34. Does File Contain Permit Application Completed M Yes ❑ No F M Yes ❑ No M Yes ❑ No 1 Within One Year Prior to Permit Issue Date? 35. Does File Contain an Inspection Completed Within N Yes ❑ No I M Yes ❑ No F M Yes ElNo Last Calendar Year? 36. a. Does the File Contain a Slug/Spill Control Plan? a M Yes ❑ No a. M Yes ❑ No a. M Yes ❑ No b. If No, is One Needed? (See Inspection Form from b. ❑ Yes ❑ No b. ❑ Yes ❑ No b. ❑ Yes ❑ No POTW 37. For 40 CFR 413 and 433 TTO Certification, Does ❑ Yes ❑ No M NA ❑ Yes ❑ No M NA M Yes ❑ No ❑ NA File Contain a Toxic Organic Management Plan (TOMP)? 38. a. Does File Contain Original Permit Review Letter a. ❑Yes NNo a. ❑Yes NNo a. ❑Yes NNo from the Division? b. All Issues Resolved? b. El Yes ❑ No N/A ® b.❑ Yes ❑ No N/A ® b.❑ Yes ❑ No N/A 39. During the Most Recent Semi -Annual Period, Did the Yes ❑ No N Yes El NO M Yes El No POTW Complete its Sampling as Required by IUP, E includingflow? 40. Does File Contain POTW Sampling Chain -Of- M Yes ❑ No I M Yes ❑ No F M Yes ❑ No F Custody Forms? 41. During the Most Recent Semi -Annual Period, Did the N Yes ❑ No ❑ NA M Yes ❑ No ❑ NA N Yes ❑ No ❑ NA SIU Complete its Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did M Yes ❑ No ❑ NA M Yes ❑ No ❑ NA M Yes ❑ No ❑ NA SIU submit all reports on time? 42a. For categorical IUs with Combined Wastestream ❑ Yes ❑ No M NA ❑ Yes ❑ No M NA ❑ Yes ❑ No M NA Formula (CWF), does file include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, ❑ Yes ❑ No M NA ❑ Yes ❑ No M NA ❑ Yes ❑ No N NA does file include production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did M Yes ❑ No N Yes ❑ No M Yes ❑ No the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did M Yes ❑ No ❑ NA M Yes ❑ No ❑ NA M Yes ❑ No ❑ NA the POTW Identify All Reporting Non -Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) a. N Yes ❑ No ❑ NA a. N Yes ❑ No ❑ NA a. N Yes ❑ No ❑ NA of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW b M Yes ❑ No ❑ N/A b M Yes ❑ No ❑ N/A b M Yes ❑ No ❑ N/A Within 30 Days? c. If applicable, Did POTW resample within 30 days c. M Yes ❑ No ❑ N/A c. M Yes ❑ No ❑ N/A c. M Yes ❑ No ❑ N/A of becoming aware of SIU limit violations in the POTW's sampling of the SIU? 46. During the Most Recent Semi -Annual Period, Was ❑ Yes M No ❑ Yes M No ❑ Yes M No the SIU in SNC? 47. During the Most Recent Semi -Annual Period, Was El Yes ❑N No ❑ N/A ❑Yes ® No ❑ N/A ❑Yes ® No ❑ N/A Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑ Yes ❑ No M NA 11 ❑ Yes ❑ No M NA 11 ❑ Yes ❑ No M NA NC DWR Pretreatment Compliance Inspection (PCI) Form Updated August 2022 Page 3 49. Does The File Contain Proof Of Penalty Collection? 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes ❑ No M NA 11 ❑ Yes ❑ No M NA I ❑ Yes ❑ No M NA a. ❑ Yes ❑ No N/A N b ❑ Yes ❑ No N/A N a. ❑ Yes ❑ No N/A N b ❑ Yes ❑ No N/A N a. ❑ Yes ❑ No N/A N b ❑ Yes ❑ No N/A N ❑ Yes M No ❑ Yes M No ❑ Yes M No FILE REVIEW COMMENTS: #38: IUPs were submitted July 2022 and have not received an approval letter from MPU/PERCS IWS, HWA have been submitted, but have not received an approval letter from MPU/PERCS. IWS was recently submitted on 4/6/2023. HWA was submitted on 5/3/2022. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY Click or tap here to enter text. 1.Industry Inspected: _Click or tap here to enter text. 2. Industry Address: Click or tap here to enter text. 3. Type of Industry/ProductClick or tap here to enter text. 4. Industry Contact: Click or tap here to enter text. Title:Click or tap here to enter text. Phone:Click or tap here to enter text. Fax: -Click or tap here to enter text. 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES LINO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: Nu uvvK Pretreatment omp lance inspection orm upciatea Augustage OVERALL SUMMARY AND COMMENTS: Comments: Overall, Ms. Laughlin operates a good pretreatment program. Requirements: . Recommendations: . NOD: ❑YES ® NO NOV: ❑YES ® NO QNCR: ❑YES ® NO POTW Rating: Satisfactory ® Marginal ❑ Unsatisfactory-0 PCI COMPLETED BY: Tricia Lowery DATE: 4/20/2023 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated August 2022 Page 5