Loading...
HomeMy WebLinkAboutNC0026123_202304PCI_Cover Letter_20230421ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director John N. Ogburn III City Manager PO BOX 1106 Asheboro, NC 27204-1106 NORTH CAROLINA Environmental Quality April 21, 2023 SUBJECT: Pretreatment Compliance Inspection (PCI) Asheboro WWTP Main Program Permit (NPDES) #NC0026123 Randolph County Dear Mr. Ogburn: On 4/20/2023 a Pretreatment Compliance Inspection (PCI) was performed by Tricia Lowery of the Winston-Salem Regional Office. Sarah Laughlin was present for the inspection. The purpose of this inspection was to determine the effectiveness of the city's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 9.0 MGD permitted facility. The city has 14 Significant Industrial Users (SIUs), 7 of which are categorical. The publicly owned treatment works (POTW) had 1 violation since last PCI. POTW Interview POTW received a NOV for 1,4-dioxane 3/9/2023. Ms. Laughlin reports no problems related to industrial discharges and has had no industries in SNC over the past two semi-annual periods. One dental practice is under construction and once complete, a compliance report (dental amalgam rule) will be completed. ]UPS were submitted July 2022 and have not received permit review letters from Division. Pretreatment Program Elements Review The Headworks Analysis (HWA) is currently awaiting approval. The HWA was submitted to the Division on 5/13/2022. The IWS is currently awaiting approval. The IWS was submitted to the Division on 4/6/2023. The Sewer Use Ordinance (SUO) was approved on 11/15/2012. The Enforcement Response Plan (ERP) was submitted on 1/13/2020 and approved on 2/5/2020. DffNorth Carolina Department of Environmental Quality I Division of Water Resources oan caaouNn Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 M336.776.9800 oep.m.m or em�nmen� Qualm The Long -Term Monitoring Plan (LTMP) was submitted 2/18/2020 and approved on 5/7/2020. LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies (4/year during the months of March, June, September, and December). Industrial User Permit (IUP) File Review A review of the file for Georgia Pacific (#2026) revealed that the monitoring data was well organized and compliant. A review of the file for Randolph Packing (#0320) revealed that the monitoring data was well organized and compliant. A review of the file for Metlab #5 (#3634) revealed that the monitoring data was well organized and compliant. The slug control plan for Georgia Pacific (#2026) was in good order. The slug control plan for Randolph Packing (#0320) was in good order. The slug control plan for Metlab #5 (#3634) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. Laughlin runs an adequate pretreatment program. If you have any questions, please contact Tricia Lowery or me at (336) 776-9800. Sincerely, / D-ocu Siiggned by: (�7n. l 5mler 145B49E225CMEA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Attachment: 1. NC DWR Pretreatment Compliance Inspection (PCI) Report REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Raleigh, North Carolina 27105 NORTH CAROLINA 336.776.9800 naparMeM of EmironmanW 9uallly